  525   Tue Apr 18 07:59:46 2023 Madeline LesovskyGeneralGeneralTest Cure Bake - Curved Mirror Subassembly BondingThis is a test bake conducted in Air Bake
Oven A (ABO-A) held in the 40m Clean and
Bake facility. The overall objective is to
 6x 
  524   Mon Apr 17 17:56:25 2023 Thejas OpticsCharacterizationA+ OMC Piezos wedge angle PZT dimension analyzed and characterized.
The blue dot in the images represents the
position of the cathode. The length of the
 19x 
  523   Fri Apr 14 16:36:29 2023 ThejasOpticsCharacterizationDetermining the curvature bottom of the curved mirrorsAttached here with are relevant plots.




 21x 
  522   Fri Apr 14 15:52:53 2023 Camille MakaremOpticsCharacterizationDetermining the curvature bottom of the curved mirrors[Camille, Thejas]

We repeated Zygo measurements (using
the same setup and method as below) for curved
 dist_angle_spread_v2.PNG 
  521   Thu Apr 13 07:47:28 2023 Camille MakaremOpticsCharacterizationZygo setup for curved mirror measurements[Camille, Thejas, Stephen]

We modified the Zygo setup for
measuring the sagitta of the curved mirrors.
 dist_angle_spread.PNG 
  520   Tue Apr 11 16:18:25 2023 ThejasOpticsCharacterizationA+ OMC Curved mirror radius of curvatureCurved mirror radius of curvature raw data
can be found in the DCC document: T2300050

The input beam falling on the curved
 Screenshot_2023-04-11_at_16.23.18.pngScreenshot_2023-04-11_at_16.35.16_(2).pngini_beam.pdf 
  519   Wed Apr 5 22:09:30 2023 KojiFacilityGeneralHEPA Enclosure extensionChub finished the HEPA enclosure extension
project.
 20230405_120322.jpg20230405_120308.jpg20230405_120033.jpg 
  518   Tue Apr 4 16:14:06 2023 KojiOpticsLoan / LendingC7 mirror to DownsI handed Camille the C7 mirror for the
cross-calibration of the ROC characterization
techniques.
  
  517   Mon Apr 3 11:06:47 2023 Thejas OpticsCharacterizationFlat mirror flatnessData can be found in DCC document T2300050. 

 

On Friday. Camille and I measured
  
  516   Tue Mar 28 11:21:27 2023 Camille MakaremOpticsCharacterizationSagitta measurements of curved mirrors[Camille, Stephen, Thejas]

Curved mirror sn02 was used to test
 CurvedMirrorSN02_SurfaceProfiles.PNG 
  515   Fri Mar 24 07:47:37 2023 Camille MakaremOpticsCharacterizationROC measurements of the curved mirrors[Camille]
22 March 2023
Beam profile measurements were continued
 CurvedMirror_FL_measurments.PNGsn07.PNG 
  514   Fri Mar 24 07:38:54 2023 Camille MakaremOpticsCharacterizationROC measurements of the curved mirrors[Thejas, Camille]
21 March 2023

We made slight adjustments to the
  
  513   Fri Mar 17 15:01:21 2023 Koji OpticsCharacterizationA+ OMC Curved mirror radius of curvatureThanks Koji, the lenses available in the
cabinet in the lab actually sufficed. 

  
  512   Wed Mar 15 17:07:35 2023 Koji OpticsCharacterizationA+ OMC Curved mirror radius of curvatureI hope you can find useful lenses from
the lens kit in the cabinet. If you need
more lenses and mounts, talk to our students
  
  511   Wed Mar 15 15:28:24 2023 Thejas OpticsCharacterizationA+ OMC Curved mirror radius of curvatureThanks for teh comment Koji. Yes, I did
see this effect by comparing the beam sizes
with and without the curved mirror. But the
  
  510   Tue Mar 14 20:06:03 2023 Koji OpticsCharacterizationA+ OMC Curved mirror radius of curvatureIf the mirror has the RoC, it works as
a lens. And you should be able to see the
effect in the beam profile.
  
