40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  OMC elog, Page 4 of 13  Not logged in ELOG logo
ID Date Author Typeup Category Subject Text Attachments
  212   Sun Jul 20 17:20:39 2014 KojiGeneralGeneralThe 3rd (LIO) OMC was shipped out to LHO The 3rd (LIO) OMC was shipped out to LHO
on Friday (Jul 18) Morning.
At LHO
  
  214   Thu Jul 31 15:07:53 2014 KojiGeneralGeneralItem lendingTara: Laser Safety goggle ->
Returned

Evan:
  
  215   Mon Aug 4 18:59:50 2014 KojiGeneralGeneralA memorandomOn breadboarfd cabling for 3IFO OMC
D1300371 - S1301806
D1300372 - S1301808
  
  216   Tue Aug 5 13:03:25 2014 KojiGeneralGeneralMissing cable componentsDCPD Connector Face: Qty2 https://dcc.ligo.org/LIGO-D1201276
QPD Connector Face: Qty2 https://dcc.ligo.org/LIGO-D1201282
PD faster: 92210A07 Qty 4: MCMASTER
  
  219   Sat Jan 17 11:40:04 2015 KojiGeneralGeneral3rd OMC completedJan 15, 2015 3rd OMC completed

The face caps of the DCPD/QPD cables
were installed (Helicoils inserted)
  
  220   Fri Jan 30 19:31:08 2015 KojiGeneralGeneralItem lendingGabriele:

PZT HV Amp

Evan:
  
  221   Tue Feb 3 18:23:49 2015 KojiGeneralGeneralItem lending- The laser was removed and shipped to
LHO today.

- UV illuminator / fused silica
  
  222   Wed Feb 4 20:07:24 2015 KojiGeneralGeneralItem lendingShipment to MIT (L. Barsotti, J. Miller)

1. UV Illuminator (LESCO Super
Spot MK III)
 C30140_1.JPGC30140_2.JPGC30141.JPGC30142.JPGC30143.JPG 
  223   Wed Feb 18 21:51:23 2015 KojiGeneralGeneralNotes on OMC Transportation Fixtures & PelicanLLO has one empty OMC transportation fixture.

LHO has one empty OMC transportation
fixture.
  
  226   Tue Jul 21 20:20:12 2015 KojiGeneralGeneralItem lendingKate (ATF)

- 4ch color oscilloscope (Tektronix)

- Chopper controller
  
  248   Fri Dec 18 15:33:24 2015 KojiGeneralLoan / LendingLoan from RichLoan Record: I borrowed a PD can opener
from Rich => Antonio Returned Sep
9, 2016
  
  249   Tue Dec 29 12:15:46 2015 KojiGeneralGeneralGlasgow polarizer passed to KateThe Glasgow polarizer was passed to Kate
on Dec 17, 2015.
  
  250   Thu Feb 18 21:08:32 2016 KojiGeneralLoan / Lending(all returned) Antonio loanAntonio borrowed: Rich's PD cutter
(returned), Ohir power meter(returned),
Thorlabs power meter head, Chopper
  
  258   Tue Apr 5 18:14:55 2016 KojiGeneralLoan / LendingQPD Lending CrackleXiaoyue

QPD head
X-Z stage
  
  261   Fri Jun 10 17:12:57 2016 KojiGeneralConfigurationL1 OMC DCPD replacementNew DCPD(T) = A1-23
DCPD(T) = DCPDB: extracted and accomodated
in CAGE-G SLOT1
  
