Entry  Fri Jan 18 13:25:17 2013, Koji, Optics, Configuration, Autocollimator calibration autocollimator_calibration.pdf
An autocollimator (AC) should show (0,0) if a retroreflector is placed in front of the AC.
However, the AC may have an offset. Also the retroreflector may not reflect the beam back with an exact parallelism.
To calibrate these two errors, the autocollimator is calibrated. The retroreflector was rotated by 0, 90, 180, 270 deg
Entry  Sat Jan 19 20:47:41 2013, Koji, Optics, Characterization, Wedge measurement with the autocollimator autocollimator_wedge_measurement.pdf
The wedge angle of the prism "A1" was measured with the autocollimator (AC).
The range of the AC is 40 arcmin. This means that the mirror tilt of 40arcmin can be measured with this AC.
This is just barely enough to detect the front side reflection and the back side reflection.
Entry  Tue Jan 22 11:10:25 2013, Koji, Facility, General, Eyeware storage and hooks for the face shields are installed P1223116.JPG
A carpenter has come to install the eyeware storage and hooks for the face shields.
Entry  Tue Jan 22 17:56:32 2013, Koji, Mechanics, General, Rotary stage selection 
Newport UTR80

    Sensitivity: 4 arcsec
    Graduations: 1 deg
    Vernier: 1 arcmin
    Fine travel range: 4 deg
    
Entry  Mon Feb 4 00:39:08 2013, Koji, Optics, Characterization, Wedge measurement with the autocollimator and the rotation stage autocollimator_wedge_measurement.pdf
Method:

    Mount the tombstone prism on the prism mount. The mount is fixed on the rotation stage.
    Locate the prism in front of the
autocollimator.
    Find the retroreflected reticle in the view. Adjust the focus if necessary.
    Confirm that the rotation of the
    Reply  Wed Feb 6 02:34:10 2013, Koji, Optics, Characterization, Wedge measurement with the autocollimator and the rotation stage 
Measurement:

    A6:   α = 0.665 deg, β = +3.0 arcmin (1.5 div up)
    A7:   α = 0.635 deg, β =  
0.0 arcmin (0.0 div up)
    A8:   α = 0.623 deg, β = - 0.4 arcmin (-0.2 div up)
    A9:   α =
Entry  Thu Feb 7 21:35:46 2013, Koji, General, General, Dmass's loan of LB1005 / A2&C2 sent to Fullerton / First Contact @40m P2053119.jpgP2053120.JPG
Dmass borrowed the LB1005 servo amp from the OMC lab.
It happened this week although it seems still January in his head. Got it back on Mar 24th
The A2 and C2 mirrors have been sent to Josh Smith at Fullerton for the scatterometer measurement.
Entry  Thu Feb 7 23:01:45 2013, Koji, Optics, Characterization, UV epoxy gluing test 
 [Jeff, Yuta, Koji]
Gluing test with UV-cure epoxy Optocast 3553-LV-UTF-HM
- This glue was bought in the end of October (~3.5 months ago).
Entry  Thu Feb 21 18:44:18 2013, Koji, Optics, Configuration, Perpendicularity test perpendicularity_test.pdfP2203206.JPG
Perpendicularity test of the mounting prisms:
The perpendicularity of the prism pieces were measured with an autocollimator.
Two orthogonally jointed surfaces forms a part of a corner cube. 
    Reply  Wed Feb 27 18:18:48 2013, Koji, Optics, Configuration, More perpendicularity test 
Mounting Prisms:
(criteria: 30arcsec = 145urad => 0.36mm spot shift)
SN  Meas.(div) ArcSec Spec.
    Reply  Fri Mar 1 23:06:15 2013, Koji, Optics, Configuration, More perpendicularity test final 
Perpendicularity of the "E" mirror was measured.

