Sat Jan 17 11:40:04 2015, Koji, General, General, 3rd OMC completed
|
Mon Jul 21 01:02:43 2014, Koji, Mechanics, Characterization, Some structual mode analysis 6x
|
Tue Sep 9 20:59:19 2014, Koji, Mechanics, Characterization, Structural mode analysis for the PZT mirror 6x
|
Wed Aug 27 23:13:13 2014, Koji, Optics, Characterization, Collection of the power budgetting info
|
Tue Aug 5 13:03:25 2014, Koji, General, General, Missing cable components
|
Mon Aug 4 18:59:50 2014, Koji, General, General, A memorandom
|
Sun Jul 20 17:20:39 2014, Koji, General, General, The 3rd (LIO) OMC was shipped out to LHO
|
Thu Jul 17 02:19:20 2014, Koji, Mechanics, Characterization, I1OMC vibration test 6x
|
Sun Jul 20 17:19:50 2014, Koji, Mechanics, Characterization, I1OMC vibration test ~ 2nd round 9x
|
Sun Jul 13 17:46:28 2014, Koji, Optics, Characterization, OMC backscatter measurement
|
Tue Jul 15 03:00:42 2014, Koji, Optics, Characterization, OMC backscatter measurement
|
Tue Jul 15 03:34:16 2014, Koji, Optics, Characterization, OMC backscatter measurement 
|
Fri Jul 11 00:06:33 2014, Koji, Optics, Characterization, I1OMC PD
|
Thu Jul 10 23:22:28 2014, Koji, Optics, Characterization, I1OMC QPD
|
Mon Jul 7 01:36:03 2014, Koji, General, General, To Do
|
Thu Jul 10 08:34:57 2014, Koji, General, General, To Do
|
Thu Jul 10 01:39:38 2014, Koji, Electronics, General, PZT wire
|
Tue Jul 8 18:54:54 2014, Koji, Mechanics, Characterization, PZT characterization 
|
Wed Jul 2 18:58:42 2014, Koji, General, General, Beam dump delamination
|
Thu Jul 3 17:45:18 2014, Koji, General, General, Beam dump delamination
|
Tue Jul 8 04:08:06 2014, Koji, General, General, Expoxy reapplication for beam dumps
|
Sun Jul 6 03:56:40 2014, Koji, Optics, Characterization, HOM measurement with PZT vol swept  
|
Sun Jul 6 08:31:14 2014, Koji, Optics, Characterization, HOM measurement with PZT vol swept
|
Sun Jul 6 02:46:20 2014, Koji, Optics, Characterization, OMC power budget
|
Sun Jul 6 02:45:56 2014, Koji, Optics, General, FSR Measurement
|
Tue Jun 24 18:43:15 2014, Koji, General, General, ICS entries for the OMC baking/assembly
|
Fri Jun 27 12:29:50 2014, Koji, General, General, OMC baking
|
Wed Jul 2 16:41:43 2014, Koji, General, General, OMC baking
|
Fri Jun 27 18:51:33 2014, Koji, General, General, Supply
|
Thu Jun 19 23:16:50 2014, Koji, Optics, General, All of the prisms have been glued
|
Fri Jun 20 18:59:12 2014, Koji, Optics, General, All of the invar blocks have been glued
|
Mon Jun 23 21:54:16 2014, Koji, Optics, General, All of the gluing completed
|
Sat May 17 07:40:14 2014, Koji, Optics, Characterization, I1OMC cavity mirrors glued 
|
Fri May 16 00:13:36 2014, Koji, Optics, Characterization, Cavity mirror gluing part 1
|
Wed May 14 02:15:15 2014, Koji, Optics, Characterization, FSR/TSM adjustment of the OMC cavity 
|
Mon May 12 22:43:02 2014, Koji, Optics, Characterization, Measured FSR/TSM of the OMC cavity 
|
Thu Apr 17 21:39:25 2014, Koji, Optics, General, More alignment
|
Tue Mar 25 17:10:10 2014, Koji, Optics, Characterization, OMC spot position estimation
|
Mon Mar 3 02:46:21 2014, Koji, General, Characterization, Spot positions scanned
|
Fri Feb 28 19:50:11 2014, Koji, General, General, Misalignment ABCD matrix for the aLIGO OMC
|
Tue Feb 18 18:58:38 2014, Koji, General, General, LHO H1 OMC installation photos
|
Tue Dec 10 16:41:51 2013, Koji, General, General, To Buy
|
Thu Nov 21 00:05:35 2013, Koji, General, General, H1OMC electronics arrangement
|
Mon Nov 4 19:43:56 2013, Koji, General, General, H1OMC Packed
|
Wed Oct 23 02:45:07 2013, Koji, General, General, PD realignment
|
Tue Oct 22 17:17:59 2013, Koji, General, General, H1OMC cabling
|
Tue Oct 15 18:50:08 2013, Koji, Optics, Characterization, QPD alignment
|
Wed Oct 16 19:16:29 2013, Koji, Optics, Characterization, PD alignment
|
Mon Oct 14 15:50:55 2013, Koji, Optics, Characterization, H1 OMC Power budget
|
Mon Oct 14 13:40:16 2013, Koji, Optics, Characterization, H1 OMC Optical testing
|
Sat Sep 7 17:20:56 2013, Koji, General, General, OMC/PD lab optical table wrapping
|
Fri Sep 13 15:09:20 2013, Koji, General, General, Sprinkler installation: done 
|
Wed Sep 4 22:22:54 2013, Koji, General, General, H1 OMC wrapped and moved to the bake lab.
|
Tue Sep 3 17:03:25 2013, Koji, General, General, H1 OMC gluing completed
|
Fri Aug 30 12:25:29 2013, Koji, General, General, H1 OMC Invar mount gluing 
|
Fri Aug 30 12:24:28 2013, Koji, Optics, Characterization, H1OMC Spot positions   
|
Fri Aug 30 12:22:56 2013, Koji, Optics, General, H1 OMC Cavity side UV gluing
|
Fri Aug 30 12:14:50 2013, Koji, Optics, General, H1 OMC Cavity length adjustment 
|
Thu Aug 29 18:55:36 2013, Koji, Mechanics, General, I1 OMC top side gluing (UV)
|
Thu Aug 29 02:52:50 2013, Koji, Optics, Characterization, H1OMC Curved Mirror Alignment 
|
Tue Aug 27 17:02:31 2013, Koji, Mechanics, Characterization, Spot position measurement on the diode mounts
|
Thu Aug 22 15:40:15 2013, Koji, Electronics, Configuration, PZT endurance test   
|
Fri Aug 23 19:24:32 2013, Koji, Electronics, Configuration, PZT endurance test (II)
|
Thu Aug 22 15:34:03 2013, Koji, Optics, General, OMC Cavity side gluing
|
Wed Aug 21 08:31:21 2013, Koji, Optics, Characterization, H1 OMC cavity alignment
|
|