  262   Fri Jul 22 22:24:05 2016 KojiGeneralGeneralHQEPD inventoryAs of Jul 22, 2016
As of Aug 11, 2016
As of Aug 16, 2016
  
  263   Fri Aug 12 14:58:17 2016 KojiGeneralConfigurationH1 OMC DCPD replacement Preparation of 3rd OMC for the
use in H1

New DCPD(T) = B1-01
  
  264   Mon Aug 15 10:09:10 2016 KojiGeneralGeneralPrev H1 OMC shipped to CITPrevious H1 OMC shipped from LHO to CIT

https://ics-redux.ligo-la.caltech.edu/JIRA/browse/Shipment-8196
  
  265   Mon Aug 22 12:58:16 2016 KojiGeneralGeneralUV bond samples -> Garilynn- FS base + Mounting Prism

- FS or SF2 1/2" piece + FS
or SF2 1/2" piece
  
  268   Fri Sep 9 14:34:31 2016 KojiGeneralGeneralItem lendingTo 40m

First Contact Kit by Calum

Class A Kapton sheets
  
  272   Wed Dec 7 21:18:35 2016 KojiGeneralGeneralOMC placed on the table / the beam roughly alignedThe OMC mode matching sled was fixed on
the nominal part of the table. Then the OMC
was located at the nominal position marked
 DSC_0082.jpgDSC_0084.jpg 
  273   Thu Dec 8 21:17:09 2016 KojiGeneralGeneralOMC placed on the table / the beam roughly alignedThe OMC cavity was locked. The alignment
was precisely adjusted. The mode matching
was optimized by the lens positions. The
  
  278   Fri May 26 21:53:20 2017 KojiGeneralConfigurationTrans RF PD setupRecent work

- DC output of the trans RF PD
was connected to the BNC patch panel. =>
  
  279   Tue Jun 6 00:49:48 2017 KojiGeneralConfigurationTrans RF PD setupLast week, I further worked on the RF system
to install 20dB coupler on the agilent unit
and setup the R channel. This allowed me
  
  280   Tue Jun 6 22:00:36 2017 KojiGeneralConfigurationTrans RF PD setup- Replaced the PZT with the one used from
the beginning. This must be PZT #21. After
the replacement, the spot positions look
  
  284   Sat Jul 1 21:33:18 2017 KojiGeneralGeneralSome purchase notes- Forgot to close the cylinder valve...

v HEPA prefilter (20"x20"x1"
MERV 7)
  
  285   Wed Jul 5 16:59:44 2017 KojiGeneralGeneralThe OMC #002 was packed[Stephen Koji]

The OMC #002 was packed for the
transportation to Downs.
 DSC_0360.JPG 
  289   Mon Nov 27 20:24:24 2017 KojiGeneralGeneralA former LHO PD (Trans) removed from the OMC #002 for the shipment to StockholmAttachment 1: The PD was
removed from the transmission side of the
OMC #002 (former LHO OMC - the one blasted
 6x 
  290   Thu Nov 30 12:18:41 2017 StephenGeneralGeneralPreparation for Modal Testing on 4 DecemberNorna Robertson, Stephen Appert || 
29 Nov 2017, 2 pm to 4 pm  || 
227 Downs, CIT
  
  293   Thu May 3 21:45:58 2018 awadeGeneralLoan / LendingBorrowed toaster ovenI’ve borrowed the black and decker
toaster oven to dry some sonicated parts.
It is temporarly located in the QIL lab. 
 9CE80545-7A58-4236-B7E3-1EE6C4042DAA.jpeg 
  305   Wed Aug 8 17:32:56 2018 Rich AbbottGeneralCharacterizationModulation Index Test Setup at 40m LabAttached is a block diagram of the test
setup used in the 40m lab to measure the
modulation index of the IO modulator
 40mLabModIndexSetup.pdf 
  306   Thu Aug 9 11:24:29 2018 KojiGeneralCharacterizationModulation Index Test Setup at 40m Lab[Rich Koji]

The impedances of the new LLO EOM
were measured with the beat note setup at
 modulation_depth.pdfmodulation_depth_zoom.pdf 
  307   Wed Aug 29 11:06:30 2018 KojiGeneralGeneralRF AM RIN and dBc conversion0. If you have an RF signal whose waveform
is , the amplitude is constant and 1.
  
