40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  OMC elog, Page 3 of 9  Not logged in ELOG logo
Entry  Wed Feb 1 01:44:14 2023, Koji, General, General, OMC (004) plan 
Entry  Wed Feb 1 01:39:41 2023, Koji, Mechanics, General, DCPD housing / QPD housing PXL_20230201_021505299.jpgPXL_20230201_021455728.jpg
Entry  Mon Nov 9 22:06:18 2020, Koji, Mechanics, General, 5th OMC Transport Fixture IMG_0211.jpgIMG_0221.jpg
    Reply  Wed Feb 1 01:33:03 2023, Koji, Mechanics, General, 5th OMC Transport Fixture PXL_20230201_005912224.jpg
Entry  Sat Jan 28 00:46:21 2023, Koji, Mechanics, General, OMC #4: Replaced the locks of the transport fixture  PXL_20230128_022952669.jpg
Entry  Sat Jan 28 00:38:56 2023, Koji, Mechanics, General, OMC #1 cable bracket replacement / OMC #1 repair completed PXL_20230128_011405446.jpgPXL_20230128_011401778.jpgPXL_20230128_013509885.jpgPXL_20230128_014001006.jpgPXL_20230128_014035044.jpg
Entry  Tue Nov 15 07:46:58 2022, Camille Makarem, Optics, General, cleaning OMC #1 
    Reply  Tue Nov 15 10:58:53 2022, Koji, Optics, General, OMC #1 damaged black glass removal PXL_20221114_222641455.jpgPXL_20221114_222544330.jpgPXL_20221114_222555849.jpgPXL_20221114_233748631.jpg
       Reply  Tue Nov 15 11:12:24 2022, Koji, Optics, General, OMC #1 fogging on the AR side of BS1 cleaned PXL_20221114_225338114.jpgPXL_20221114_232824245.jpgPXL_20221114_233714774.jpgPXL_20221114_233748631.jpg
          Reply  Thu Jan 26 23:46:13 2023, Koji, Optics, General, OMC #1 input beam dump bonding PXL_20230127_052955482.jpgPXL_20230127_052949869.jpg
Entry  Thu Jan 26 23:16:35 2023, Koji, Optics, Configuration, OMC #4: Top side bonding. PXL_20230126_235309334.jpgPXL_20230127_053008237.jpgPXL_20230127_053020709_2.jpgPXL_20230127_053042809.MP_2.jpgPXL_20230127_053058275_2.jpg
Entry  Thu Jan 26 23:07:14 2023, Koji, Optics, General, OMC #4: Input beam dump bonding PXL_20230126_221556977.jpg
Entry  Wed Jan 25 23:51:04 2023, Koji, General, General, The items packed for Downs PXL_20230127_055920944.jpg
Entry  Mon Dec 19 18:51:50 2022, Koji, Optics, Characterization, TMS measurement with the PZT voltages altered Cav_scan_response_PZT1_0_Pitch.pdfCav_scan_response_PZT1_0_Yaw.pdfOMC_20221215.pdfHOM_plot_PZT0_0.pdfHOM_PZTV_PZT1_0V.pdf
Entry  Fri Dec 9 13:13:13 2022, Koji, Optics, Characterization, FSR/TMS/Spot Positions/Transmission HOM_plot_PZT.pdfOMC4_spot.pngPXL_20221208_233706115.jpg
    Reply  Mon Dec 12 19:04:40 2022, Koji, Optics, Characterization, FSR/TMS/Spot Positions/Transmission 2nd trial PXL_20221212_235351320.jpgOMC4_spot.pngHOM_plot_PZT.pdfPXL_20221213_000406843.jpgScreen_Shot_2022-12-12_at_19.36.10.png
Entry  Mon Dec 5 20:09:39 2022, Koji, Optics, General, (re)starting the OMC #4 build PXL_20221205_233712211.jpg
Entry  Fri Dec 2 11:42:03 2022, Koji, Optics, Characterization, OMC #1 cleaning for water soluble contaminants PXL_20221130_234101575.jpgPXL_20221130_234013958.jpgPXL_20221201_021727724.jpgScreen_Shot_2022-12-02_at_12.43.02.png
