40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  OMC elog, Page 3 of 8  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
Entry  Tue May 28 12:14:20 2019, Stephen, Optics, General, CM PZT Assembly Debonding of EP30-2 in Acetone 8x
Entry  Thu May 23 23:27:38 2019, Koji, Optics, Characterization, IGHQEX3000 high power test HQEPD_high_power_test.pdfpd_images.png
Entry  Thu May 23 01:42:46 2019, Koji, Optics, Characterization, C30665 high power test C30665_high_power_test.pdfpd_surface.jpg
Entry  Mon May 20 19:53:17 2019, Koji, Optics, Configuration, DCPD high power test BIAS.pdfP_20190520_204822.jpg
    Reply  Wed May 22 07:31:37 2019, Koji, Optics, Configuration, Camera test (DCPD high power test) 20190521201838_IMG_7939_2.jpg
Entry  Thu May 16 12:41:28 2019, Chub, General, General, fire pillow found on optics table 
Entry  Wed May 15 19:07:53 2019, Koji, Clean, General, What is this??? P_20190515_185602.jpgP_20190515_185844.jpg
Entry  Thu May 9 18:10:24 2019, Koji, Optics, Characterization, OMC(004): Spot position scan / power budget 190508.pngscattering_spots_CM1.png
Entry  Thu May 9 17:35:07 2019, Koji, Optics, General, Alignment strategy T1500060_OMC_Optical_Testing_Procedure.pdf
Entry  Thu May 9 16:07:18 2019, Stephen, Mechanics, General, Improvements to OMC Bonding Fixture image_of_issue_with_OMC_PZT_bonding_fixture_from_D16003336-v3.pngimage_02_of_issue_with_OMC_PZT_bonding_fixture_from_D16003336-v3.PNG
Entry  Wed May 1 15:40:46 2019, Koji, Optics, Characterization, OMC(004): Spot positions and the scattering misalignment.pdf
    Reply  Fri May 3 11:06:28 2019, Koji, Optics, Characterization, OMC(004): Spot positions and the scattering misalignment.pdf
Entry  Thu Apr 25 15:05:19 2019, Joe, Optics, Characterization, Looking at PZT HOM spacing dependance and thinking about workflow 
Entry  Wed Apr 24 13:58:51 2019, Joe, Optics, Characterization, OMC power budget and UV Epoxy Bonding of BS1 
Entry  Tue Apr 23 10:21:12 2019, Joe, Optics, Configuration, Moving the spots to the centre of the curved mirrors FSR_detuned_locking.pdfCM1_IMG_7702.JPGCM2_IMG_7704.JPG
Entry  Mon Apr 22 09:54:21 2019, Joe, General, , Shortening cavity (A5,A14,PZT11,PZT22) to get closer to design FSR CM1_IMG_7699.jpgCM2_IMG_7697.jpg
    Reply  Mon Apr 22 19:54:28 2019, Koji, General, , OMC(004): Spot positions at the end of Apr 22nd misalignment4.pdf
Entry  Sat Apr 20 00:50:12 2019, Koji, Optics, Characterization, OMC(004): Spot positions misalignment2.pdfmisalignment3.pdf
Entry  Thu Apr 18 20:47:54 2019, Joe, Optics, , OMC initial alignment and locking IMG_7676.JPGIMG_7666.JPGIMG_7670.JPGIMG_7883.JPGIMG_7882.JPG
    Reply  Fri Apr 19 11:34:19 2019, Koji, Optics, , OMC initial alignment and locking misalignment1.pdf
Entry  Fri Apr 19 09:35:28 2019, Joe, General, , Adjusting cavity axis, re-alignment of OMC and locking FSR_Scan_Fitfsrdata.pdfIMG_7679_cropped.jpg
Entry  Fri Apr 19 09:21:07 2019, Philip, Optics, , Cleaning of OMC optics IMG_7877.JPGIMG_7883.JPGIMG_7884.JPG
Entry  Wed Apr 17 10:30:37 2019, Philip, Optics, General, OMC optical set-up day 1 
Entry  Wed Apr 17 09:08:47 2019, Stephen, General, General, OMC(004): Unwrapping and preparing breadboard IMG_7635_packaging_of_sn06.JPGIMG_7637_engraving_of_sn06.JPGIMG_7641_particulate_before_top_gun_large_face.JPGIMG_7644_particulate_before_top_gun_small_face.JPGIMG_7646_particulate_after_top_gun.JPG
Entry  Tue Apr 16 23:11:43 2019, Koji, General, General, Borrowed items from the other labs 
Entry  Mon Apr 15 21:11:49 2019, Philip, Optics, Characterization, OMC(004): PZT testing for spare OMC 
    Reply  Tue Apr 16 11:36:36 2019, Koji, Optics, Characterization, OMC(004): PZT testing for spare OMC 9x
    Reply  Tue Apr 16 21:16:11 2019, Koji, Optics, Characterization, OMC(004): PZT testing for spare OMC 
Entry  Tue Apr 16 17:24:56 2019, Koji, Optics, Configuration, OMC(004): E Mirror selection E_Mirror_selection.pdf
Entry  Tue Apr 16 16:52:36 2019, Koji, Optics, Configuration, OMC(004): B Mirror selection B_Mirror_selection.pdf
Entry  Tue Apr 16 16:40:26 2019, Koji, General, Configuration, OMC(004): A Mirror selection A_Mirror_selection.pdf
Entry  Tue Apr 16 16:35:09 2019, Koji, Optics, Configuration, OMC(004): Glass breadboard selection BB_selection.pdf