  319   Tue Mar 19 17:30:25 2019 KojiGeneralCharacterizationOMC (002) Test itemsOMC #002 Optical tests


FSR
measurement (done, 2019/1/8-9, 2019/4/1)
  
  325   Fri Apr 5 23:30:20 2019 KojiGeneralGeneralOMC (002) repair completedOMC(002)
repair completed

When the cable harness of OMC(004)
 P_20190405_222401.jpgP_20190405_222509.jpgP_20190405_222529.jpg 
  326   Wed Apr 10 19:22:24 2019 KojiGeneralGeneralOMC(004): preparation for the PZT subassembly bonding Preparation for the PZT subassembly
bonding (Section 6.2 and 7.3 of T1500060
(aLIGO OMC optical testing procedure)
  
  327   Thu Apr 11 10:54:38 2019 StephenGeneralGeneralOMC(004): preparation for the PZT subassembly bonding


Quote:


  
  330   Thu Apr 11 21:22:58 2019 KojiGeneralGeneralOMC(004): PZT sub-assembly air baking[Stephen Koji]

The baking of the PZT subassemblies
was more complicated than we initially thought.
 temp_profile.pdfbake.xlsx 
  331   Sun Apr 14 23:58:49 2019 KojiGeneralGeneralOMC(004): PZT sub-assembly post air-bake inspection[Koji Stephen]

(Friday afternoon) We retrieved
the PZT sub-assemblies to the clean room.
  
  332   Mon Apr 15 00:08:32 2019 KojiGeneralGeneralOMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #7)Sub-ASSY
#7

Probably the best glued unit among
 6x 
  333   Mon Apr 15 00:39:04 2019 KojiGeneralGeneralOMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #8)Sub-ASSY
#8

Probably the best glued unit among
 8x 
  334   Mon Apr 15 01:07:30 2019 KojiGeneralGeneralOMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #9)Sub-ASSY
#9

The most fractured unit among four.
 7x 
  335   Mon Apr 15 01:23:45 2019 KojiGeneralGeneralOMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #10) Sub-ASSY
#10

Attachment #1: Mounting
 IMG_7589.jpgIMG_7590.jpgIMG_7591.jpgIMG_7592.jpg 
  339   Tue Apr 16 16:40:26 2019 KojiGeneralConfigurationOMC(004): A Mirror selectionWe are going to use A5 and A14
for FM1 and FM2. (The role of these
two can be swapped)
 A_Mirror_selection.pdf 
  343   Tue Apr 16 23:11:43 2019 KojiGeneralGeneralBorrowed items from the other labsApr 16, 2019
Borrowed
two laser goggles from the 40m. (Returned
  
  344   Wed Apr 17 09:08:47 2019 StephenGeneralGeneralOMC(004): Unwrapping and preparing breadboard[Stephen, Philip, Koji, Joe]

Breadboard D1200105 SN06 was selected
as described in eLOG
 IMG_7635_packaging_of_sn06.JPGIMG_7637_engraving_of_sn06.JPGIMG_7641_particulate_before_top_gun_large_face.JPGIMG_7644_particulate_before_top_gun_small_face.JPGIMG_7646_particulate_after_top_gun.JPG 
  348   Fri Apr 19 09:35:28 2019 JoeGeneral Adjusting cavity axis, re-alignment of OMC and locking[koji,philip,
joe, liyuan,
steven]
 FSR_Scan_Fitfsrdata.pdfIMG_7679_cropped.jpg 
  351   Mon Apr 22 09:54:21 2019 JoeGeneral Shortening cavity (A5,A14,PZT11,PZT22) to get closer to design FSR[Koji,Joe,Philip,stephen]

in units 20um per div on the micrometer
[n.b. we reailised that its 10um per div
 CM1_IMG_7699.jpgCM2_IMG_7697.jpg 
  352   Mon Apr 22 19:54:28 2019 KojiGeneral OMC(004): Spot positions at the end of Apr 22nd   misalignment4.pdf 
  362   Thu May 16 12:41:28 2019 ChubGeneralGeneralfire pillow found on optics tableThat is an expanding fire pillow, also
known as firebrick.  It is used to create
a fire block where holes in fire-rated walls
  
ELOG V3.1.3-