40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  OMC elog, Page 2 of 13  Not logged in ELOG logo
Entry  Thu Jul 26 20:57:07 2018, Koji, Electronics, Characterization, 9MHz port tuned impedance impedance_eom.pdfeom9.pdfeom_models_9MHz.pdf
Entry  Tue Aug 7 15:43:12 2018, Koji, Electronics, Characterization, New LLO EOM stuffed P_20180806_154457.jpgimpedance_eom.pdfimpedance_eom_zoom.pdf
Entry  Tue Oct 22 15:54:59 2019, Koji, Electronics, Loan / Lending, Borrowed LB1005 from Cryo Cav 
Entry  Sat Nov 21 13:58:30 2020, Koji, Electronics, Characterization, Dark Current Measurement for InGaAs QPDs Q3000_dark_current.pdf
    Reply  Sun Nov 22 13:49:12 2020, Koji, Electronics, Characterization, Impedance Measurement for InGaAs QPDs impedance_measurement.pdfP_20201121_183830.jpgimpedance_test.pdfQ3000_impedance_test.pdf
    Reply  Mon Nov 23 23:17:19 2020, Koji, Electronics, Characterization, The dark noise of the Q3000 QPDs Q3000_dark_noise_81.pdfQ3000_dark_noise_82.pdfQ3000_dark_noise_83.pdfQ3000_dark_noise_84.pdf
    Reply  Tue Nov 24 10:45:07 2020, gautam, Electronics, Characterization, The dark noise of the Q3000 QPDs 
    Reply  Tue Nov 24 12:27:18 2020, Koji, Electronics, Characterization, The dark noise of the Q3000 QPDs 
Entry  Sat Feb 4 03:30:02 2023, Koji, Electronics, General, OMC cables #4 arrived  PXL_20230202_210750100.jpg
    Reply  Wed Feb 15 16:00:46 2023, Stephen, Electronics, General, OMC cables #4 inspected cable_residue_OMC_Lab_493_20230215_145127.jpg
Entry  Fri Feb 17 17:41:57 2023, Thejas , Electronics, Characterization, A+ OMC Piezos wedge angle  OMC_6_(dragged).pdf
Entry  Tue May 23 16:30:09 2023, Thejas , Electronics, Characterization, A+ OMC Piezos LA coupling  drive.png
Entry  Fri Jun 2 13:28:09 2023, Camille Makarem, Electronics, , PZT op-lev measurements PXL_20230602_224339446.jpgPXL_20230602_224359795.jpg
Entry  Thu Jun 15 13:13:57 2023, Koji, Electronics, Configuration, OMC (004) DCPD/QPD preparation PXL_20230615_001850494.jpg
Entry  Wed Jun 21 02:07:24 2023, Koji, Electronics, Configuration, OMC(004) QPD adjustment 
Entry  Fri Jun 30 10:30:57 2023, Camille Makarem, Electronics, , Summary of DC response measurements PXL_20230627_164124373_crop.MP.jpgPXL_20230627_164108461_crop.jpg
Entry  Fri Jun 30 10:55:45 2023, Camille Makarem, Electronics, Characterization, Summary of PZT reliability test procedure 
Entry  Mon Jul 17 10:15:56 2023, Camille Makarem, Electronics, Characterization, PZT Reliability Test Results (part 1 of 2) 10x
Entry  Wed Jul 19 08:38:07 2023, Camille Makarem, Electronics, Characterization, PZT Reliability Test Results (part 2 of 2) Thermal_31-32-35.PNGThermal_40-45.PNGTemps_31-32-35_40-45.PNGDriveVoltage_31-32-35-40-45.PNGPXL_20230713_183834301.jpg
Entry  Thu Sep 14 14:26:51 2023, Camille Makarem, Electronics, Characterization, Remaining PZT tests 
Entry  Wed Jun 20 00:10:53 2012, Koji, Facility, General, Hole on the wall was patched P6191706.jpg
Entry  Wed Aug 1 19:35:00 2012, Koji, Facility, General, Floor cleaned / Workbench being built / Table top defect P8011949.JPGP8011947.JPGP8011948.JPG