    Reply  Fri Dec 2 12:38:15 2022, Koji, Optics, Characterization, OMC #1 cleaning for water soluble contaminants PXL_20221202_034932211.jpgOMC_loss.pdf
       Reply  Fri Dec 2 23:58:33 2022, Koji, Optics, Characterization, OMC #1 cleaning for water soluble contaminants PXL_20221203_063327268.jpgOMC_loss.pdf
Entry  Thu Jul 21 13:21:27 2022, Koji, General, Configuration, Windows laptop for WincamD Beam'R2 recovery IMG_1102.JPG
    Reply  Tue Nov 29 15:54:47 2022, Koji, General, Configuration, Windows laptop for WincamD Beam'R2 recovery 
Entry  Fri Nov 18 18:41:05 2022, Camille Makarem, General, General, 2nd deep cleaning of OMC #1 PXL_20221118_213955948.jpg
    Reply  Mon Nov 21 19:13:35 2022, Koji, General, General, Transmission measurement (2nd deep cleaning of OMC #1) PXL_20221122_030736513.jpgOMC_loss.pdf
Entry  Thu Nov 17 19:50:00 2022, Koji, Optics, Characterization, Conclusion on the cleaning of OMC #001 OMC_loss.pdf
Entry  Thu Nov 17 18:56:22 2022, Koji, Optics, General, Transmission measurements of OMC #1 after deep cleaning PXL_20221117_232145418.jpgScreen_Shot_2022-11-17_at_19.02.31.png
Entry  Mon Nov 14 08:34:45 2022, Camille, Optics, Characterization, transmission measurements through OMC #1 (before cleaning) PXL_20221111_200942943.jpgPXL_20221111_200957951.jpg
    Reply  Mon Nov 14 09:27:13 2022, Koji, Optics, Characterization, transmission measurements through OMC #1 (before cleaning) OMC_Powerbudget.xlsx
Entry  Fri Nov 11 19:07:48 2022, Koji, Supply, General, Supply Order 
Entry  Mon Nov 7 21:16:16 2022, Camille, Optics, Configuration, Setting up the fiber couplers PXL_20221108_003849213.jpgPXL_20221108_003909265.jpgPXL_20221108_003929309.jpg
    Reply  Mon Nov 7 22:00:33 2022, Koji, Optics, Configuration, Setting up the fiber couplers 
Entry  Mon Sep 26 14:27:49 2022, Koji, General, General, LLO OMC ICS work 
Entry  Tue Sep 20 08:54:33 2022, Koji, General, General, PD cage arrangement 
Entry  Mon Jul 18 14:20:09 2022, Koji, General, General, OMC #002 Plan Portal 
    Reply  Tue Jul 19 03:17:56 2022, Koji, General, General, OMC #002 Power Budget before mirror cleaning 
       Reply  Thu Jul 21 02:55:06 2022, Koji, General, General, OMC #002 Power Budget after mirror cleaning 
    Reply  Thu Jul 21 14:35:35 2022, Koji, General, General, Bond reinforcement blocks for the invar brackets IMG_1095.JPGIMG_1091.JPG
    Reply  Thu Jul 21 14:55:48 2022, Koji, General, General, Optics bonding for the backscatter measurement IMG_1098.JPG
    Reply  Thu Jul 21 17:47:00 2022, Koji, General, General, The profile of the beam incident on the fiber input coupler fiber_beam_profile.pdf
    Reply  Fri Jul 22 00:31:17 2022, Koji, General, General, OMC #002 backscatter measurement OMC_backscatter.pdf
    Reply  Fri Jul 22 17:47:38 2022, Koji, General, General, C&B request for the reinforcement blocks PXL_20220722_222013127.jpg
    Reply  Tue Jul 26 00:12:58 2022, Koji, General, General, High QE PD: QE measurements IMG_1118.JPG
