Thu Jan 26 23:46:13 2023, Koji, Optics, General, OMC #1 input beam dump bonding 
|
Thu Jan 26 23:16:35 2023, Koji, Optics, Configuration, OMC #4: Top side bonding.    
|
Thu Jan 26 23:07:14 2023, Koji, Optics, General, OMC #4: Input beam dump bonding
|
Wed Jan 25 23:51:04 2023, Koji, General, General, The items packed for Downs
|
Mon Dec 19 18:51:50 2022, Koji, Optics, Characterization, TMS measurement with the PZT voltages altered    
| +
Mon Dec 12 19:04:40 2022, Koji, Optics, Characterization, FSR/TMS/Spot Positions/Transmission 2nd trial    
|
Mon Dec 5 20:09:39 2022, Koji, Optics, General, (re)starting the OMC #4 build
| +
Fri Dec 2 23:58:33 2022, Koji, Optics, Characterization, OMC #1 cleaning for water soluble contaminants 
| +
Tue Nov 29 15:54:47 2022, Koji, General, Configuration, Windows laptop for WincamD Beam'R2 recovery
| +
Mon Nov 21 19:13:35 2022, Koji, General, General, Transmission measurement (2nd deep cleaning of OMC #1) 
|
Thu Nov 17 19:50:00 2022, Koji, Optics, Characterization, Conclusion on the cleaning of OMC #001
|
Thu Nov 17 18:56:22 2022, Koji, Optics, General, Transmission measurements of OMC #1 after deep cleaning 
| +
Mon Nov 14 09:27:13 2022, Koji, Optics, Characterization, transmission measurements through OMC #1 (before cleaning)
|
Fri Nov 11 19:07:48 2022, Koji, Supply, General, Supply Order
| +
Mon Nov 7 22:00:33 2022, Koji, Optics, Configuration, Setting up the fiber couplers
|
Mon Sep 26 14:27:49 2022, Koji, General, General, LLO OMC ICS work
|
Tue Sep 20 08:54:33 2022, Koji, General, General, PD cage arrangement
| +
Fri Aug 26 22:29:02 2022, Koji, General, General, Tool Shipping Prep  
| +
Tue Jul 26 00:01:59 2022, Koji, General, General, OMC #002 delamination check 2  
|
Mon Jul 25 18:25:04 2022, Koji, General, General, A/C Filter was replaced
| +
Fri Jul 22 17:41:01 2022, Koji, General, General, SRS LCR meter SRS720 returned to Downs
|
Tue Jun 28 16:13:34 2022, Koji, General, General, The small optical table not small enough to get out
|
Thu Jun 23 21:03:33 2022, Koji, Facility, General, Moving the small optical table to CAML (TCS Lab)
| +
Wed Jul 7 14:21:50 2021, Stephen, Supply, General, OMC Unit 4 Build Machined Parts 
| +
Tue Nov 24 12:27:18 2020, Koji, Electronics, Characterization, The dark noise of the Q3000 QPDs
|
Fri Nov 20 18:51:23 2020, Koji, General, General, Instrument loan
|
Fri Nov 6 18:38:00 2020, Koji, General, General, Powermeter lent from OMC Lab to 2um ECDL
|
Fri Oct 23 19:09:54 2020, Koji, General, General, Particle counter transfered to Radhika
| +
Fri Oct 16 00:53:29 2020, Koji, General, General, TFT Monitor mounting
|
Thu Oct 8 19:55:22 2020, Koji, General, Characterization, Power Measurement of Mephisto 800NE 1166A
| +
Mon Sep 28 16:13:08 2020, Koji, General, General, OMC Beam Dump Production Cure Bake
|
Mon Aug 10 15:53:46 2020, Koji, General, General, Lab status check
|
Mon Aug 10 15:34:04 2020, Koji, Facility, Loan / Lending, Glue bake oven
| +
Mon Aug 10 15:29:54 2020, Koji, General, General, Item lending
|
Fri Dec 6 00:55:25 2019, Koji, Optics, General, Beamdump gluing 6x
|
Tue Oct 22 15:54:59 2019, Koji, Electronics, Loan / Lending, Borrowed LB1005 from Cryo Cav
|
Tue Oct 22 11:56:09 2019, Stephen, Supply, General, Epoxy Status update as of 22 October 2019
|
Tue Oct 22 11:52:53 2019, Stephen, General, General, Epoxy Curing Timeline of OMC PZT Assy #9 and #10 
|
Tue Oct 22 10:25:01 2019, Stephen, General, General, OMC PZT Assy #9 and #10 Production Cure Bake 
| +
Mon Sep 30 23:16:53 2019, Koji, Optics, General, OMC(004): PZT sub-assembly gluing (#9/#10)   
|
Thu Sep 26 17:33:52 2019, Stephen, General, General, Dirty ABO test run prior to PZT Subassembly Bonding - ABO is Ready!
|
Tue Sep 24 12:19:20 2019, Stephen, General, General, Dirty ABO test run prior to PZT Subassembly Bonding
|
Wed Sep 18 23:38:52 2019, Stephen, General, General, Dirty ABO ready for PZT Subassembly Bonding
|
Wed Sep 18 23:16:06 2019, Stephen, Supply, General, Items staged at 40m Bake Lab for PZT Subassembly Bonding 
|
Wed Sep 18 22:30:11 2019, Stephen, Supply, General, EP30-2 Location and Status
|
Thu Sep 5 15:40:42 2019, shruti, Optics, Configuration, PZT Sub-Assembly  
| +
Thu Aug 29 11:51:49 2019, shruti, Optics, Characterization, Wedging of the debonded PZTs - Calculation 
|
Fri Aug 23 11:11:44 2019, shruti, Optics, Characterization, Finding the curvature bottom 
|
Mon Jul 1 12:49:42 2019, Koji, Optics, Characterization, Scattering measurement of A and C mirrors 
|
Mon Jul 1 12:38:49 2019, Koji, Optics, Characterization, A and M prisms perpendicularity measurement 6x
|
|