  509   Tue Mar 14 18:24:03 2023 Thejas OpticsCharacterizationA+ OMC Curved mirror radius of curvatureToday, I tried to measure the radius of
curvature of the curved mirror using the
input beam for the OMC test set-up. It was
 Screenshot_2023-03-14_at_18.29.56.pngScreenshot_2023-03-14_at_18.32.32.pngScreenshot_2023-03-14_at_18.33.28.png 
  508   Tue Mar 14 12:12:41 2023 Koji OpticsCharacterizationA+ OMC curved mirror characterizationRoC: 2.65m ! Interesting. I'll wait
for the follow-up analysis/measurements.
The RoC may be dependent on the area (diameter)
  
  507   Tue Mar 14 10:41:06 2023 Thejas OpticsCharacterizationA+ OMC curved mirror characterization[Camille, GarriLynn, Stephen, Thejas]

Folllowing the replacement of the
spherical transmission / reference mirror
 image.jpeg 
  506   Fri Mar 10 11:12:57 2023 Thejas OpticsCharacterizationA+ OMC Curvature minimum of curved optics [GariLynn, Stephen, Thejas]

Yesterday, we placed an iris (borrowed
from OMC Lab) infront of the spherical transmission
  
  505   Fri Mar 10 10:23:08 2023 ThejasOpticsCharacterizationA+ OMC curved mirror radius of curvature OMC test set-up

Yesterday, laser beam output from
the fibre follwoing teh mode-matching lenses
 IMG_1E4662B2100B-1.jpegScreenshot_2023-03-10_at_10.49.45.pngScreenshot_2023-03-10_at_10.51.42.pngOMC_8_(dragged).pdf 
  504   Wed Mar 8 17:27:51 2023 Thejas OpticsCharacterizationA+ OMC Curvature minimum of curved optics [Stephen, Thejas]

Today, a more rigorous effort was
made to re-measure the position of the optics
 image.jpeg 
  503   Tue Mar 7 23:00:16 2023 Thejas OpticsCharacterizationOMC Lab clean upToday, Koji and I cleaned up the the lab
space and made some space on the
optical table for radius of curvature measurement
 IMG_0173-2.jpgIMG_0175-2.jpg 
  502   Tue Mar 7 10:20:55 2023 Thejas OpticsCharacterizationA+ OMC Curved mirror radius of curvature[Camille, Stephen, Thejas]

Stephen returned the curved mirror
#6 to Liyuan for point transmission measurement.
 image.jpegimage.jpegimage.jpegimage.png 
  501   Mon Mar 6 16:02:56 2023 Thejas OpticsGeneralOMC test setup locking On Feb 16, Camille and I attampted at locking
the OMC cavity. It was quick to re-align
the beam to the cavity (by using only the
  
  500   Mon Mar 6 12:25:08 2023 KojiFacilityGeneralHEPA Enclosure improvementChub, JC, and co worked on the HEPA enclosure
improvement.
 20230306_081449.jpg20230306_081518.jpg 
  499   Wed Mar 1 10:23:10 2023 Thejas OpticsCharacterizationA+ OMC curved mirror characterization[Camille, Thejas, Stephen]

Yesterday, efforts were made to
measure ROC of curved mirrors (#6) in the
  
  498   Mon Feb 27 17:40:27 2023 Thejas OpticsCharacterizationA+ OMC curved mirror characterization[Camille, Stephen, Thejas]

Today, before the ZYGO lab was
cleaned and prepared for the cureved mirrors'
  
  497   Fri Feb 17 17:41:57 2023 Thejas ElectronicsCharacterizationA+ OMC Piezos wedge angle [Camille, Stephen, Thejas]

PZT model: Noliac 2124

Qty: 18 (Sr. No. 30 - 48)
 OMC_6_(dragged).pdf 
  496   Fri Feb 17 17:25:39 2023 Thejas OpticsCharacterizationA+ OMC Breadboard measuerementsYesterday we also measured weight and dimensions
of breadboard. Error for the following measurements
is same as the least count of the instruments
 IMG_3753BB8D72D5-1.jpegIMG_62A5AD50E8D1-1.jpegOMC_5_(dragged).pdf 
  495   Fri Feb 17 17:11:28 2023 Thejas OpticsCharacterizationA+ OMC beam-splitter prisms wedge angle measurement [Camille, Stephen, Thejas]

 

Yesterday we measured wedge angle
 11x 
  494   Wed Feb 15 17:40:21 2023 Thejas OpticsCharacterizationA+ OMC perpendicularity of hole prisms[Camille, Stephen, Thejas]

Contnuing the efforts to measure
and check perpendicularity: tombstone prisms
 20x 
  493   Wed Feb 15 16:00:46 2023 StephenElectronicsGeneralOMC cables #4 inspectedInspection

Updated ICS (Shipment-12578) and
moved those parts to Storage-9482.
 cable_residue_OMC_Lab_493_20230215_145127.jpg 
  492   Tue Feb 14 22:52:35 2023 Thejas OpticsCharacterizationA+ OMC Prism perpendicularity of HR Prisms and BS[Camille, Stephen, Thejas]

Continuing with the efforts to
measure the perpndicularity.
 18x 
  491   Tue Feb 14 10:45:00 2023 Thejas OpticsCharacterizationA+ OMC Prism perpendicularity[Camille, Stephen, Thejas]

