Entry  Thu Jul 13 01:02:58 2023, Stephen, Optics, General, A+ OMC, Bonding of Curved Mirror Batch 1 16x
[2023.07.13 - Stephen, Camille, Thejas, Maria]

We bonded Curved Mirror assemblies today. Some notes about this log entry:


Thejas will post a log discussing matching.
This log hosts a subset of the photos posted to the A+
Entry  Thu Aug 3 15:04:26 2023, Stephen, General, General, aLIGO Unit 4 Build, Cable Routing, Preparation cable_routing_20230803_IMG_3527.jpg
[Dean, Stephen]

Unit #4 aLIGO OMC unit was transported to the 40m Bake Lab.

We unwrapped the Transport Fixture and identified the orientation which would place the Light Side up and accessible. We removed the 4 long SHCS
Entry  Mon Jul 2 15:27:31 2018, Rich Abbott, Electronics, General, Work on EOM (3rd IFO unit) EOM3_aLIGO_3rdIfo.JPG
Koji, Rich

We took apart the unit removed from the 3rd IFO (Unit serial number aLIGO #3, XTAL 10252004) to see what makes it tick.  Koji has done a
fine job of adding the plots of the impedance data to this log book.  Attached are some details of the physical construction showing the capacitor
Entry  Tue Jul 3 12:07:47 2018, Rich Abbott, Electronics, Characterization, Notes on 3rd IFO EOM EOM_Analysis2.pdf
Attached please see my notes summarizing the models for the electrodes and inductors within the 3rd IFO EOM
Entry  Wed Aug 8 17:32:56 2018, Rich Abbott, General, Characterization, Modulation Index Test Setup at 40m Lab 40mLabModIndexSetup.pdf
Attached is a block diagram of the test setup used in the 40m lab to measure the modulation index of the IO modulator
Entry  Mon Apr 15 21:11:49 2019, Philip, Optics, Characterization, OMC(004): PZT testing for spare OMC 
[Koji, Philip]

Today we tested the functionality of the four remaining PZTs (11,12,13 and 22) .  Each PZT was placed within a collimated 500um beam.
Roughly half of the beam was blocked by the PZT. The PZT and a PD then acted as shadow sensor. Each PZT was tested with 0 and
Entry  Wed Apr 17 10:30:37 2019, Philip, Optics, General, OMC optical set-up day 1 
[Joe, Koji, Liyuan, Philip, Stephen]
Work done on 16.04.2019
Entry  Fri Apr 19 09:21:07 2019, Philip, Optics, , Cleaning of OMC optics IMG_7877.JPGIMG_7883.JPGIMG_7884.JPG
ach[Joe, Phillip, Koji, Stephen]

Work from 17.04.2019

First contact cleaning of OMC optics
Entry  Tue Apr 18 07:59:46 2023, Madeline Lesovsky, General, General, Test Cure Bake - Curved Mirror Subassembly Bonding 6x
This is a test bake conducted in Air Bake Oven A (ABO-A) held in the 40m Clean and Bake facility. The overall objective is to sucessfully cure the Curved
Mirror Subassemblies with the appropriate temperature profile. In this test run, we wanted to ensure that the temperature profile dictated via the Platinum
software is stable and repeatable.
Entry  Wed Jul 26 15:01:26 2023, Madeline Lesovsky, Optics, General, Subassembly Bonding Effort - Oven Bake Profile Results OMC_Bonding_12_07_2023_Rampup.PNGOMC_Bonding_12_07_2023_Soak.PNGOMC_Bonding_12_07_2023_Rampdown.PNGOMC_Bonding_12_07_2023_Truncated.xlsx
The bonding efforts were conducted on Thursday, July 13, 2023 (https://nodus.ligo.caltech.edu:8081/OMC_Lab/561)

The duration of the air bake in ABO A was recorded and results can be found in the graphs below. The raw data can be found in the .xlsx file.

Post-bake log (https://nodus.ligo.caltech.edu:8081/OMC_Lab/563) for reference.
    Reply  Tue Mar 14 12:12:41 2023, Koji , Optics, Characterization, A+ OMC curved mirror characterization 
RoC: 2.65m ! Interesting. I'll wait for the follow-up analysis/measurements. The RoC may be dependent on the area (diameter) for the fitting. You
might want to run the fitting of your own. If so, let me know. I have some Matlab code that is compatible with the CSV file exported from MetroPro data.
    Reply  Tue Mar 14 20:06:03 2023, Koji , Optics, Characterization, A+ OMC Curved mirror radius of curvature 
If the mirror has the RoC, it works as a lens. And you should be able to see the effect in the beam profile.

Just what you need to do is to compare the beam profile without the mirror (or with a flat mirror) and then with the curved mirror.