       Reply  Wed Jul 27 10:34:09 2022, Koji, General, General, High QE PD: QE measurements 2 IMG_1119.JPGIMG_1120.JPG
    Reply  Wed Jul 27 10:09:51 2022, Koji, General, General, 4+4 wire clamp in hand PXL_20220727_072154009.jpg
    Reply  Wed Jul 27 10:34:30 2022, Koji, General, General, OMC #002 Protective FirstContact Paint IMG_1125.JPG
    Reply  Wed Jul 27 23:52:18 2022, Koji, General, General, OMC #002 Cable bracket replacement (1) IMG_1126.JPGIMG_1135.JPGIMG_1127.JPGIMG_1129.JPGIMG_1130.JPG
    Reply  Thu Jul 28 00:28:15 2022, Koji, General, General, OMC #002 Cable bracket replacement (2)  IMG_1132.JPGIMG_1133.JPGIMG_1136.JPG
    Reply  Thu Jul 28 00:46:47 2022, Koji, General, General, Subject: OMC #002 Cable bracket replacement (3) IMG_1137.JPGIMG_1148.JPGIMG_1138.JPG
    Reply  Wed Aug 10 18:42:27 2022, Koji, General, General, OMC #002 Cable bracket replacement (4) PXL_20220809_235457354.jpgPXL_20220811_011910569.jpgPXL_20220811_013746139.jpg
       Reply  Thu Aug 11 15:24:57 2022, Koji, General, General, OMC #002 Cable bracket replacement (5) 
    Reply  Mon Aug 15 21:31:56 2022, Koji, General, General, OMC #002 Cable bracket replacement (6)  IMG_1155.JPGIMG_1149.JPGIMG_1150.JPG
    Reply  Mon Aug 15 22:06:18 2022, Koji, General, General, OMC #002 new cable tie installed IMG_1929.JPGIMG_1930.JPG
    Reply  Mon Aug 15 22:43:35 2022, Koji, General, General, OMC #002 Delamination repair Part1 (1) IMG_1926.JPGPXL_20220816_011346581.jpg
       Reply  Mon Aug 15 22:49:03 2022, Koji, General, General, OMC #002 Delamination repair Part1 (2) 7x
          Reply  Wed Aug 24 02:51:23 2022, Koji, General, General, OMC #002 Delamination repair Part1 (3) 8x
    Reply  Wed Aug 24 02:53:46 2022, Koji, General, General, OMC #002 Delamination repair Part2 (1) IMG_1168.JPGIMG_1169.JPGIMG_1170.JPGIMG_1171.JPGIMG_1175.JPG
       Reply  Wed Aug 24 03:20:59 2022, Koji, General, General, OMC #002 Delamination repair Part2 (2) 11x
          Reply  Wed Aug 24 03:26:43 2022, Koji, General, General, OMC #002 Delamination repair Part2 (3) 8x
    Reply  Wed Aug 24 02:57:43 2022, Koji, General, General, EP30-2 bonding setup IMG_1178.JPGIMG_1179.JPGIMG_1180.JPG
    Reply  Wed Aug 24 11:29:47 2022, Koji, General, General, OMC #002 ready for shipment IMG_1207.JPGPXL_20220825_004259850.jpgPXL_20220825_004307204.jpgPXL_20220825_005423342.jpgPXL_20220825_005549985.jpg
    Reply  Thu Aug 25 14:22:08 2022, Koji, General, General, LLO OMC #001 Ballast Mass investigation DSCN0917.JPGDSCN0922.JPGP6108705.JPGP6108707.JPGP6108706.JPG
       Reply  Thu Aug 25 20:05:00 2022, Koji, General, General, LLO OMC #001 Ballast Mass investigation balance_mass_config_LLO.pdf
    Reply  Fri Aug 26 22:29:02 2022, Koji, General, General, Tool Shipping Prep PXL_20220831_025623318.jpgPXL_20220831_024518032.jpgPXL_20220831_030234581.jpg
Entry  Fri Jul 15 22:14:14 2022, Koji, General, General, OMC Lab recovery for the OMC #002 test PXL_20220716_035922673.jpgPXL_20220716_025319391.MP.jpgPXL_20220716_025334324.jpgPXL_20220716_035309066.jpgPXL_20220716_035411435.NIGHT.jpg
