    Reply  Tue May 21 18:28:08 2013, Koji, General, General, Current most reliable OMC schedule 
- The wrong Mighty Mouse connectors for the PZT wires were prepared. The correct ones are in the vacuum oven till Tuesday morning.
- The thread holes for the cable pegs are 1/4-20 rather than 10-24.  This requires re-machining of the cable pegs & the C&B.
- We are waiting for the fast shipment of the from LHO
Entry  Mon Jun 3 21:19:03 2013, Koji, General, General, Planning 
Monday - Evening
(Koji)
[done] - DCPD alignment
Entry  Wed Jun 5 01:06:35 2013, Zach, General, Characterization, L1 OMC as-built diagram L1OMC_asbuilt.pdf
 D1300507
 
Entry  Wed Jun 5 18:19:51 2013, Koji, General, General, Some recent photos from the OMC final test at CIT 
Applying First Contact for the optics cleaning
Entry  Wed Jun 5 18:51:31 2013, Koji, General, General, L1 OMC shipped out CAM00011.jpgP6054027.JPG
[Koji, Jeff]
The L1 OMC finally sent out from Caltech!
Entry  Fri Jun 7 16:04:44 2013, Koji, General, General, [LLO] OMC arrived 
[Koji Zach Suresh]
The OMC arrived at LLO without any destruction!

    We found that one shock sensor on the box turned red, the other stayed white.
    We brought the Perican case to the changing
Entry  Mon Jun 10 10:04:37 2013, Koji, General, General, [LLO] OMC Test OMC_pow_cal.pdfresponsivity.pdfOMC_pow_cal_compensated.pdf
[Koji Zach]
We worked on the OMC test over the weekend.
- At the beginning, the measured OMC transmission was ~85% even after subtracting the junk light and sidebands from the calculation.
Entry  Thu Jun 13 12:04:57 2013, Koji, General, General, [LLO] OMC Optical Test - completed 
https://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=7373
Entry  Thu Jun 13 12:12:20 2013, Zach, General, General, [LLO] OMC and OMCS in LVEA 
https://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=7395
Entry  Fri Jun 14 06:35:21 2013, Jeff, General, General, [LLO] L1 OMC status preamp_arrangement.png
https://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=7410
Weights:
Suspension cage and transportation box: 250.8lb
Entry  Tue Jun 18 15:45:38 2013, Koji, General, General, [LLO] OMC installation in HAM6 
OMC installed in HAM6!
https://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=7486
   
Entry  Fri Jun 28 12:20:49 2013, Koji, General, General, Dmass's loan of Thorlabs HV amp 
http://nodus.ligo.caltech.edu:8080/Cryo_Lab/799
(KA: Returned upon H1OMC building)
Entry  Fri Aug 9 10:09:56 2013, Koji, General, General, PZT Assembly #3/#4 PZT_assembly.pdf
Yesterday, Jeff and I bonded the PZT assemblies (#3/#4).
The attached is the arrangement of the components
    Reply  Mon Aug 12 20:22:19 2013, Koji, General, General, PZT Assembly #5/#6 
PZT Assembly #5/#6 were glued on Fri Aug 9th
They are removed from the fixture on Mon Aug 12th.
All of the four PZT assemblies were moved to the OMC lab.
Entry  Fri Aug 16 17:21:38 2013, Koji, General, General, [OMC002] Build started 
[Jeff Koji]

The breadboard (SN2) was loaded on the transportation fixture.