Mounting Prisms:
(criteria: 30arcsec = 145urad => 0.36mm spot shift)
    Reply  Fri Mar 1 23:52:18 2013, Koji, Optics, Characterization, Wedge measurement with the autocollimator and the rotation stage 
Measurement:

    E1:   α =  0.672 deg, β = +0.0  arcmin (0 div up)
    E2:   α =  0.631 deg, β = - 0.3  arcmin
(-0.15 div down)
    E3:   α =  0.642 deg, β = +0.0  arcmin (0 div up)
    E4:   α =  0.659 deg, β
Entry  Thu Mar 7 15:53:47 2013, Koji, Mechanics, General, OMC Transportation fixture, OMC PD/QPD mounts P3073218.JPGP3073219.JPGP3073223.JPGP3073225.JPGP3073227.JPG
 
Entry  Thu Mar 14 17:06:21 2013, Koji, Mechanics, General, OMC SUS work @LLO 2013-03-14_16.03.40.jpg2013-03-14_16.04.07.jpg
EDIT (ZK): All photos on Picasa.
Also, I discovered that since Picasa was migrated to Google+ only, 
you no longer have the option to embed a slideshow like you used to. Lame, Google.
Entry  Thu Mar 14 22:18:23 2013, Koji, General, General, New loans for the diode test 
ALL returned

Loan from ATF:

2 blue banana cables returned on
Jun 4, 2013
Entry  Fri Mar 15 02:15:45 2013, Koji, Electronics, Characterization, Diode testing QPD_GR_TEST_130316.pdf
Diode testing
o Purpose of the measurement
- Test Si QPDs (C30845EH) for ISC QPDs Qty 30 (i.e. 120 elements)
    Reply  Sun Mar 17 21:59:47 2013, Koji, Electronics, Characterization, Diode testing ~ DCPD OMCPD_TEST_130317.pdf
- For the dark noise measurement, the lid of the die-cast case should also contact to the box for better shielding. This made the 60Hz lines almost completely
removed, although unknown 1kHz harmonics remains.
- The precise impedance of the setup can not be obtained from the measurement box; the cable in between is too long. The diode impedance should
Entry  Sat Mar 23 02:32:23 2013, Koji, Facility, General, N2 cylinder delivered P3233349.jpg
Preparation for ionized N2 blow
- 99.9998% N2 cylinder delivered (ALPHAGAZ 2 grade by AIR LIQUIDE) ALPHAGAZ
2 [PDF]
Entry  Sat Mar 23 02:41:00 2013, Koji, Optics, General, Black glass beam dumps for the first OMC P3223314.JPGP3223319.jpgP3223320.jpg
Received black glass beam dumps from MIT
- gluing by EP30-2 looks pretty fine. Enough sturdy.
- some gap visible between the glass => incident angle should be considered so that the first beam does not exit from the gap
Entry  Sat Mar 23 13:34:14 2013, Koji, Optics, General, PZT assembly prototype glued P3223322.jpgP3223323.jpgP3233336.jpgP3233348.jpg
 
Prototype PZT assembly
Motivation:
Entry  Sat Mar 23 16:36:15 2013, Koji, Electronics, Characterization, Diode QE measurement P3213308.JPGP3213310.JPG
Quantum efficiencies of the C30665GH diodes were measured. 
- The diode was biased by the FEMTO preamplifier.
- Diode Pin 1 Signal, Pin 2 +5V, Pin 3 open
Entry  Mon Mar 25 02:04:05 2013, Koji, General, General, OMC building plan / procedure ~ WB18 
WB 18 March 

    Diode test
    
        Dark current / Dark noise / Impedance
        Quantum Efficiency test (but with glass)
        Diode given
    Reply  Mon Mar 25 18:34:25 2013, Koji, General, General, OMC building plan / procedure ~ Mar 25 Mon 
25 March (Mon): 
Inspect the test PZT assembly

    => Give it to Bob. (done)