Following the wedge angle measurements
of the prisms, perpendicularoty of their
 27x 
  490   Thu Feb 9 15:54:41 2023 Thejas OpticsCharacterizationA+ OMC, Parallelism of HR Prisms [Camille, Thejas, Stephen]

Continuing yesterday's efforts
to measure the wedge angle of the back surface
 19x 
  489   Wed Feb 8 16:10:52 2023 StephenOpticsCharacterizationA+ OMC, Parallelism of HR Prisms[Camille, Thejas, Stephen]

We set up the white light autocollimator
in the Downs B119 cleanroom. (Nippon Kogaku,
 7x 
  487   Sat Feb 4 03:33:22 2023 KojiGeneralGeneralOMC Lab InventoryAttachment 1: North Cabinet 2nd from the
left

Attachment 2: North Cabinet 3rd
 PXL_20230204_072749311.jpgPXL_20230204_072744686.MP.jpgPXL_20230204_073603041.MP.jpg 
  486   Sat Feb 4 03:30:02 2023 KojiElectronicsGeneralOMC cables #4 arrived The OMC cables #4 arrived on Feb 3rd. (See
Attachment)

This shipment included two DCPD
 PXL_20230202_210750100.jpg 
  485   Sat Feb 4 03:22:46 2023 KojiFacilityGeneralReady for the HEPA enclosure expansionHEPA is quite low for a tall person and
also the curtain on the back of us is always
heavy. It's very tough for anyone to
 PXL_20230202_002014960.MP.jpgPXL_20230203_011618168.MP.jpgPXL_20230203_011633873.jpg 
  484   Sat Feb 4 03:16:10 2023 KojiOpticsGeneralOMC #4: One Invar block bonded with tiltThe attached photo shows the resulting
bond spread.

 
 PXL_20230202_213114009.jpg 
  483   Thu Feb 2 03:09:41 2023 KojiOpticsGeneralOMC #4: One Invar block bonded with tilt[Camille, Thejas, Koji]

We added a reinforcement bar at
the back of the invar block which had the
 PXL_20230202_003156761.jpgPXL_20230202_003204058.jpg 
  482   Wed Feb 1 01:44:14 2023 KojiGeneralGeneralOMC (004) plan2/1 2:30PM~ Bonding reinforcement (Last
EP30-2 gluing)

2/2 1:00PM~ Peripheral attachment
  
  481   Wed Feb 1 01:39:41 2023 KojiMechanicsGeneralDCPD housing / QPD housingInserted 4-40 and 2-56 helicoils into the
DCPD/QPD housings for the 4th OMC. The retainer
caps were also fastened to the housings.
 PXL_20230201_021505299.jpgPXL_20230201_021455728.jpg 
  480   Wed Feb 1 01:33:03 2023 KojiMechanicsGeneral5th OMC Transport FixtureThe transport fixture was brought to the
40m clean room to use as an assembly reference.
 PXL_20230201_005912224.jpg 
  479   Sat Jan 28 00:46:21 2023 KojiMechanicsGeneralOMC #4: Replaced the locks of the transport fixture Yesterday, we noticed that we could not
close the transport fixture for OMC #4. We
could not fully rotate the knobs of the locks.
 PXL_20230128_022952669.jpg 
  478   Sat Jan 28 00:38:56 2023 KojiMechanicsGeneralOMC #1 cable bracket replacement / OMC #1 repair completedThe AL metal bracket was replaced with
a PEEK version.

Attachments 1/2: Before the replacement.
 PXL_20230128_011405446.jpgPXL_20230128_011401778.jpgPXL_20230128_013509885.jpgPXL_20230128_014001006.jpgPXL_20230128_014035044.jpg 
  477   Thu Jan 26 23:46:13 2023 KojiOpticsGeneralOMC #1 input beam dump bondingA beam dump was stacked on the base of
the previous beam dump. The angle was determined
so that the main transmission goes through
 PXL_20230127_052955482.jpgPXL_20230127_052949869.jpg 
  476   Thu Jan 26 23:16:35 2023 KojiOpticsConfigurationOMC #4: Top side bonding.[Camille, Koji]
 PXL_20230126_235309334.jpgPXL_20230127_053008237.jpgPXL_20230127_053020709_2.jpgPXL_20230127_053042809.MP_2.jpgPXL_20230127_053058275_2.jpg 
  475   Thu Jan 26 23:07:14 2023 KojiOpticsGeneralOMC #4: Input beam dump bonding[Camille, Koji]

During the second UV epoxy session,
we did not bond the input beam dump. This
 PXL_20230126_221556977.jpg 