Entry  Mon Apr 8 21:11:14 2013, Koji, Optics, General, PZT assembly gluing 
   +  Reply  Tue Apr 9 13:56:09 2013, Koji, Optics, General, PZT assembly post gluing / pre baking pictures 
Entry  Thu Apr 11 15:10:22 2013, Koji, General, General, OMC Progress 
Entry  Sat Apr 13 21:06:02 2013, Koji, Optics, General, OMC Bottom-side: cavity glued Cav_scan_response_130412_Pitch.pdfCav_scan_response_130412_Yaw.pdf
Entry  Tue Apr 16 00:40:45 2013, Koji, Optics, General, PD/QPD path gluing ~ preparation 
Entry  Wed Apr 17 07:30:04 2013, Koji, Optics, General, QPD path glued 
Entry  Thu Apr 18 11:43:59 2013, Koji, General, General, Mounting Glass Bracket Failure 
Entry  Thu Apr 18 11:59:02 2013, Koji, General, General, DCPD path gluing 
Entry  Fri May 3 21:09:08 2013, Koji, General, General, OMC is back 
Entry  Wed May 8 15:36:50 2013, Koji, General, General, Latest OMC schedule 
Entry  Fri May 10 09:33:22 2013, Koji, Supply, General, COMSOL simulation on the glass bracket stress COMSOL1.png
Entry  Mon May 13 14:59:16 2013, Koji, Mechanics, General, Invar shim gluing 
   +  Reply  Mon May 13 15:00:23 2013, Koji, General, General, Current most reliable OMC schedule 
Entry  Tue May 14 19:06:00 2013, Koji, Clean, General, OMC Baking 
Entry  Mon May 20 14:59:21 2013, Koji, General, General, OMC is out from the oven 
   +  Reply  Tue May 21 18:28:08 2013, Koji, General, General, Current most reliable OMC schedule 
Entry  Thu May 23 23:41:48 2013, Koji, Mechanics, General, DCPD/QPD Mount 
Entry  Thu May 30 14:38:42 2013, Koji, Electronics, General, Cable fitting  
Entry  Thu May 30 15:00:28 2013, Koji, Optics, General, QPD alignment 
   +  Reply  Fri May 31 05:46:54 2013, Koji, Optics, General, QPD alignment QPD1.JPGQPD2.JPGQPD_calib.nb.zip
Entry  Mon Jun 3 21:19:03 2013, Koji, General, General, Planning 
Entry  Wed Jun 5 18:19:51 2013, Koji, General, General, Some recent photos from the OMC final test at CIT 
Entry  Wed Jun 5 18:51:31 2013, Koji, General, General, L1 OMC shipped out CAM00011.jpgP6054027.JPG
Entry  Fri Jun 7 16:04:44 2013, Koji, General, General, [LLO] OMC arrived 
Entry  Mon Jun 10 10:04:37 2013, Koji, General, General, [LLO] OMC Test OMC_pow_cal.pdfresponsivity.pdfOMC_pow_cal_compensated.pdf
Entry  Thu Jun 13 12:04:57 2013, Koji, General, General, [LLO] OMC Optical Test - completed 
Entry  Thu Jun 13 12:12:20 2013, Zach, General, General, [LLO] OMC and OMCS in LVEA 
Entry  Fri Jun 14 06:35:21 2013, Jeff, General, General, [LLO] L1 OMC status preamp_arrangement.png
Entry  Tue Jun 18 15:45:38 2013, Koji, General, General, [LLO] OMC installation in HAM6 
Entry  Fri Jun 28 12:20:49 2013, Koji, General, General, Dmass's loan of Thorlabs HV amp 
Entry  Fri Aug 9 10:09:56 2013, Koji, General, General, PZT Assembly #3/#4 PZT_assembly.pdf
   +  Reply  Mon Aug 12 20:22:19 2013, Koji, General, General, PZT Assembly #5/#6 
Entry  Fri Aug 16 16:36:19 2013, Koji, Optics, General, Optics List 
Entry  Fri Aug 16 17:21:38 2013, Koji, General, General, [OMC002] Build started 
Entry  Thu Aug 22 15:34:03 2013, Koji, Optics, General, OMC Cavity side gluing 
Entry  Thu Aug 29 18:55:36 2013, Koji, Mechanics, General, I1 OMC top side gluing (UV) 
Entry  Fri Aug 30 12:14:50 2013, Koji, Optics, General, H1 OMC Cavity length adjustment Gouy_FSR_130827.nb.zipP8284343.jpg
Entry  Fri Aug 30 12:22:56 2013, Koji, Optics, General, H1 OMC Cavity side UV gluing 
Entry  Fri Aug 30 12:25:29 2013, Koji, General, General, H1 OMC Invar mount gluing P8304368.JPGP8304370.JPG
Entry  Tue Sep 3 17:03:25 2013, Koji, General, General, H1 OMC gluing completed 
Entry  Wed Sep 4 22:22:54 2013, Koji, General, General, H1 OMC wrapped and moved to the bake lab. 
Entry  Sat Sep 7 17:20:56 2013, Koji, General, General, OMC/PD lab optical table wrapping P9064377.JPG
   +  Reply  Fri Sep 13 15:09:20 2013, Koji, General, General, Sprinkler installation: done P9134379.jpgP9134378.jpg
Entry  Tue Oct 22 17:17:59 2013, Koji, General, General, H1OMC cabling 
Entry  Wed Oct 23 02:45:07 2013, Koji, General, General, PD realignment 
Entry  Mon Nov 4 19:43:56 2013, Koji, General, General, H1OMC Packed 
Entry  Thu Nov 21 00:05:35 2013, Koji, General, General, H1OMC electronics arrangement H1OMC_cable_arrangement.pdf
Entry  Tue Dec 10 16:41:51 2013, Koji, General, General, To Buy 
Entry  Tue Feb 18 18:58:38 2014, Koji, General, General, LHO H1 OMC installation photos 
Entry  Fri Feb 28 19:50:11 2014, Koji, General, General, Misalignment ABCD matrix for the aLIGO OMC misalignment.pdf