Glue topside components 
Entry  Mon Mar 25 19:31:16 2013, Koji, Optics, General, OMC Top-side gluing P3253353.jpgP3253372.jpgP3253394.jpgP3253400.jpg
[Koji Jeff Zach]  
AAA
Entry  Tue Mar 26 22:33:07 2013, Koji, General, General, Loan for the OMC building 
Loan from PSL Lab
- 300mm mirror with Ultima mount and pedestal
- Isopropanol small glass bottleReturned on Apr 12 2013. 
    Reply  Wed Mar 27 20:54:45 2013, Koji, General, General, OMC building plan / procedure ~ Mar 26 Mon 
26 March (Tue):
- Curved mirror characterization (Koji, done)
 - Input optics for the cavity locking (Zach)
    Reply  Wed Mar 27 20:54:54 2013, Koji, General, General, OMC building plan / procedure ~ Mar 27 Wed 
27 March (Wed)
- AOM drift investigation (Lisa, Zach)
- Cavity input optics ~ Fiber coupling (Zach)
    Reply  Wed Mar 27 20:55:10 2013, Koji, General, General, OMC building plan / procedure ~ Mar 28 Thu 
28 March (Thu): 

    Rebuild the bottom template in the lab
    Place the bottom template on the OMC
    Glue the PZTs on the mounting
prisms (x2)
    Glue the curved mirrors on the PZTs (x2)
    R&T measurement
    Placing optics on the OMC breadboard
Entry  Mon Apr 1 03:13:41 2013, Koji, Optics, General, Failure of PZT-glass joints 
[Koji, Jeff, Zach, Lisa]
We glued a test PZT-mirror assembly last week in order to make sure the heat cure of the epoxy does not make any problem 
on the glass-PZT joints. The assembly was sent to Bob for the heat treatment. We received the assembly back from Bob on Wednesday.
Entry  Mon Apr 1 03:23:48 2013, Koji, Optics, General, UV power calibration 
[Koji Lisa Jeff Zach]
Eric G bought a UV power meter from American Ultraviolet.
Our UV illuminator was calibrated by this power meter.
Entry  Mon Apr 1 10:28:03 2013, Koji, Mechanics, General, Additional UV blast for the top surface P3283483.JPGP3283459.jpgP3283473.JPG
[Koji, Lisa, Jeff, Zach]

Jeffs concern after talking with the glue company (EMI) was that the UV blast for the top side was not enough.
Entry  Mon Apr 1 18:17:01 2013, Koji, Optics, General, Mirror curvature center test 6x
Locations of the curvature minimum on the OMC curved mirrors have been measured. 

Motivation:

When a curved mirror is misaligned, the location of the curvature center is moved.
Entry  Wed Apr 3 17:39:38 2013, Koji, Mechanics, Characterization, Calibration of the test PZTs before the glue test P4033491.JPGshadow_sensor_calib.pdf
We want to make sure the responses of the PZT actuator does not change after the EP30-2 gluing.
A shadow sensor set up was quickly set-up at the fiber output. It turned out the ring PZTs are something really not-so-straightforward. 
If the PZT was free or just was loosely attached on a plane by double-sided tape, the actuation response was quite low (30% of the spec). 
Entry  Wed Apr 3 18:42:45 2013, Koji, Optics, General, EP30-2 gluing test 
EP30-2 gluing test
Entry  Thu Apr 4 01:35:04 2013, Koji, Optics, Characterization, Mode matching to the OMC cavity 
The fiber output was matched with the lenses on a small bread board.
The detailed configuration is found in the following elog link.
http://nodus.ligo.caltech.edu:8080/OMC_Lab/105
Entry  Thu Apr 4 01:43:06 2013, Koji, Optics, Characterization, Mirror T measurement 
[Zach, Koji]
The measurement setup for the transmission measurement has been made at the output of the fiber.
- First, we looked at the fiber output with a PBS. It wasn't P-pol so we rotated the ourput coupler.
    Reply  Thu Apr 4 23:44:52 2013, Koji, Optics, Configuration, Beam launched into fiber 
We had to move our flipper mirror to share the beam between Peter's setup and ours as our flipper is at the place where the ISS PD array base is supposed
to be!
There was no place to insert the flipper in the setup. We (Peter and Koji) decided to move the laser back for ~2".
    Reply  Fri Apr 5 14:39:26 2013, Koji, Mechanics, Characterization, Calibration of the test PZTs after the heat cure shadow_sensor_calib_after_bake.pdfPZTresponse.pdf
We attached fused silica windows on the test PZTs. http://nodus.ligo.caltech.edu:8080/OMC_Lab/93
The glued assemblies were brought to Bob's bake lab for the heat cure. There they are exposed to 94degC heat for two hours (excluding ramp up/down
time).
    Reply  Mon Apr 8 11:11:37 2013, Koji, Optics, Characterization, More Mirror T measurement 
More Ts of the mirrors were measured.
A mirror specification:
Request: 8300+/-800 ppm
Entry  Mon Apr 8 11:29:08 2013, Koji, Optics, Characterization, Mirror/PZT Characterization links 

