  196   Sun Jul 6 02:45:56 2014 KojiOpticsGeneralFSR Measurement3rd OMC FSR / Finesse measurement
RF AM was injected by detuning a
HWP.
 finesse_measurements_log.pdf 
  617   Thu Aug 24 12:30:58 2023 Camille Makarem, Thejas OpticsCharacterizationFSR and TMS analysisAttached are the analysis results from
the measurements in 616.
FSR: 264.657354 +/- 0.003444 MHz
 TMS.PNGHOM_scan.pdfFSR_Scan_FitFSR_TF_22-08-2023_160812.pdf 
  616   Wed Aug 23 07:48:14 2023 Camille Makarem, TejasOpticsCharacterizationFSR and TMS measuarement of A+ build[Camille, Thejas]
22 August 2023
 test_22-08-2023_165728.pdftest_22-08-2023_170543.pdfFSR_CavityLength.PNG 
  468   Fri Dec 9 13:13:13 2022 KojiOpticsCharacterizationFSR/TMS/Spot Positions/Transmission[Camille Koji]

We quickly measured the basic parameters
of the OMC as is.
 HOM_plot_PZT.pdfOMC4_spot.pngPXL_20221208_233706115.jpg 
  469   Mon Dec 12 19:04:40 2022 KojiOpticsCharacterizationFSR/TMS/Spot Positions/Transmission 2nd trial[Camille Koji]

We replaced CM2 with a PZT mirror
subassembly serialized by PZT "13"
 PXL_20221212_235351320.jpgOMC4_spot.pngHOM_plot_PZT.pdfPXL_20221213_000406843.jpgScreen_Shot_2022-12-12_at_19.36.10.png 
  184   Wed May 14 02:15:15 2014 KojiOpticsCharacterizationFSR/TSM adjustment of the OMC cavity 1. FSR was adjusted and measured with "the
golden arches" technique again.
FSR = 264.8412 MHz +/- 1400Hz =>
 Cav_scan_response_140503_Pitch.pdfCav_scan_response_140503_Yaw.pdf 
  88   Mon Apr 1 03:13:41 2013 KojiOpticsGeneralFailure of PZT-glass joints[Koji, Jeff, Zach, Lisa]
We glued a test PZT-mirror assembly
last week in order to make sure the heat
  
  105   Mon Apr 8 23:42:33 2013 KojiOpticsConfigurationFake OMC roughly alignedMode matching:
 
 beam_profile.pdfmode_matching.pdf 
  372   Fri Aug 23 11:11:44 2019 shrutiOpticsCharacterizationFinding the curvature bottomI attempted to fit the data taken
by Koji of the beam spot precession at the
CCD in order to find the location of the
 CircleFit.pdfSineFit.pdf 
  45   Wed Dec 19 18:47:03 2012 KojiCleanGeneralFirst Contact Training with MargotSteve and I visited Margot to have a training
session for application of First Contact
on optics.
  
  51   Wed Jan 2 07:45:39 2013 KojiOpticsCharacterizationFirst Contact testConclusion:
Good. First contact did not damage the coating
surface, and reduced the loss
 Cav_scan_response_zoom_20121125_C2_before.pdfCav_scan_response_zoom_20121125_C2_after.pdf 
  517   Mon Apr 3 11:06:47 2023 Thejas OpticsCharacterizationFlat mirror flatnessData can be found in DCC document T2300050. 

 

On Friday. Camille and I measured
  
  14   Wed Aug 1 19:35:00 2012 KojiFacilityGeneralFloor cleaned / Workbench being built / Table top defect-
The floor of the room was cleaned and waxed!
-
 P8011949.JPGP8011947.JPGP8011948.JPG 
  112   Tue Apr 16 08:12:14 2013 KojiOpticsCharacterizationFurther More Mirror T measurementT&Rs of the B mirrors and some of the
E mirrors are measured.
I found that 
  
  114   Tue Apr 16 23:26:51 2013 KojiOpticsCharacterizationFurther More Mirror T measurementSince the previous measurement showed too
high loss, the optical setup was checked.
It seemed that a PBS right before
  
