  576   Mon Jul 24 17:43:25 2023 KojiOpticsGeneralA+ OMC Unit 1 Cavity BuildThanks Koji




  
  575   Mon Jul 24 17:39:06 2023 ThejasOpticsGeneralA+ OMC Unit 1 Cavity Build7/24/23

The cavity input was re-adjusted
to make sure the beam was parallel to the
  
  574   Mon Jul 24 16:12:14 2023 KojiOpticsGeneralA+ OMC Unit 1 Cavity BuildIt is ~1mm from the zero of the micrometer
readings. See attached photos from the 1st
OMC build.
 IMG_1329.JPGIMG_1339.JPGIMG_1342.JPG 
  573   Fri Jul 21 13:42:10 2023 ThejasOpticsGeneralA+ OMC Unit 1 Cavity Build7/21/23

Fringes were observed at the optic-breadboard interface.
This was eliminated by cleaning the interface
 image.jpegimage.jpegimage.jpeg 
  572   Fri Jul 21 03:29:30 2023 Koji OpticsGeneralA+ OMC optic bench beam layout Nice measurement. This result suggests
that the fiber mode is supposed to be matched
to the OMC cavity by 99.8% at z0=0.358 m.
  
  571   Fri Jul 21 00:23:35 2023 Thejas OpticsGeneralA+ PZT subassembly glue sheetsBelow are the gluesheets for the first
four PZT subassembly bonding.
 subass#1.pdfsubass#3.pdfsubass#4.pdfsubass#2.pdf 
  570   Fri Jul 21 00:07:03 2023 Thejas OpticsGeneral [Camille, Thejas, Stephen]

Effort was made to coarsely align
the laser beam into the caivty
 IMG_0230.jpg 
  569   Thu Jul 20 14:28:53 2023 Thejas OpticsGeneralA+ OMC optic bench beam layout Beam profile of the input beam was measured
at it's beam waist, this is to ensure
the input beam waist matches the cavity
 IMG_0228.jpgprofile.pdf 
  568   Thu Jul 20 14:14:49 2023 Thejas OpticsGeneralA+ OMC bonding template alignment We aligned the bonding template onto the
glass braedboard. This was done with the
help of a vernier caliper and adjusting teh
 IMG_5151.jpgTemplatePosition.jpgimage.jpeg 
  567   Wed Jul 19 14:26:17 2023 KojiOpticsGeneralA+ PZT sub-assemblies Pens like Sharpie are not recommended to
be used for CLASS B parts.
  
  566   Wed Jul 19 11:00:56 2023 Thejas OpticsGeneralA+ OMC Bonding [Camille, Thejas]

The A+ OMC transport fixture
and optic breadboard was transported to the
  
  564   Wed Jul 19 08:38:07 2023 Camille MakaremElectronicsCharacterizationPZT Reliability Test Results (part 2 of 2)Results for PZT reliability test:
Batch 3: SN31, SN32, SN35, SN40, SN45
 Thermal_31-32-35.PNGThermal_40-45.PNGTemps_31-32-35_40-45.PNGDriveVoltage_31-32-35-40-45.PNGPXL_20230713_183834301.jpg 
  563   Tue Jul 18 17:34:45 2023 ThejasOpticsGeneralA+ PZT sub-assemblies [Camille, Thejas]

Post sub-assembly bonding of CM
: Madeline will post a separate update on
 image.jpegimage.jpegimage.jpegimage.jpegimage.jpeg 
  562   Mon Jul 17 10:15:56 2023 Camille MakaremElectronicsCharacterizationPZT Reliability Test Results (part 1 of 2)[Camille, Thejas, Stephen]

Results for PZT reliability tests:

Batch 1: SN37, SN38, SN39, SN44
 10x 
  561   Thu Jul 13 01:02:58 2023 StephenOpticsGeneralA+ OMC, Bonding of Curved Mirror Batch 1[2023.07.13 - Stephen, Camille, Thejas,
Maria]

We bonded Curved Mirror assemblies
 16x 
  560   Thu Jul 13 00:38:47 2023 StephenOpticsCharacterizationA+ OMC, PZT DC Response and Length to Angle before Curved Mirror Assy Batch 1[2023.07.13]

The attached table includes the
characterization values used to inform the
 before_bonding_batch_1_20230711.pngmanual_outputs_from_20230711.xlsx 
  559   Wed Jul 12 17:27:44 2023 KojiGeneralGeneralMitsutoyo Digital Caliper (100mm)We had missing digital caliper from the
clean room. As it is an essential component,
I have ordered a replacement.
  
