40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
OMC elog, Page 2 of 7
Not logged in
List
|
Find
|
Login
|
Help
Full
|
Summary
| Threaded | Collapse |
Expand
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
General
Facility
Clean
Supply
Mechanics
Optics
Electronics
303 Entries
Goto page
Previous
1
, 2,
3
...
5
,
6
,
7
Next
Tue Apr 16 23:11:43 2019, Koji, General, General, Borrowed items from the other labs
+
Tue Apr 16 21:16:11 2019, Koji, Optics, Characterization, OMC(004): PZT testing for spare OMC
Tue Apr 16 17:24:56 2019, Koji, Optics, Configuration, OMC(004): E Mirror selection
Tue Apr 16 16:52:36 2019, Koji, Optics, Configuration, OMC(004): B Mirror selection
Tue Apr 16 16:40:26 2019, Koji, General, Configuration, OMC(004): A Mirror selection
Tue Apr 16 16:35:09 2019, Koji, Optics, Configuration, OMC(004): Glass breadboard selection
+
Mon Apr 15 01:23:45 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #10)
Thu Apr 11 21:22:58 2019, Koji, General, General, OMC(004): PZT sub-assembly air baking
Thu Apr 11 21:22:26 2019, Koji, Mechanics, General, OMC(004): PZT sub-assembly gluing
Thu Apr 11 12:15:31 2019, Koji, Mechanics, Configuration, PZT sub assy mirror orientations
+
Thu Apr 11 10:54:38 2019, Stephen, General, General, OMC(004): preparation for the PZT subassembly bonding
Fri Apr 5 23:30:20 2019, Koji, General, General, OMC (002) repair completed
Fri Apr 5 20:50:54 2019, Koji, Optics, Characterization, OMC(002): QPD alignment
Fri Apr 5 01:08:17 2019, Koji, Optics, Characterization, OMC(002): DCPD / QPD alignment
Fri Apr 5 01:07:18 2019, Koji, Optics, Characterization, OMC(002): transmitted beam images
Thu Apr 4 20:07:39 2019, Koji, Supply, General, Purchase
Thu Mar 28 16:36:52 2019, Koji, Mechanics, Characterization, OMC(002) PZT characterization
Tue Mar 19 17:30:25 2019, Koji, General, Characterization, OMC (002) Test items
Sat Feb 2 20:35:02 2019, Koji, Optics, Characterization, Summary: OMC(002) HOM structure recalculation (after mirror replacement)
Sat Feb 2 20:28:21 2019, Koji, Optics, Characterization, Summary: OMC(003) HOM structure recalculation
Sat Feb 2 20:03:19 2019, Koji, Optics, Characterization, Summary: OMC(002) HOM structure recalculation (before mirror replacement)
Sat Feb 2 16:17:13 2019, Koji, Optics, Characterization, Summary: OMC(001) HOM structure recalculation
Fri Feb 1 12:52:12 2019, Koji, Mechanics, General, PZT deformation simulation
Sat Jan 12 22:49:11 2019, Koji, Optics, Characterization, PM-SM patch cable mode cleaning effect
Thu Jan 10 20:45:00 2019, Koji, Optics, Characterization, PZT test cable
Thu Jan 10 20:42:54 2019, Koji, Optics, Characterization, FSR / HOM Test of OMC SN002
+
Thu Nov 1 19:57:32 2018, Aaron, Optics, General, Montecarlo simulation of the phase difference between P and S pols for a modeled HR mirror
Wed Aug 29 11:06:30 2018, Koji, General, General, RF AM RIN and dBc conversion
+
Thu Aug 9 11:24:29 2018, Koji, General, Characterization, Modulation Index Test Setup at 40m Lab
Tue Aug 7 15:43:12 2018, Koji, Electronics, Characterization, New LLO EOM stuffed
Thu Jul 26 20:57:07 2018, Koji, Electronics, Characterization, 9MHz port tuned impedance
+
Wed Jul 4 18:30:51 2018, Koji, Electronics, Characterization, EOM circuit models
Tue Jul 3 12:07:47 2018, Rich Abbott, Electronics, Characterization, Notes on 3rd IFO EOM
Mon Jul 2 15:27:31 2018, Rich Abbott, Electronics, General, Work on EOM (3rd IFO unit)
Mon Jul 2 12:29:01 2018, Koji, Electronics, Characterization, Impedances of individual components (3IFO EOM)
Wed May 30 17:44:23 2018, Koji, Optics, Characterization, 3IFO EOM surface check
Wed May 30 16:40:38 2018, Koji, Mechanics, Characterization, EOM mount stability test
Tue May 15 19:53:45 2018, Koji, Optics, General, EOM Q comparison
Sat May 5 22:51:04 2018, Koji, Optics, General, 3IFO EOM Optical test
Thu May 3 21:45:58 2018, awade, General, Loan / Lending, Borrowed toaster oven
+
Mon Apr 2 17:27:04 2018, Koji, Optics, Characterization, aLIGO EOM test
Thu Nov 30 12:18:41 2017, Stephen, General, General, Preparation for Modal Testing on 4 December
Mon Nov 27 20:24:24 2017, Koji, General, General, A former LHO PD (Trans) removed from the OMC #002 for the shipment to Stockholm
6x
Fri Sep 8 15:14:05 2017, Koji, Facility, General, Preparation for the plumbing work
7x
+
Sat Jul 29 21:42:51 2017, Koji, Electronics, Characterization, PDH amp
Wed Jul 5 16:59:44 2017, Koji, General, General, The OMC #002 was packed
Sat Jul 1 21:33:18 2017, Koji, General, General, Some purchase notes
Sat Jul 1 15:29:57 2017, Koji, Optics, General, Black glass cleaning / Final bonding for the emergency repair for OMC #002
Fri Jun 23 10:55:07 2017, Koji, Optics, General, Dust layer on black glass beam dumps?
Fri Jun 23 01:58:11 2017, Koji, Optics, General, OMC #002 Repair - CM1 gluing
6x
Goto page
Previous
1
, 2,
3
...
5
,
6
,
7
Next
ELOG V3.1.3-