  49   Mon Dec 31 03:11:45 2012 KojiOpticsCharacterizationFurther more RoC measurementTotal (excluding C2, C7, C8): 2.575 +/-
0.005 [m]
New results
 Cav_scan_response_zoom_20121125_C6_9.pdf 
  39   Fri Nov 9 00:43:32 2012 KojiOpticsCharacterizationFurther more wedge measurementNow it's enough for the first OMC (or even
second one too).
Today's measurements all distributed
 wedge_measurement_overall.pdf121108a_A1.pdf 
  249   Tue Dec 29 12:15:46 2015 KojiGeneralGeneralGlasgow polarizer passed to KateThe Glasgow polarizer was passed to Kate
on Dec 17, 2015.
  
  391   Mon Aug 10 15:34:04 2020 KojiFacilityLoan / LendingGlue bake ovenBlack and Decker Glue Baking Oven came
back to the OMC lab on Aug 10, 2020, Georgia
had lent the unit for the SAMS assembly/testing.
  
  161   Fri Aug 30 12:14:50 2013 KojiOpticsGeneralH1 OMC Cavity length adjustmentShort
conclusion: 
The roundtrip cavity length for
 Gouy_FSR_130827.nb.zipP8284343.jpg 
  162   Fri Aug 30 12:22:56 2013 KojiOpticsGeneralH1 OMC Cavity side UV gluingH1 OMC Cavity side optics was glued
on the breadboard
  
  263   Fri Aug 12 14:58:17 2016 KojiGeneralConfigurationH1 OMC DCPD replacement Preparation of 3rd OMC for the
use in H1

New DCPD(T) = B1-01
  
  164   Fri Aug 30 12:25:29 2013 KojiGeneralGeneralH1 OMC Invar mount gluingThe Invar Mounting Blocks were glued on
the breadboard.
Serial number #1/2/5/6/7/8 ->
 P8304368.JPGP8304370.JPG 
  169   Mon Oct 14 13:40:16 2013 KojiOpticsCharacterizationH1 OMC Optical testingSince the middle of September, the optical
tests of H1 OMC were took place.
Here is summary of the progress.
  
  170   Mon Oct 14 15:50:55 2013 KojiOpticsCharacterizationH1 OMC Power budgetLHO OMC power budget

    
 OMC_power_budget.pdf 
  154   Wed Aug 21 08:31:21 2013 KojiOpticsCharacterizationH1 OMC cavity alignmentAlignment of the H1 OMC cavity mirrors
- The cavity mirrors as well as the
first steering mirror were aligned on the
  
  165   Tue Sep 3 17:03:25 2013 KojiGeneralGeneralH1 OMC gluing completed[Koji Jeff]
H1 OMC
  
  166   Wed Sep 4 22:22:54 2013 KojiGeneralGeneralH1 OMC wrapped and moved to the bake lab.[Koji, Jeff]
We moved the H1OMC to the bake lab.
Chub set up the vacuum bake oven
  
  159   Thu Aug 29 02:52:50 2013 KojiOpticsCharacterizationH1OMC Curved Mirror AlignmentCavity
parameter was measured with 50V bias on PZT1
(CM1)
 Cav_scan_response_130828_Pitch.pdfCav_scan_response_130828_Yaw.pdf 
  175   Mon Nov 4 19:43:56 2013 KojiGeneralGeneralH1OMC PackedH1OMC PZT connector was replaced with the
correct one. This was the final step for
H1OMC.
  
  163   Fri Aug 30 12:24:28 2013 KojiOpticsCharacterizationH1OMC Spot positionsBeam heights on the diodes

DCPD1: 14.459mm -> With 1.5mm
 DCPD1.pngDCPD2.pngQPD1.pngQPD2.png 
  173   Tue Oct 22 17:17:59 2013 KojiGeneralGeneralH1OMC cabling[Chub, Jeff, Koji]
We worked on the wiring and routing
of the cables.
  