 
    Reply  Wed Mar 15 17:07:35 2023, Koji , Optics, Characterization, A+ OMC Curved mirror radius of curvature 
I hope you can find useful lenses from the lens kit in the cabinet. If you need more lenses and mounts, talk to our students in WB and the 40m.
    Reply  Fri Mar 17 15:01:21 2023, Koji , Optics, Characterization, A+ OMC Curved mirror radius of curvature 
Thanks Koji, the lenses available in the cabinet in the lab actually sufficed. 




Quote:



I hope you can find useful
    Reply  Mon Jul 10 20:29:05 2023, Koji , General, Characterization, OMC(004) PZT characterization PZT_Scan.pdfPZT_response.pdfOMC_OL_CLTF.pdf
Belated entry: OMC(004) PZT Slow scan / freq response measurements (May 10/11/17, 2023)

PZT DC scan measurement showed that CM1 had a significantly larger response than the usual PZT responses, and CM2 has the one significantly less.
The measurements were repeated and the same result was confirmed.
    Reply  Fri Jul 21 03:29:30 2023, Koji , Optics, General, A+ OMC optic bench beam layout  
Nice measurement. This result suggests that the fiber mode is supposed to be matched to the OMC cavity by 99.8% at z0=0.358 m. Note that the OMCmode
has a waist radius of 0.4896 mm and 0.4905 mm for the horizontal and vertical modes, respectively.

In reality, the fiber mode contains higher-order HG modes. Therefore the actual mode matching will be limited to ~98%.
Entry  Fri Jun 15 15:45:49 2012, Koji, General, General, OMC Plan 
LIGO Document G1200683-v1: 
aLIGO OMC fabrication and testing plan
aLIGO OMC wiki
Entry  Sat Jun 16 08:53:09 2012, Koji, General, General, To Do List 
Facility

    Work
    
        Replacing wooden work benches
        
    
       W60" x H28-34" x D30" 
Entry  Wed Jun 20 00:10:53 2012, Koji, Facility, General, Hole on the wall was patched P6191706.jpg
 
Entry  Sat Jul 14 02:16:07 2012, Koji, General, General, Plan Update: July P7071878.jpg
Facility/Supplies

    Work in progress     
    
        Floor cleaning
        Plug slits on the roof of the HEPA booth - blanking panels have been ordered 
Entry  Wed Jul 18 23:20:13 2012, Koji, Optics, Characterization, Mode scan results of ELIGO 
Nic Smith sent me a bunch of elog lists where the results of the mode scan can be found.
From Nic:
There have been many mode scan analyses done at LLO:
Entry  Mon Jul 23 17:15:14 2012, Koji, Clean, General, Talking with Margot 
I consulted with Margot about the cleaning of the optics

    Optics are considered as a clean object. Large dusts can be removed by ionized N2 flow etc.
    Barrel of optics can be wiped
with Acetone.
    Optical surfaces are best to be cleaned by First Contact.
    A peek
Entry  Tue Jul 24 11:41:29 2012, Koji, General, General, Useful references 
Nicolas Smith,
LIGO Document T0900383-v1 
3mm Photodiode Characterization for Enhanced LIGO
Entry  Tue Jul 31 21:29:43 2012, Koji, General, General, Work completed in July [!] 

    Completed Work: Facility/Supplies
    
        Plug a big hole on the wall [ELOG]
        Purchasing work benches
Entry  Tue Jul 31 21:33:17 2012, Koji, General, General, Plan Update: August [!] 
Completed work of the previous months: [Jul] [Aug] [Sep] [Oct] [Nov] [Dec]

Facility/Supplies

    Work done
    
        Floor
Entry  Wed Aug 1 19:35:00 2012, Koji, Facility, General, Floor cleaned / Workbench being built / Table top defect P8011949.JPGP8011947.JPGP8011948.JPG
- The floor of the room was cleaned and waxed!
- Sticky mats are placed! Now we require shoe covers!
Entry  Sat Aug 11 00:59:14 2012, Koji, Facility, General, Laser Safety Barrier P8131960.JPG
It seemed that a laser safety barrier was installed today!?
Entry  Mon Aug 13 16:59:11 2012, Koji, Clean, General, Room Cleaning Log 
Floor wiped with a wet wiper (Aug 13, 2012)
Floor wiped with a wet wiper (Aug 15, 2012)
Floor wiped with a wet wiper (Sep 25, 2012)
Entry  Mon Aug 13 17:01:35 2012, Koji, Clean, General, Particle Counts 
Aug 13, 2012 / 0.5um 1000~2000/(0.1 cu ft) / 0.7um   400-600/(0.1 cu ft) by ATF particle counter (MET ONE 227A)
They are counts/(0.1 ft^3)! These numbers should be multiplied by 10 to know the particle "CLASS".
Entry  Tue Aug 14 03:29:06 2012, Koji, Supply, General, Clean supply rack P8131959.JPGP8131961.JPG
Clean supplies & some cleaning tools are located at the right side of the entrance.
The file cabinet there was moved to the left side of the door, but will be removed eventually.
Entry  Wed Aug 22 20:16:43 2012, Koji, Facility, General, Workbenches have been installed / Clean room stools P8171968.jpgP8171969.jpg
Last Friday, new workbenches were installed. Vladimir got a new table and a cleanroom stool.
Entry  Tue Sep 25 14:18:14 2012, Koji, Clean, General, Particle Counts 
Particle counts
Before the prefilter is installed: 0.5um 1191cnts, 0.7um 346cnts
2:20 prefilter installed
    Reply  Mon Oct 1 16:06:55 2012, Koji, Clean, General, Particle Counts 
1. It turned out that the particle counter MET ONE 227A at ATF shows 
(particle count)/(0.1 ft^3) 
Entry  Fri Oct 5 03:39:58 2012, Koji, Optics, General, RoC Test setup RoC_test_setup.pdfRoC_test_setup.png
Based on Zach's experiment design, I wrote up a bit more detailed optical layout for the mirror test.
Entry  Mon Oct 8 11:30:47 2012, Koji, Optics, General, EG&G 2mm photodiode angle response 
EGE&G 2mm photodiode angle response measured by Sam T1100564-v1
Entry  Tue Oct 9 04:59:24 2012, Koji, Optics, General, OMC Test Optical Setup OMC_test_setup.pngOMC_test_setup.pdf