  558   Mon Jul 10 20:52:19 2023 KojiOpticsCharacterizationOMC (004) TMS measurementBelated entry: OMC(004) TMS measurement
with the PZT voltages scanned (Jun 12/15,
2023)
 HOM_plot_PZT0_0.pdfOMC_20230612.pdfHOM_PZTV_PZT1_0V.pdf 
  557   Mon Jul 10 20:29:05 2023 Koji GeneralCharacterizationOMC(004) PZT characterizationBelated entry: OMC(004) PZT Slow
scan / freq response measurements (May 10/11/17,
2023)
 PZT_Scan.pdfPZT_response.pdfOMC_OL_CLTF.pdf 
  556   Mon Jul 10 20:23:47 2023 KojiOpticsCharacterizationOMC (004) Spot positionsBelated entry: OMC(004) Spot positions
(Jun 15, 2023)

Photographs of the spot positions
 10x 
  555   Mon Jul 10 16:15:06 2023 KojiOpticsCharacterizationOMC(004) FSR / FinesseBelated entry: OMC(004) FSR / Finesse
measurement (Jun 13th, 2023)

RFAM Injection (Attachment
 FSR_Scan_FitFSR1MAMINJ_15-06-2023_180555.pdffinesse_measurements_log.pdf 
  554   Mon Jul 10 16:09:35 2023 KojiOpticsCharacterizationOMC(004) FSR / FinesseBelated entry: OMC(004) FSR / Finesse
measurement (May 3rd, 2023)

1) FSR measurement with
 FSR_Scan_FitFSR_TF_03-05-2023_160833.pdfFSR_Scan_FitFSRAMINJ3_TF_03-05-2023_173039.pdf 
  553   Thu Jul 6 10:19:23 2023 Thejas GeneralCharacterizationOMC Lab optic table [Camille, Thejas]

The optics table in OMC lab was
cleaned up, cameras and photodiodes used
  
  552   Fri Jun 30 10:55:45 2023 Camille MakaremElectronicsCharacterizationSummary of PZT reliability test procedure[Camille, Thejas, Stephen]

To test the reliability of the
PZTs, they were driven for 10^7 cycles. (At
  
  551   Fri Jun 30 10:30:57 2023 Camille MakaremElectronics Summary of DC response measurements[Camille, Thejas, Stephen]

The DC response of the PZT was
measured using the following setup (pictures
 PXL_20230627_164124373_crop.MP.jpgPXL_20230627_164108461_crop.jpg 
  550   Sun Jun 25 21:08:37 2023 KojiGeneralCharacterizationOMC (004) transported to Downs for cable furnishingOMC (004) + the transport fixture was transported
to Downs 227 with the boxes for OMC cabling
hardware and DCPD/QPD connector parts.
 PXL_20230624_073552303.jpgPXL_20230624_073531044.jpg 
  549   Sun Jun 25 21:04:35 2023 KojiGeneralCharacterizationOptical assembly/testing of OMC (004) completedOptical assembly/testing of OMC
(004) completed
- OMC (004) with the transport fixture
 PXL_20230624_072237980.jpgPXL_20230624_072254264.jpgPXL_20230624_072304754.jpgPXL_20230624_072320422.jpg 
  548   Wed Jun 21 02:07:24 2023 KojiElectronicsConfigurationOMC(004) QPD adjustmentQPD#             
QPD1      
QPD2
  
  547   Thu Jun 15 13:13:57 2023 KojiElectronicsConfigurationOMC (004) DCPD/QPD preparationWork
log for June 14, 2023


Selected QPDs from the
 PXL_20230615_001850494.jpg 
  546   Fri Jun 2 17:15:44 2023 StephenGeneralGeneralA+ OMC Build Progress, Weeks of 2023.05.22 and 2023.05.29A+ OMC Build efforts ongoing or completed
in the last two weeks:


 PZT lead onboard
  
  545   Fri Jun 2 13:28:09 2023 Camille MakaremElectronics PZT op-lev measurementsThe op-lev setup was modified slightly
(picture attached). The He-Ne laser was replaced
with one with a lower divergence angle. The
 PXL_20230602_224339446.jpgPXL_20230602_224359795.jpg 
  544   Tue May 23 16:30:09 2023 Thejas ElectronicsCharacterizationA+ OMC Piezos LA coupling Oplev setup was built: arm length about
2 m 

As the PZT 44 was actuated with
 drive.png 
  543   Fri May 19 16:09:31 2023 StephenGeneralGeneralA+ OMC Build Progress, Week of 2023.05.15A+ OMC Build efforts ongoing or completed
this week:


 PZT lead onboard
  
  542   Tue May 16 13:07:11 2023 StephenOpticsCharacterizationPZT DC Response with Shadow Sensor - DC Response Qualitative Results, Batch 112 May 2023, Downs 227

Stephen, Camille, Thejas

We completed a first batch of PZT
  
  541   Tue May 16 10:26:12 2023 KojiGeneralCharacterizationOMC (004): Final Testing
FSR measurement (dip) -
done May 3, 2023
FSR
measurement (RFAM injection) - done
  
  540   Mon May 15 14:24:41 2023 Thejas OpticsCharacterizationA+ OMC ROC Koji's mirror measurement result attached
herewith for comparison. 

