355
|
Thu Apr 25 15:05:19 2019 |
Joe | Optics | Characterization | Looking at PZT HOM spacing dependance and thinking about workflow | [koji, joe]
The template or glass breadboard
was wobbling, and we noticed that the caivty |
|
1
|
Fri Jun 15 15:45:49 2012 |
Koji | General | General | OMC Plan | LIGO Document G1200683-v1:
aLIGO OMC fabrication and testing |
|
2
|
Sat Jun 16 08:53:09 2012 |
Koji | General | General | To Do List | Facility
Work
|
|
3
|
Wed Jun 20 00:10:53 2012 |
Koji | Facility | General | Hole on the wall was patched | |
|
7
|
Sat Jul 14 02:16:07 2012 |
Koji | General | General | Plan Update: July | Facility/Supplies
Work in progress |
|
8
|
Wed Jul 18 23:20:13 2012 |
Koji | Optics | Characterization | Mode scan results of ELIGO | Nic Smith sent me a bunch of elog lists
where the results of the mode scan can be
found. |
|
10
|
Mon Jul 23 17:15:14 2012 |
Koji | Clean | General | Talking with Margot | I consulted with Margot about the cleaning
of the optics
Optics are considered |
|
11
|
Tue Jul 24 11:41:29 2012 |
Koji | General | General | Useful references | Nicolas Smith,
LIGO Document T0900383-v1
|
|
12
|
Tue Jul 31 21:29:43 2012 |
Koji | General | General | Work completed in July [!] |
Completed Work: Facility/Supplies
|
|
13
|
Tue Jul 31 21:33:17 2012 |
Koji | General | General | Plan Update: August [!] | Completed work of the previous months:
[Jul]
[Aug] [Sep] [Oct] [Nov] [Dec] |
|
14
|
Wed Aug 1 19:35:00 2012 |
Koji | Facility | General | Floor cleaned / Workbench being built / Table top defect | -
The floor of the room was cleaned and waxed!
- |
  |
15
|
Sat Aug 11 00:59:14 2012 |
Koji | Facility | General | Laser Safety Barrier | It seemed that a laser safety barrier was
installed today!?
|
|
16
|
Mon Aug 13 16:59:11 2012 |
Koji | Clean | General | Room Cleaning Log | Floor wiped with a wet wiper (Aug 13, 2012)
Floor wiped with a wet wiper (Aug
15, 2012) |
|
17
|
Mon Aug 13 17:01:35 2012 |
Koji | Clean | General | Particle Counts | Aug 13, 2012 / 0.5um 1000~2000/(0.1 cu
ft) / 0.7um 400-600/(0.1 cu ft)
by ATF particle counter (MET ONE 227A) |
|
18
|
Tue Aug 14 03:29:06 2012 |
Koji | Supply | General | Clean supply rack | Clean supplies & some cleaning tools
are located at the right side of the entrance.
The file cabinet there was moved to |
 |
19
|
Wed Aug 22 20:16:43 2012 |
Koji | Facility | General | Workbenches have been installed / Clean room stools | Last Friday, new workbenches were installed.
Vladimir got a new table and a cleanroom
stool. |
 |
20
|
Tue Sep 25 14:18:14 2012 |
Koji | Clean | General | Particle Counts | Particle counts
Before the prefilter is installed:
0.5um 1191cnts, 0.7um 346cnts |
|
21
|
Mon Oct 1 16:06:55 2012 |
Koji | Clean | General | Particle Counts | 1. It turned out that the particle
counter MET ONE 227A at ATF shows
(particle count)/(0.1 ft^3) |
|
22
|
Fri Oct 5 03:39:58 2012 |
Koji | Optics | General | RoC Test setup | Based on Zach's experiment design, I wrote
up a bit more detailed optical layout for
the mirror test. |
 |
23
|
Mon Oct 8 11:30:47 2012 |
Koji | Optics | General | EG&G 2mm photodiode angle response | EGE&G 2mm photodiode angle response
measured by Sam T1100564-v1 |
|
24
|
Tue Oct 9 04:59:24 2012 |
Koji | Optics | General | OMC Test Optical Setup | |
 |
25
|
Tue Oct 9 05:03:15 2012 |
Koji | Electronics | General | OMC Test Electronics Setup | |
 |
26
|
Fri Oct 12 17:15:19 2012 |
Koji | Optics | General | Loan from the 40m / ATF |
HWP set
|
|
28
|
Tue Oct 16 15:50:09 2012 |
Koji | General | General | Work completed in August/September [!] |
Work done
|
|
29
|
Tue Oct 16 15:51:01 2012 |
Koji | General | General | Plan Update: October [!] | Completed work of the previous months:
[Jul]
[Aug] |
|
30
|
Wed Oct 17 20:36:04 2012 |
Koji | Optics | General | RoC test cavity locked | The RoC test setup has been built on
the optical table at ATF.