  176   Thu Nov 21 00:05:35 2013 KojiGeneralGeneralH1OMC electronics arrangementChecked the PZT arrangement: Mighty Mouse
Pin1&2 -> PZT2 (DCPD side), Mighty
Mouse Pin3&4 -> PZT1 (QPD side)
 H1OMC_cable_arrangement.pdf 
  368   Mon Jun 24 12:54:58 2019 KojiCleanGeneralHEPA BOOTHhttps://www.airscience.com/purair-flow-laminar-flow-cabinets   
  519   Wed Apr 5 22:09:30 2023 KojiFacilityGeneralHEPA Enclosure extensionChub finished the HEPA enclosure extension
project.
 20230405_120322.jpg20230405_120308.jpg20230405_120033.jpg 
  500   Mon Mar 6 12:25:08 2023 KojiFacilityGeneralHEPA Enclosure improvementChub, JC, and co worked on the HEPA enclosure
improvement.
 20230306_081449.jpg20230306_081518.jpg 
  198   Sun Jul 6 03:56:40 2014 KojiOpticsCharacterizationHOM measurement with PZT vol sweptCavity FSR/TMS measurement (2014/7/5) with
PZT voltages swept from 0V to 200V (50V step)
 Cav_scan_response_PZT1.pdfCav_scan_response_PZT2.pdfOMC_HOM_140705.pdf 
  199   Sun Jul 6 08:31:14 2014 KojiOpticsCharacterizationHOM measurement with PZT vol swept3rd OMC, HOM diagram at PZT1=0V and PZT2=50V.
First coincidence with the carrier
is the 32nd-order carrier mode. Very good.
 HOM_plot.pdf 
  255   Sat Mar 26 01:49:48 2016 KojiOpticsCharacterizationHQEPD QECalibration
of the transimpedance

Use KEITHLEY 2450 as a calibrated
 QE1.pngQE2.png 
  254   Sun Mar 13 22:02:09 2016 KojiOpticsCharacterizationHQEPD QE measurement (direct comaprison)Direct comparison of the PD responsibities

We
can expect 5% increase of the QE with the
  
  256   Sat Mar 26 17:39:50 2016 KojiElectronicsCharacterizationHQEPD dark noiseDark noise measurement for 6 HQEPDs and
1 C30665. All of these showed sufficiently
low dark current noise levels compared with
 PD_dark_current.pdf 
  262   Fri Jul 22 22:24:05 2016 KojiGeneralGeneralHQEPD inventoryAs of Jul 22, 2016
As of Aug 11, 2016
As of Aug 16, 2016
  
  427   Tue Jul 26 00:12:58 2022 KojiGeneralGeneralHigh QE PD: QE measurements- Installed the High QE PDs to OMC #002


B1-22@Cage B1 was
installed to the transmission DCPD
B1-23@Cage
 IMG_1118.JPG 
  429   Wed Jul 27 10:34:09 2022 KojiGeneralGeneralHigh QE PD: QE measurements 2- DLPCA-200 trans-impedance amplifier was
calibrated.
  Keithley source meter 2450
 IMG_1119.JPGIMG_1120.JPG 
  3   Wed Jun 20 00:10:53 2012 KojiFacilityGeneralHole on the wall was patched   P6191706.jpg 
  38   Thu Nov 8 20:12:10 2012 KojiOpticsConfigurationHow many glass components we need for a plateOptical prisms 50pcs (A14+B12+C6+E18)
Curved Mirrors 25pcs (C13+D12)
  
  37   Thu Nov 8 19:52:57 2012 KojiOpticsGeneralHow to apply UV epoxyKA's question:
Do
 UVepoxy.jpg 
  160   Thu Aug 29 18:55:36 2013 KojiMechanicsGeneralI1 OMC top side gluing (UV)The glass components for the I1 OMC top
side were glued by the UV glue.
Breadboard SN#4
  
  206   Fri Jul 11 00:06:33 2014 KojiOpticsCharacterizationI1OMC PDDCPD#            
DCPD1      DCPD2
Housing#         
  
  205   Thu Jul 10 23:22:28 2014 KojiOpticsCharacterizationI1OMC QPDQPD#             
QPD1      
QPD2
  