Entry  Sun Apr 14 23:58:49 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection 
    Reply  Mon Apr 15 00:08:32 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #7) 6x
    Reply  Mon Apr 15 00:39:04 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #8) 8x
    Reply  Mon Apr 15 01:07:30 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #9) 7x
    Reply  Mon Apr 15 01:23:45 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #10)  IMG_7589.jpgIMG_7590.jpgIMG_7591.jpgIMG_7592.jpg
Entry  Thu Apr 11 21:22:58 2019, Koji, General, General, OMC(004): PZT sub-assembly air baking temp_profile.pdfbake.xlsx
Entry  Thu Apr 11 21:22:26 2019, Koji, Mechanics, General, OMC(004): PZT sub-assembly gluing IMG_7561.jpgIMG_7567.jpg
Entry  Thu Apr 11 12:15:31 2019, Koji, Mechanics, Configuration, PZT sub assy mirror orientations PZT_subassy.pngPZT_subassy.pdf
Entry  Wed Apr 10 19:22:24 2019, Koji, General, General, OMC(004): preparation for the PZT subassembly bonding  
    Reply  Thu Apr 11 10:54:38 2019, Stephen, General, General, OMC(004): preparation for the PZT subassembly bonding  
Entry  Fri Apr 5 23:30:20 2019, Koji, General, General, OMC (002) repair completed P_20190405_222401.jpgP_20190405_222509.jpgP_20190405_222529.jpg
Entry  Fri Apr 5 20:50:54 2019, Koji, Optics, Characterization, OMC(002): QPD alignment P_20190405_215906.jpgP_20190405_215927.jpg
Entry  Fri Apr 5 01:08:17 2019, Koji, Optics, Characterization, OMC(002): DCPD / QPD alignment IMG_7521.JPGIMG_7529.JPGIMG_7539.JPGIMG_7541.JPG
Entry  Fri Apr 5 01:07:18 2019, Koji, Optics, Characterization, OMC(002): transmitted beam images CM1trasns.pngCM2trasns.pngFM2trans2.png
Entry  Thu Apr 4 20:07:39 2019, Koji, Supply, General, Purchase 
Entry  Thu Mar 28 16:36:52 2019, Koji, Mechanics, Characterization, OMC(002) PZT characterization  PZT_Scan.pdfOMC_PZT_Response.pdf
Entry  Tue Mar 19 17:30:25 2019, Koji, General, Characterization, OMC (002) Test items 
Entry  Sat Feb 2 20:35:02 2019, Koji, Optics, Characterization, Summary: OMC(002) HOM structure recalculation (after mirror replacement)  OMC_HOM_190110.pdfHOM_PZTV.pdfHOM_plot_PZT0_0.pdfCav_scan_response_PZT.pdf
Entry  Sat Feb 2 20:28:21 2019, Koji, Optics, Characterization, Summary: OMC(003) HOM structure recalculation OMC_HOM_140705.pdfHOM_PZTV_PZT1_0V.pdfHOM_plot_PZT0_0.pdfCav_scan_response_PZT_HOM.pdf
Entry  Sat Feb 2 20:03:19 2019, Koji, Optics, Characterization, Summary: OMC(002) HOM structure recalculation (before mirror replacement) OMC_HOM_131011.pdfHOM_PZTV.pdfHOM_plot_PZT0_0.pdfCav_scan_response_PZT_HOM.pdf
Entry  Sat Feb 2 16:17:13 2019, Koji, Optics, Characterization, Summary: OMC(001) HOM structure recalculation OMC_HOM_130531.pdfHOM_PZTV.pdfHOM_plot_PZT0_0.pdfCav_scan_response_HOM.pdf
Entry  Fri Feb 1 12:52:12 2019, Koji, Mechanics, General, PZT deformation simulation pzt.png
Entry  Sat Jan 12 22:49:11 2019, Koji, Optics, Characterization, PM-SM patch cable mode cleaning effect fiber_mode_cleaning.pdf
Entry  Thu Jan 10 20:45:00 2019, Koji, Optics, Characterization, PZT test cable OMC_PZT_wiring.pdf
Entry  Thu Jan 10 20:42:54 2019, Koji, Optics, Characterization, FSR / HOM Test of OMC SN002 
Entry  Sun Sep 23 19:42:21 2018, Koji, Optics, General, Montecarlo simulation of the phase difference between P and S pols for a modeled HR mirror reflectivities.pngtransmission.pngphase_diff.pngphase_difference_histogram.png
    Reply  Thu Sep 27 20:19:15 2018, Aaron, Optics, General, Montecarlo simulation of the phase difference between P and S pols for a modeled HR mirror 
       Reply  Thu Nov 1 19:57:32 2018, Aaron, Optics, General, Montecarlo simulation of the phase difference between P and S pols for a modeled HR mirror 
Entry  Wed Aug 29 11:06:30 2018, Koji, General, General, RF AM RIN and dBc conversion 
Entry  Wed Aug 8 17:32:56 2018, Rich Abbott, General, Characterization, Modulation Index Test Setup at 40m Lab 40mLabModIndexSetup.pdf
    Reply  Thu Aug 9 11:24:29 2018, Koji, General, Characterization, Modulation Index Test Setup at 40m Lab modulation_depth.pdfmodulation_depth_zoom.pdf
Entry  Tue Aug 7 15:43:12 2018, Koji, Electronics, Characterization, New LLO EOM stuffed P_20180806_154457.jpgimpedance_eom.pdfimpedance_eom_zoom.pdf
ELOG V3.1.3-