    Reply  Tue Jul 26 00:01:59 2022, Koji, General, General, OMC #002 delamination check 2 IMG_1106.JPGIMG_1107.JPGIMG_1110.JPG
Entry  Mon Jul 25 18:25:04 2022, Koji, General, General, A/C Filter was replaced 
Entry  Thu May 20 17:03:50 2021, Koji, General, General, SRS LCR meter SRS720 borrowed from Downs P_20210520_154841.jpg
    Reply  Sun May 30 15:17:16 2021, Koji, General, General, DCPD AF capacitance measirement PD_cap_meas.pdf20210529013015_IMG_0577.jpeg20210529013114_IMG_0580_2.jpeg20210529013200_IMG_0584.jpeg20210529013229_IMG_0586.jpeg
       Reply  Sun May 30 15:32:56 2021, Koji, General, General, DCPD AF capacitance measirement highQEPD_capacitance.pdfC30665_capacitance.pdf
    Reply  Fri Jul 22 17:41:01 2022, Koji, General, General, SRS LCR meter SRS720 returned to Downs PXL_20220723_002330805.jpg
Entry  Tue Jun 28 16:13:34 2022, Koji, General, General, The small optical table not small enough to get out IMG-5203.jpg
Entry  Thu Jun 23 21:03:33 2022, Koji, Facility, General, Moving the small optical table to CAML (TCS Lab) PXL_20220624_035628602.jpg
Entry  Fri Feb 5 07:40:37 2021, Stephen, Supply, General, OMC Unit 4 Build Machined Parts IMG_8117.JPG
    Reply  Wed Jul 7 14:21:50 2021, Stephen, Supply, General, OMC Unit 4 Build Machined Parts IMG_9238.JPGIMG_9236.JPG
Entry  Sat Nov 21 13:58:30 2020, Koji, Electronics, Characterization, Dark Current Measurement for InGaAs QPDs Q3000_dark_current.pdf
    Reply  Sun Nov 22 13:49:12 2020, Koji, Electronics, Characterization, Impedance Measurement for InGaAs QPDs impedance_measurement.pdfP_20201121_183830.jpgimpedance_test.pdfQ3000_impedance_test.pdf
       Reply  Mon Nov 23 23:17:19 2020, Koji, Electronics, Characterization, The dark noise of the Q3000 QPDs Q3000_dark_noise_81.pdfQ3000_dark_noise_82.pdfQ3000_dark_noise_83.pdfQ3000_dark_noise_84.pdf
          Reply  Tue Nov 24 10:45:07 2020, gautam, Electronics, Characterization, The dark noise of the Q3000 QPDs 
             Reply  Tue Nov 24 12:27:18 2020, Koji, Electronics, Characterization, The dark noise of the Q3000 QPDs 
Entry  Fri Nov 20 18:51:23 2020, Koji, General, General, Instrument loan 
Entry  Fri Nov 6 18:38:00 2020, Koji, General, General, Powermeter lent from OMC Lab to 2um ECDL 
Entry  Fri Oct 23 19:09:54 2020, Koji, General, General, Particle counter transfered to Radhika 
Entry  Fri Oct 9 01:01:01 2020, Koji, General, General, TFT Monitor mounting 20201008214515_IMG_0152.jpg20201008214519_IMG_0153.jpg20201008214536_IMG_0154.jpg20201008220955_IMG_0155.jpg20201008221019_IMG_0156_2.jpg
    Reply  Fri Oct 16 00:53:29 2020, Koji, General, General, TFT Monitor mounting 
Entry  Thu Oct 8 19:55:22 2020, Koji, General, Characterization, Power Measurement of Mephisto 800NE 1166A Mephisto800NE_1166A.pdf
Entry  Fri Dec 13 14:59:18 2019, Stephen, General, General, OMC Beam Dump Production Cure Bake IMG_6080.JPGIMG_6079.JPG
