Entry  Mon Nov 7 21:16:16 2022, Camille, Optics, Configuration, Setting up the fiber couplers PXL_20221108_003849213.jpgPXL_20221108_003909265.jpgPXL_20221108_003929309.jpg
    Reply  Mon Nov 7 22:00:33 2022, Koji, Optics, Configuration, Setting up the fiber couplers 
    Reply  Tue Nov 29 15:54:47 2022, Koji, General, Configuration, Windows laptop for WincamD Beam'R2 recovery 
Entry  Thu Jan 26 23:16:35 2023, Koji, Optics, Configuration, OMC #4: Top side bonding. PXL_20230126_235309334.jpgPXL_20230127_053008237.jpgPXL_20230127_053020709_2.jpgPXL_20230127_053042809.MP_2.jpgPXL_20230127_053058275_2.jpg
Entry  Fri Jun 15 15:45:49 2012, Koji, General, General, OMC Plan 
Entry  Sat Jun 16 08:53:09 2012, Koji, General, General, To Do List 
Entry  Wed Jun 20 00:10:53 2012, Koji, Facility, General, Hole on the wall was patched P6191706.jpg
Entry  Sat Jul 14 02:16:07 2012, Koji, General, General, Plan Update: July P7071878.jpg
Entry  Mon Jul 23 17:15:14 2012, Koji, Clean, General, Talking with Margot 
Entry  Tue Jul 24 11:41:29 2012, Koji, General, General, Useful references 
Entry  Tue Jul 31 21:29:43 2012, Koji, General, General, Work completed in July [!] 
Entry  Tue Jul 31 21:33:17 2012, Koji, General, General, Plan Update: August [!] 
Entry  Wed Aug 1 19:35:00 2012, Koji, Facility, General, Floor cleaned / Workbench being built / Table top defect P8011949.JPGP8011947.JPGP8011948.JPG
Entry  Sat Aug 11 00:59:14 2012, Koji, Facility, General, Laser Safety Barrier P8131960.JPG
Entry  Mon Aug 13 16:59:11 2012, Koji, Clean, General, Room Cleaning Log 
Entry  Mon Aug 13 17:01:35 2012, Koji, Clean, General, Particle Counts 
Entry  Tue Aug 14 03:29:06 2012, Koji, Supply, General, Clean supply rack P8131959.JPGP8131961.JPG
Entry  Wed Aug 22 20:16:43 2012, Koji, Facility, General, Workbenches have been installed / Clean room stools P8171968.jpgP8171969.jpg
Entry  Tue Sep 25 14:18:14 2012, Koji, Clean, General, Particle Counts 
    Reply  Mon Oct 1 16:06:55 2012, Koji, Clean, General, Particle Counts 
Entry  Fri Oct 5 03:39:58 2012, Koji, Optics, General, RoC Test setup RoC_test_setup.pdfRoC_test_setup.png
Entry  Mon Oct 8 11:30:47 2012, Koji, Optics, General, EG&G 2mm photodiode angle response 
Entry  Tue Oct 9 04:59:24 2012, Koji, Optics, General, OMC Test Optical Setup OMC_test_setup.pngOMC_test_setup.pdf
Entry  Tue Oct 9 05:03:15 2012, Koji, Electronics, General, OMC Test Electronics Setup electronics_setup.pngelectronics_setup.pdf
Entry  Fri Oct 12 17:15:19 2012, Koji, Optics, General, Loan from the 40m / ATF 
Entry  Tue Oct 16 14:50:54 2012, jamie, jeff, General, General, OMC breadboard/plate measurement dimensions 
Entry  Tue Oct 16 15:50:09 2012, Koji, General, General, Work completed in August/September [!] 
Entry  Tue Oct 16 15:51:01 2012, Koji, General, General, Plan Update: October [!] 
Entry  Wed Oct 17 20:36:04 2012, Koji, Optics, General, RoC test cavity locked detailed_RoC_setup.pdfomc_cav_lock_SCRN_SHOT.pngCav_scan_response_20121016.pdf
Entry  Wed Nov 7 20:21:42 2012, Koji, General, General, Work completed in October [!] 
Entry  Wed Nov 7 20:44:11 2012, Koji, General, General, Plan Update: November [!] OMC_Project_Schedule.pdf
Entry  Thu Nov 8 19:52:57 2012, Koji, Optics, General, How to apply UV epoxy UVepoxy.jpg
Entry  Thu Nov 29 21:18:23 2012, Koji, Optics, General, OMC Mounting Prisms have come PB293030.JPGPB293032.JPG
    Reply  Wed Dec 19 18:47:03 2012, Koji, Clean, General, First Contact Training with Margot 
Entry  Wed Dec 26 14:33:33 2012, Koji, Facility, General, Lase Interlock wired PC263073.jpgPC263074.jpgPC263075.jpg
Entry  Mon Dec 31 01:45:04 2012, Koji, General, General, Work completed in Nov and Dec [!] 
Entry  Mon Dec 31 03:10:09 2012, Koji, Optics, General, SolidWorks model of the OMC breadboard D1201439_aLIGO_Breadboard_layout_assy_121224.pngD1201439_aLIGO_Breadboard_layout_assy_130105.easm
Entry  Sun Jan 6 23:22:21 2013, Koji, Mechanics, General, SolidWorks model of the OMC suspension  D0900295_AdvLIGO_SUS_Output_Mode_Cleaner_Overall_Assembly.pngD0900295_AdvLIGO_SUS_Output_Mode_Cleaner_Overall_Assembly.easm
Entry  Tue Jan 22 11:10:25 2013, Koji, Facility, General, Eyeware storage and hooks for the face shields are installed P1223116.JPG
Entry  Tue Jan 22 17:56:32 2013, Koji, Mechanics, General, Rotary stage selection 
Entry  Thu Feb 7 21:35:46 2013, Koji, General, General, Dmass's loan of LB1005 / A2&C2 sent to Fullerton / First Contact @40m P2053119.jpgP2053120.JPG
Entry  Thu Mar 7 15:53:47 2013, Koji, Mechanics, General, OMC Transportation fixture, OMC PD/QPD mounts P3073218.JPGP3073219.JPGP3073223.JPGP3073225.JPGP3073227.JPG
Entry  Thu Mar 14 17:06:21 2013, Koji, Mechanics, General, OMC SUS work @LLO 2013-03-14_16.03.40.jpg2013-03-14_16.04.07.jpg
Entry  Thu Mar 14 22:18:23 2013, Koji, General, General, New loans for the diode test 
Entry  Sat Mar 23 02:32:23 2013, Koji, Facility, General, N2 cylinder delivered P3233349.jpg
Entry  Sat Mar 23 02:41:00 2013, Koji, Optics, General, Black glass beam dumps for the first OMC P3223314.JPGP3223319.jpgP3223320.jpg
Entry  Sat Mar 23 13:34:14 2013, Koji, Optics, General, PZT assembly prototype glued P3223322.jpgP3223323.jpgP3233336.jpgP3233348.jpg
Entry  Mon Mar 25 02:04:05 2013, Koji, General, General, OMC building plan / procedure ~ WB18 
    Reply  Mon Mar 25 18:34:25 2013, Koji, General, General, OMC building plan / procedure ~ Mar 25 Mon 
Entry  Mon Mar 25 19:31:16 2013, Koji, Optics, General, OMC Top-side gluing P3253353.jpgP3253372.jpgP3253394.jpgP3253400.jpg