 
Entry  Tue Oct 9 05:03:15 2012, Koji, Electronics, General, OMC Test Electronics Setup electronics_setup.pngelectronics_setup.pdf
 
Entry  Fri Oct 12 17:15:19 2012, Koji, Optics, General, Loan from the 40m / ATF 

    HWP set
         
    
        Optics: CVI QWPO-1064-08-2-R10

       Mount: New Focus #9401
        
Entry  Tue Oct 16 15:50:09 2012, Koji, General, General, Work completed in August/September [!] 

    Work done
    
        Floor cleaning
[ELOG]
        Placing sticky
mats [ELOG]
        Label Maker
Entry  Tue Oct 16 15:51:01 2012, Koji, General, General, Plan Update: October [!] 
Completed work of the previous months: [Jul] [Aug]
[Sep] [Oct] [Nov] [Dec]

Facility/Supplies
Entry  Wed Oct 17 20:36:04 2012, Koji, Optics, General, RoC test cavity locked detailed_RoC_setup.pdfomc_cav_lock_SCRN_SHOT.pngCav_scan_response_20121016.pdf
The RoC test setup has been built on the optical table at ATF.

The cavity formed by actual OMC mirrors have been locked.
Entry  Thu Oct 18 20:23:33 2012, Koji, Optics, Characterization, Improved measurement Cav_scan_response_zoom_20121017.pdfdetailed_RoC_setup.pdf
Significant improvement has been achieved in the RoC measurement.

    The trans PD has much more power as the BS at the cavity trans was replaced by a 50% BS. This covers the disadvantage of using the a
Si PD.
    The BB EOM has a 50Ohm terminator to ensure the 50Ohm termination at Low freq.
    The length of the cavity was changed
Entry  Wed Nov 7 01:28:20 2012, Koji, Optics, Characterization, Wedge angle test (A1) wedge_measurement.pngwedge_measurement_setup.png
Wedge angle test
Result: Wedge angle of Prism A1: 0.497 deg +/- 0.004 deg

 
Entry  Wed Nov 7 20:21:42 2012, Koji, General, General, Work completed in October [!] 
Completed work of the previous months: [Jul] [Aug]
[Sep] [Oct] [Nov]
[Dec]
Entry  Wed Nov 7 20:44:11 2012, Koji, General, General, Plan Update: November [!] OMC_Project_Schedule.pdf
Completed work of the previous months: [Jul] [Aug]
[Sep] [Oct] [Nov]
[Dec]
Entry  Thu Nov 8 13:24:53 2012, Koji, Optics, Characterization, More wedge measurement wedge_measurement_overall.pdf
A1
Horiz Wedge    0.497    +/-    0.004 deg
Vert Wedge      0.024    +/-    0.004 deg
Entry  Thu Nov 8 19:47:55 2012, Koji, Electronics, Configuration, Solder for PZTs 
Rich saids:
I have ordered a small roll of solder for the OMC piezos. 
Entry  Thu Nov 8 19:52:57 2012, Koji, Optics, General, How to apply UV epoxy UVepoxy.jpg
KA's question:
Do you know how to apply this epoxy? 
Do we need a plunger and a needle for this purpose?
Entry  Thu Nov 8 20:12:10 2012, Koji, Optics, Configuration, How many glass components we need for a plate 
Optical prisms 50pcs (A14+B12+C6+E18)
Curved Mirrors 25pcs (C13+D12)

    
        
             
Entry  Fri Nov 9 00:43:32 2012, Koji, Optics, Characterization, Further more wedge measurement wedge_measurement_overall.pdf121108a_A1.pdf
Now it's enough for the first OMC (or even second one too).
Today's measurements all distributed in theta>0.5deg. Is this some systematic effect???
I should check some of the compeled mirrors again to see the reproducibility...