 Screenshot_2023-05-15_at_14.24.02.png 
  539   Mon May 15 14:20:03 2023 Thejas OpticsCharacterizationA+ OMC ROC Herewith attached are the results
of curved mirror radius of curvature characterization. 

 
 21x 
  538   Fri May 12 10:00:06 2023 Camille MakaremGeneralLoan / LendingBorrowed Items for PZT DC Response Shadow Sensor SetupThe ThorLabs MDT694B piezo driver was returned
to the OMC lab.

 PXL_20230511_201545235.jpg 
  537   Thu May 11 10:46:17 2023 Thejas GeneralCharacterizationaLIGO OMC[Thejas, Camille, Koji]

We aligned the laser beam to the
cavity and drove the OMC cavity PZTs (0 to
  
  536   Fri May 5 18:37:31 2023 StephenOpticsCharacterizationPZT DC Response with Shadow Sensor - First measurement attempt[Thejas, Camille, Stephen]

In Downs 227 on 05 May 2023

We took the following actions:
 Shadow_Sensor_Stage_Calibration_plot_PD_smaller_beam_20230505.pngupdated_setup_smaller_beam_spectrum_analyzer_20230505.jpg 
  535   Thu May 4 15:12:14 2023 KojiGeneralCharacterizationOMC (004): Final Testing
FSR measurement (dip) -
done May 3, 2023
FSR
measurement (RFAM injection) - done
  
  534   Thu May 4 11:39:19 2023 StephenOpticsCharacterizationPZT DC Response with Shadow Sensor - First measurement attemptEfforts from Tuesday through Thursday Wednesday,
02 through 04 May, are described below.

The main outcomes were:
  
  533   Tue May 2 12:49:43 2023 StephenOpticsCharacterizationPZT DC Response with Shadow Sensor - First measurement attempt[Stephen, Camille, Thejas]

A running log of our efforts from
Monday 1 May. Data continues to be placed
  
  532   Mon May 1 13:30:40 2023 StephenOpticsCharacterizationPZT DC Response with Shadow Sensor - PD Calibration[Stephen, Camille, Thejas, with support
from Luis]

Calibration reattempted
 pd_pzt_dc_response_setup_image_20230426.jpgShadow_Sensor_Stage_Calibration_plot_PD_20230427.png 
  531   Fri Apr 28 14:24:03 2023 Thejas OpticsCharacterizationA+ OMC Matching [Thejas, Camille, Stephen] 

Here are some notes on how
I plan to approach matching of
  
  530   Fri Apr 28 13:25:40 2023 Thejas OpticsGeneralaLIGO OMC Unit-4[Camille, Koji, Thejas]

Yesterday, we cleaned the cavity
optics with first contact, aligned the input
 image.jpegPXL_20230428_010507088.png 
  529   Wed Apr 26 14:43:44 2023 StephenGeneralLoan / LendingBorrowed Items for PZT DC Response Shadow Sensor SetupBorrowed for PZT DC Response Shadow Sensor
Setup (see Attachment 1):


Thorlabs PDA100A Photodiode
 PXL_20230426_185227710.jpg 
  528   Wed Apr 26 13:23:00 2023 StephenOpticsCharacterizationPZT DC Response with Shadow Sensor - QPD Calibration[Stephen, Camille, Thejas, with support
from Marie, Dean, Luis]

We setup a shadow sensor! (Attachment
 qpd_dc_response_setup_image_20230425.jpgShadow_Sensor_Stage_Calibration_plot_20230426.png 
  527   Mon Apr 24 15:29:48 2023 Camille MakaremOptics summary of zygo setupsSummary of Zygo setups

Initial Zygo Setup:
Our initial Zygo setup consisted of
 6x 
  526   Wed Apr 19 14:28:08 2023 ThejasOpticsCharacterizationA+ OMC Curved mirror radius of curvatureRestimation of the parameters

Camille and I went back to the
lab to re-measure the beam profile follwoing
 ini_beam.pdf 