Entry  Sat Aug 11 00:59:14 2012, Koji, Facility, General, Laser Safety Barrier P8131960.JPG
Entry  Wed Aug 22 20:16:43 2012, Koji, Facility, General, Workbenches have been installed / Clean room stools P8171968.jpgP8171969.jpg
Entry  Wed Dec 26 14:33:33 2012, Koji, Facility, General, Lase Interlock wired PC263073.jpgPC263074.jpgPC263075.jpg
Entry  Tue Jan 22 11:10:25 2013, Koji, Facility, General, Eyeware storage and hooks for the face shields are installed P1223116.JPG
Entry  Sat Mar 23 02:32:23 2013, Koji, Facility, General, N2 cylinder delivered P3233349.jpg
Entry  Fri Sep 8 15:14:05 2017, Koji, Facility, General, Preparation for the plumbing work 7x
Entry  Mon Aug 10 15:34:04 2020, Koji, Facility, Loan / Lending, Glue bake oven 
Entry  Thu Jun 23 21:03:33 2022, Koji, Facility, General, Moving the small optical table to CAML (TCS Lab) PXL_20220624_035628602.jpg
Entry  Sat Feb 4 03:22:46 2023, Koji, Facility, General, Ready for the HEPA enclosure expansion PXL_20230202_002014960.MP.jpgPXL_20230203_011618168.MP.jpgPXL_20230203_011633873.jpg
Entry  Mon Mar 6 12:25:08 2023, Koji, Facility, General, HEPA Enclosure improvement 20230306_081449.jpg20230306_081518.jpg
Entry  Wed Apr 5 22:09:30 2023, Koji, Facility, General, HEPA Enclosure extension 20230405_120322.jpg20230405_120308.jpg20230405_120033.jpg
Entry  Fri Aug 25 22:01:29 2023, Koji, Facility, General, LED Strip installation plan LED_Strip.pdf
    Reply  Tue Aug 29 16:54:46 2023, Koji, Facility, General, LED Strip installed PXL_20230829_232310007.jpgPXL_20230829_232345702.MP.jpgPXL_20230829_232317162.jpg
Entry  Fri Jun 15 15:45:49 2012, Koji, General, General, OMC Plan 
Entry  Sat Jun 16 08:53:09 2012, Koji, General, General, To Do List 
Entry  Sat Jul 14 02:16:07 2012, Koji, General, General, Plan Update: July P7071878.jpg
Entry  Tue Jul 24 11:41:29 2012, Koji, General, General, Useful references 
Entry  Tue Jul 31 21:29:43 2012, Koji, General, General, Work completed in July [!] 
Entry  Tue Jul 31 21:33:17 2012, Koji, General, General, Plan Update: August [!] 
Entry  Tue Oct 16 14:50:54 2012, jamie, jeff, General, General, OMC breadboard/plate measurement dimensions 
Entry  Tue Oct 16 15:50:09 2012, Koji, General, General, Work completed in August/September [!] 
Entry  Tue Oct 16 15:51:01 2012, Koji, General, General, Plan Update: October [!] 
Entry  Wed Nov 7 20:21:42 2012, Koji, General, General, Work completed in October [!] 
Entry  Wed Nov 7 20:44:11 2012, Koji, General, General, Plan Update: November [!] OMC_Project_Schedule.pdf
Entry  Mon Dec 31 01:45:04 2012, Koji, General, General, Work completed in Nov and Dec [!] 
Entry  Thu Feb 7 21:35:46 2013, Koji, General, General, Dmass's loan of LB1005 / A2&C2 sent to Fullerton / First Contact @40m P2053119.jpgP2053120.JPG
Entry  Thu Mar 14 22:18:23 2013, Koji, General, General, New loans for the diode test 
Entry  Mon Mar 25 02:04:05 2013, Koji, General, General, OMC building plan / procedure ~ WB18 
ELOG V3.1.3-