The laser side template was installed and the cavity mirrors were placed.
Entry  Fri Aug 30 12:25:29 2013, Koji, General, General, H1 OMC Invar mount gluing P8304368.JPGP8304370.JPG
The Invar Mounting Blocks were glued on the breadboard.
Serial number #1/2/5/6/7/8 -> I1 OMC cable side
Serial number #9/10/11/12 -> H1 OMC cavity side
Entry  Tue Sep 3 17:03:25 2013, Koji, General, General, H1 OMC gluing completed 
[Koji Jeff]
H1 OMC All Gluing completed
5 Glue H1 beam dumps (UV)
Entry  Wed Sep 4 22:22:54 2013, Koji, General, General, H1 OMC wrapped and moved to the bake lab. 
[Koji, Jeff]
We moved the H1OMC to the bake lab.
Chub set up the vacuum bake oven (Oven F) and running without the actual OMC.
Entry  Sat Sep 7 17:20:56 2013, Koji, General, General, OMC/PD lab optical table wrapping P9064377.JPG
[Koji Jeff]
In order to prepare for the splinkler installation on the HEPA enclosure, the table with the optics was wrapped with Ameristat sheets.
    Reply  Fri Sep 13 15:09:20 2013, Koji, General, General, Sprinkler installation: done P9134379.jpgP9134378.jpg
A sprinkler head was installed on the HEPA enclosure. The head is covered with a plastic cap.
Entry  Tue Oct 22 17:17:59 2013, Koji, General, General, H1OMC cabling 
[Chub, Jeff, Koji]
We worked on the wiring and routing of the cables.
- The cables for the PZT was installed first. 
Entry  Wed Oct 23 02:45:07 2013, Koji, General, General, PD realignment 
DCPD2 got misaligned during the cable installation. The PD alignment procedure have been gone through again.
Cavity locking 
- Removed the FC layers for the cavity related mirrors.
Entry  Mon Nov 4 19:43:56 2013, Koji, General, General, H1OMC Packed 
H1OMC PZT connector was replaced with the correct one. This was the final step for H1OMC.
Jeff and I packed the OMC and put it in the perikan case. It will be shipped tomorrow.
The other tools are also packed in the other box. Here is the list of the items
Entry  Thu Nov 21 00:05:35 2013, Koji, General, General, H1OMC electronics arrangement H1OMC_cable_arrangement.pdf
Checked the PZT arrangement: Mighty Mouse Pin1&2 -> PZT2 (DCPD side), Mighty Mouse Pin3&4 -> PZT1 (QPD side)
DCPD response: 
Illuminate DCPD1 (T) -> DCPD B responded in MEDM
Entry  Tue Dec 10 16:41:51 2013, Koji, General, General, To Buy 
Masks / Wipes => done
Entry  Tue Feb 18 18:58:38 2014, Koji, General, General, LHO H1 OMC installation photos 
LHO OMC installation photos
Entry  Fri Feb 28 19:50:11 2014, Koji, General, General, Misalignment ABCD matrix for the aLIGO OMC misalignment.pdf
Relationship between mirror misalignment and cavity mode shift was calculated.
The technique described in T0900647 by Sam Waldman was used.
The angles and displacement of the mirrors and beams are defined in the attached figure.
Entry  Mon Mar 3 02:46:21 2014, Koji, General, Characterization, Spot positions scanned 
Spot positions on CM1 and CM2 scanned according to the recipes provided by the previous entry.
The best result obtained was:
Transmission from FM2: 32.7mW
Entry  Tue Jun 24 18:43:15 2014, Koji, General, General, ICS entries for the OMC baking/assembly 
For baking:

    Assembly Name aLIGO Output Mode Cleaner
    Assembly Number D1201439
    Reply  Fri Jun 27 12:29:50 2014, Koji, General, General, OMC baking P6266536.jpg
The OMC went into the oven at around 2PM on Thursday. It will be baked at 80degC for 48 hours.
The RGA result will be obtained on Monday.
Link to the ICS entry
Entry  Fri Jun 27 18:51:33 2014, Koji, General, General, Supply 
PTOUCH TAPE (12mm white) x 2
9V batteries
    Reply  Wed Jul 2 16:41:43 2014, Koji, General, General, OMC baking 
OMC is back from the oven today.
To Do:
Optical tests
Entry  Wed Jul 2 18:58:42 2014, Koji, General, General, Beam dump delamination beamdump_delamination.png
While the OMC breadboard was being inspected, it was found that two out of five black-glass beam dumps showed sign of delamination.
(attached photos).
The base of the each beam dump is a fused silica disk (25mm dia.). The black glass pieces are bonded to the disk. The bond is EP30-2 
    Reply  Thu Jul 3 17:45:18 2014, Koji, General, General, Beam dump delamination beamdump_delamination_solution.png
Here is the resolution.
I'll apply fillets of EP30-2 along the edges of the black glass (See figure). 
In order to allow the air escape from the gap, the inside of the V will not be painted. 
Entry  Mon Jul 7 01:36:03 2014, Koji, General, General, To Do 
Optical tests