    Reply  Wed Dec 18 21:54:53 2019, Koji, General, General, OMC Beam Dump Production Cure Bake P_20191218_160650_vHDR_On.jpegP_20191218_160705_vHDR_On.jpegP_20191218_160733_003.jpeg
       Reply  Mon Sep 28 16:03:13 2020, rana, General, General, OMC Beam Dump Production Cure Bake 
          Reply  Mon Sep 28 16:13:08 2020, Koji, General, General, OMC Beam Dump Production Cure Bake 
Entry  Mon Aug 10 15:53:46 2020, Koji, General, General, Lab status check 
Entry  Mon Aug 10 15:34:04 2020, Koji, Facility, Loan / Lending, Glue bake oven 
Entry  Thu Jul 31 15:07:53 2014, Koji, General, General, Item lending 
    Reply  Fri Jan 30 19:31:08 2015, Koji, General, General, Item lending 
       Reply  Tue Feb 3 18:23:49 2015, Koji, General, General, Item lending 
          Reply  Wed Feb 4 20:07:24 2015, Koji, General, General, Item lending C30140_1.JPGC30140_2.JPGC30141.JPGC30142.JPGC30143.JPG
             Reply  Tue Jul 21 20:20:12 2015, Koji, General, General, Item lending 
                Reply  Fri Sep 9 14:34:31 2016, Koji, General, General, Item lending 
                   Reply  Thu Feb 27 14:31:13 2020, Koji, General, General, Item lending P_20200227_134755_vHDR_On.jpg
                      Reply  Mon Aug 10 15:29:54 2020, Koji, General, General, Item lending 
Entry  Fri Dec 6 00:55:25 2019, Koji, Optics, General, Beamdump gluing 6x
Entry  Tue Oct 22 15:54:59 2019, Koji, Electronics, Loan / Lending, Borrowed LB1005 from Cryo Cav 
Entry  Tue Oct 22 11:56:09 2019, Stephen, Supply, General, Epoxy Status update as of 22 October 2019 image_ep30-2_epoxy_kit_pcs_item_1582_location_downs_3303.JPG
Entry  Tue Oct 22 11:52:53 2019, Stephen, General, General, Epoxy Curing Timeline of OMC PZT Assy #9 and #10 omc_elog_383_Epoxy_Curing_Timeline_of_OMC_PZT_Assy_20191022.pngomc_elog_383_Epoxy_Curing_Timeline_of_OMC_PZT_Assy.pptx
Entry  Tue Oct 22 10:25:01 2019, Stephen, General, General, OMC PZT Assy #9 and #10 Production Cure Bake  OMC_ABO_PZT_Curing_Bake_effort_201906_thru_201909.xlsproduction_cure_bake_pzt_assys_9_and_10_20190927.png
Entry  Mon Sep 23 21:29:51 2019, Koji, Optics, General, OMC(004): PZT sub-assembly gluing (#9/#10) IMG_8933.jpgIMG_8934.jpg
    Reply  Mon Sep 30 23:16:53 2019, Koji, Optics, General, OMC(004): PZT sub-assembly gluing (#9/#10) IMG_8950.jpegIMG_8953.jpegIMG_8954.jpegIMG_8955.jpeg
Entry  Thu Sep 26 17:33:52 2019, Stephen, General, General, Dirty ABO test run prior to PZT Subassembly Bonding - ABO is Ready! image_showing_20190924_abo_qualifying_bake.png
Entry  Tue Sep 24 12:19:20 2019, Stephen, General, General, Dirty ABO test run prior to PZT Subassembly Bonding  image_showing_20190923_abo_qualifying_bake.png
Entry  Wed Sep 18 23:38:52 2019, Stephen, General, General, Dirty ABO ready for PZT Subassembly Bonding index.png
Entry  Wed Sep 18 23:16:06 2019, Stephen, Supply, General, Items staged at 40m Bake Lab for PZT Subassembly Bonding IMG_5216.JPGIMG_5215.JPG
Entry  Wed Sep 18 22:30:11 2019, Stephen, Supply, General, EP30-2 Location and Status IMG_5217.JPG
ELOG V3.1.3-