|
  |
31
|
Thu Oct 18 20:23:33 2012 |
Koji | Optics | Characterization | Improved measurement | Significant
improvement has been achieved in the RoC |
 |
32
|
Wed Nov 7 01:28:20 2012 |
Koji | Optics | Characterization | Wedge angle test (A1) | Wedge
angle test
Result: Wedge angle of Prism A1: |
 |
33
|
Wed Nov 7 20:21:42 2012 |
Koji | General | General | Work completed in October [!] | Completed work of the previous months:
[Jul]
[Aug] |
|
34
|
Wed Nov 7 20:44:11 2012 |
Koji | General | General | Plan Update: November [!] | Completed work of the previous months:
[Jul]
[Aug] |
|
35
|
Thu Nov 8 13:24:53 2012 |
Koji | Optics | Characterization | More wedge measurement | A1
Horiz Wedge 0.497
+/- 0.004 deg |
|
36
|
Thu Nov 8 19:47:55 2012 |
Koji | Electronics | Configuration | Solder for PZTs | Rich saids:
I |
|
37
|
Thu Nov 8 19:52:57 2012 |
Koji | Optics | General | How to apply UV epoxy | KA's question:
Do |
|
38
|
Thu Nov 8 20:12:10 2012 |
Koji | Optics | Configuration | How many glass components we need for a plate | Optical prisms 50pcs (A14+B12+C6+E18)
Curved Mirrors 25pcs (C13+D12)
|
|
39
|
Fri Nov 9 00:43:32 2012 |
Koji | Optics | Characterization | Further more wedge measurement | Now it's enough for the first OMC (or even
second one too).
Today's measurements all distributed |
 |
40
|
Sat Nov 17 02:31:34 2012 |
Koji | Optics | Characterization | Mirror T test | Mirror T test
The mirror was misaligned to have
~2deg incident (mistakenly...) angle. |
|
41
|
Mon Nov 19 13:33:14 2012 |
Koji | Optics | Characterization | Resuming testing mirror RoCs | In order to resume testing the curvatures
of the mirrors, the same mirror as the previous
one was tested. |
|
42
|
Mon Nov 26 01:40:00 2012 |
Koji | Optics | Characterization | More RoC measurement | C1: RoC: 2.57845 +/− 4.2e−05m
|
|
43
|
Thu Nov 29 21:18:23 2012 |
Koji | Optics | General | OMC Mounting Prisms have come | |
 |
44
|
Tue Dec 18 20:04:40 2012 |
Koji | Optics | Characterization | Prism Thickness Measurement | The thicknesses of the prism mirrors (A1-A5)
were measured with micrometer thickness gauge.
Since the thickness of the thinner |
|
45
|
Wed Dec 19 18:47:03 2012 |
Koji | Clean | General | First Contact Training with Margot | Steve and I visited Margot to have a training
session for application of First Contact
on optics. |
|
46
|
Wed Dec 26 14:33:33 2012 |
Koji | Facility | General | Lase Interlock wired | Two switches are connected in series. |
  |
47
|
Mon Dec 31 01:45:04 2012 |
Koji | General | General | Work completed in Nov and Dec [!] | Completed work of the previous months:
[Jul]
[Aug] |
|
48
|
Mon Dec 31 03:10:09 2012 |
Koji | Optics | General | SolidWorks model of the OMC breadboard | |
 |
49
|
Mon Dec 31 03:11:45 2012 |
Koji | Optics | Characterization | Further more RoC measurement | Total (excluding C2, C7, C8): 2.575 +/-
0.005 [m]
New results |
|
50
|
Wed Jan 2 07:35:55 2013 |
Koji | Optics | Characterization | Thickness of a curved mirror | Measured the thickness of a curved mirror:
Took three points separated by 120
degree. |
|
51
|
Wed Jan 2 07:45:39 2013 |
Koji | Optics | Characterization | First Contact test | Conclusion:
Good. First contact did not damage the coating
surface, and reduced the loss |
 |
52
|
Sun Jan 6 23:22:21 2013 |
Koji | Mechanics | General | SolidWorks model of the OMC suspension | |
 |
53
|
Thu Jan 10 18:37:50 2013 |
Koji | Optics | Characterization | Wedging of the PZTs | Yesterday I measured the thickness of the
PZTs in order to get an idea how much the
PZTs are wedged. |
|
54
|
Wed Jan 16 14:10:50 2013 |
Koji | Optics | Characterization | Autocollimator tests of optics perpendicularity/parallelism | The
items:
- Autocollimator (AC) borrowed from |
|