    Cleaning
    Power Budget
    FSR measurement
    TMS
measurement
    TMS measurement (with DC voltage on PZTs)
    PZT DC response
    PZT AC response
    Reply  Tue Jul 8 04:08:06 2014, Koji, General, General, Expoxy reapplication for beam dumps 
Firstly, the excess epoxy was removed using a cleaned razor balde
    Reply  Thu Jul 10 08:34:57 2014, Koji, General, General, To Do 
Optical tests

    Cleaning
    Power Budget
    FSR measurement
    TMS
measurement
    TMS measurement (with DC voltage on PZTs)
    PZT DC response
   
Entry  Sun Jul 20 17:20:39 2014, Koji, General, General, The 3rd (LIO) OMC was shipped out to LHO  
The 3rd (LIO) OMC was shipped out to LHO on Friday (Jul 18) Morning.
At LHO
- All of the on-breadboard cables should be attached and tied down.
Entry  Thu Jul 31 15:07:53 2014, Koji, General, General, Item lending 
Tara: Laser Safety goggle -> Returned

Evan:
HP signal generator (990MHz) (prev. setting 32.7MHz / +3dBm)
Entry  Mon Aug 4 18:59:50 2014, Koji, General, General, A memorandom 
On breadboarfd cabling for 3IFO OMC
D1300371 - S1301806
D1300372 - S1301808
Entry  Tue Aug 5 13:03:25 2014, Koji, General, General, Missing cable components 
DCPD Connector Face: Qty2 https://dcc.ligo.org/LIGO-D1201276
QPD Connector Face: Qty2 https://dcc.ligo.org/LIGO-D1201282
PD faster: 92210A07 Qty 4: MCMASTER #2-56 x .25 FHCS
Entry  Sat Jan 17 11:40:04 2015, Koji, General, General, 3rd OMC completed 
Jan 15, 2015 3rd OMC completed

The face caps of the DCPD/QPD cables were installed (Helicoils inserted)
PD7&10 swapped with PD11(for DCPD T) and PD12(DCPD R).
    Reply  Fri Jan 30 19:31:08 2015, Koji, General, General, Item lending 
Gabriele:

PZT HV Amp

Evan:
    Reply  Tue Feb 3 18:23:49 2015, Koji, General, General, Item lending 
- The laser was removed and shipped to LHO today.

- UV illuminator / fused silica fiber light guide / UV power meter / UV face shield (Qty 2) will be shipped to MIT.
They are CIT properties except for the illuminator.
    Reply  Wed Feb 4 20:07:24 2015, Koji, General, General, Item lending C30140_1.JPGC30140_2.JPGC30141.JPGC30142.JPGC30143.JPG
Shipment to MIT (L. Barsotti, J. Miller)

1. UV Illuminator (LESCO Super Spot MK III)

2. UV Power meter (American Ultraviolet AIB1001) Caltech property C30140
Entry  Wed Feb 18 21:51:23 2015, Koji, General, General, Notes on OMC Transportation Fixtures & Pelican 
LLO has one empty OMC transportation fixture.

LHO has one empty OMC transportation fixture.

LHO has one OMC transportation fixture with 3IFO OMC in it.
    Reply  Tue Jul 21 20:20:12 2015, Koji, General, General, Item lending 
Kate (ATF)

- 4ch color oscilloscope (Tektronix)

- Chopper controller
Entry  Fri Dec 18 15:33:24 2015, Koji, General, Loan / Lending, Loan from Rich 
Loan Record: I borrowed a PD can opener from Rich => Antonio Returned Sep 9, 2016

Tungsten Carbide Engraver (permanently given to the OMC lab)

KEITHLEY SOURCE METER + Laptop
Entry  Tue Dec 29 12:15:46 2015, Koji, General, General, Glasgow polarizer passed to Kate 
The Glasgow polarizer was passed to Kate on Dec 17, 2015.
Entry  Thu Feb 18 21:08:32 2016, Koji, General, Loan / Lending, (all returned) Antonio loan 
Antonio borrowed: Rich's PD cutter (returned), Ohir power meter(returned), Thorlabs power meter head, Chopper