    Mirror List
    http://nodus.ligo.caltech.edu:8080/OMC_Lab/152
     
    Mirror T measurement:
Entry  Mon Apr 8 11:49:18 2013, Koji, Mechanics, Characterization, PZT actuator tested at LLO 
Test result of the PZTs by Valera and Ryan
PZT  Length Angle
 #   [nm/V] [urad/um]
 11  14.5   17.6
 12  13.8   17.8
 13  11.2   25.0
 14  14.5    6.6
 15  12.5   10.6


21  14.5    9.7
 22  13.8   28.8
 23  14.5    6.8  ==> Assembly #2
 24  18.5   51.7  ==> Used for prototyping
 25  17.1   13.8
Entry  Mon Apr 8 20:56:52 2013, Koji, Optics, Configuration, PZT & Curverd Mirror arrangement PZT_assembly.pdf
Assembly #1:
Mounting Prism #16
PZT #26
Entry  Mon Apr 8 21:11:14 2013, Koji, Optics, General, PZT assembly gluing 
[Jeff, Zach, Koji] 
PZT assembly gluing
Glue gun -> to be returned to MIT
Entry  Mon Apr 8 23:42:33 2013, Koji, Optics, Configuration, Fake OMC roughly aligned beam_profile.pdfmode_matching.pdf
Mode matching:
 
    Reply  Tue Apr 9 13:56:09 2013, Koji, Optics, General, PZT assembly post gluing / pre baking pictures 
 
Entry  Thu Apr 11 15:10:22 2013, Koji, General, General, OMC Progress 
[Zach, Jeff, Koji]

- Jeff configured the bottom side template to have a nominal value
obtained from the solid works model. Note that the thickness of the
Entry  Fri Apr 12 09:25:31 2013, Koji, Optics, Characterization, Alignment of the OMC (without glue) 
[Zach Koji]
The first attempt not to touch the curved mirrors did not work. (Not surprising)
The eigenmode is not found on the mirror surface.
Entry  Sat Apr 13 21:06:02 2013, Koji, Optics, General, OMC Bottom-side: cavity glued Cav_scan_response_130412_Pitch.pdfCav_scan_response_130412_Yaw.pdf
[Jeff, Zach, Lisa, Koji]
Gluing of the cavity mirrors went very well!!!
Preparation
Entry  Tue Apr 16 00:40:45 2013, Koji, Optics, General, PD/QPD path gluing ~ preparation 
[Jeff Koji]
- Placed the optics on the PD/QPD path
- Checked the alignment of the beam on the dummy PD/QPD mounts
    Reply  Tue Apr 16 08:12:14 2013, Koji, Optics, Characterization, Further More Mirror T measurement 
T&Rs of the B mirrors and some of the E mirrors are measured.
I found that these BSs have high loss (1%~3%) . As this loss will impact the performance of
the squeezer