40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  OMC elog, Page 2 of 13  Not logged in ELOG logo
ID Date Authorup Type Category Subject Text Attachments
  355   Thu Apr 25 15:05:19 2019 JoeOpticsCharacterizationLooking at PZT HOM spacing dependance and thinking about workflow[koji, joe]

The template or glass breadboard
was wobbling, and we noticed that the caivty
  
  1   Fri Jun 15 15:45:49 2012 KojiGeneralGeneralOMC PlanLIGO Document G1200683-v1:

aLIGO OMC fabrication and testing
  
  2   Sat Jun 16 08:53:09 2012 KojiGeneralGeneralTo Do ListFacility

    Work
    
  
  3   Wed Jun 20 00:10:53 2012 KojiFacilityGeneralHole on the wall was patched   P6191706.jpg 
  7   Sat Jul 14 02:16:07 2012 KojiGeneralGeneralPlan Update: JulyFacility/Supplies

    Work in progress
 P7071878.jpg 
  8   Wed Jul 18 23:20:13 2012 KojiOpticsCharacterizationMode scan results of ELIGONic Smith sent me a bunch of elog lists
where the results of the mode scan can be
found.
  
  10   Mon Jul 23 17:15:14 2012 KojiCleanGeneralTalking with MargotI consulted with Margot about the cleaning
of the optics

    Optics are considered
  
  11   Tue Jul 24 11:41:29 2012 KojiGeneralGeneralUseful referencesNicolas Smith,
LIGO Document T0900383-v1
  
  12   Tue Jul 31 21:29:43 2012 KojiGeneralGeneralWork completed in July [!]
    Completed Work: Facility/Supplies

   
        
  
  13   Tue Jul 31 21:33:17 2012 KojiGeneralGeneralPlan Update: August [!]Completed work of the previous months:
[Jul]
[Aug] [Sep] [Oct] [Nov] [Dec]
  
  14   Wed Aug 1 19:35:00 2012 KojiFacilityGeneralFloor cleaned / Workbench being built / Table top defect-
The floor of the room was cleaned and waxed!
-
 P8011949.JPGP8011947.JPGP8011948.JPG 
  15   Sat Aug 11 00:59:14 2012 KojiFacilityGeneralLaser Safety BarrierIt seemed that a laser safety barrier was
installed today!?
 P8131960.JPG 
  16   Mon Aug 13 16:59:11 2012 KojiCleanGeneralRoom Cleaning LogFloor wiped with a wet wiper (Aug 13, 2012)
Floor wiped with a wet wiper (Aug
15, 2012)
  
  17   Mon Aug 13 17:01:35 2012 KojiCleanGeneralParticle CountsAug 13, 2012 / 0.5um 1000~2000/(0.1 cu
ft) / 0.7um   400-600/(0.1 cu ft)
by ATF particle counter (MET ONE 227A)
  
  18   Tue Aug 14 03:29:06 2012 KojiSupplyGeneralClean supply rackClean supplies & some cleaning tools
are located at the right side of the entrance.
The file cabinet there was moved to
 P8131959.JPGP8131961.JPG 
  19   Wed Aug 22 20:16:43 2012 KojiFacilityGeneralWorkbenches have been installed / Clean room stoolsLast Friday, new workbenches were installed.
Vladimir got a new table and a cleanroom
stool.
 P8171968.jpgP8171969.jpg 
  20   Tue Sep 25 14:18:14 2012 KojiCleanGeneralParticle CountsParticle counts
Before the prefilter is installed:
0.5um 1191cnts, 0.7um 346cnts
  
  21   Mon Oct 1 16:06:55 2012 KojiCleanGeneralParticle Counts1. It turned out that the particle
counter MET ONE 227A at ATF shows 
(particle count)/(0.1 ft^3) 
  
  22   Fri Oct 5 03:39:58 2012 KojiOpticsGeneralRoC Test setupBased on Zach's experiment design, I wrote
up a bit more detailed optical layout for
the mirror test.
 RoC_test_setup.pdfRoC_test_setup.png 
  23   Mon Oct 8 11:30:47 2012 KojiOpticsGeneralEG&G 2mm photodiode angle responseEGE&G 2mm photodiode angle response
measured by Sam T1100564-v1
  
  24   Tue Oct 9 04:59:24 2012 KojiOpticsGeneralOMC Test Optical Setup   OMC_test_setup.pngOMC_test_setup.pdf 
  25   Tue Oct 9 05:03:15 2012 KojiElectronicsGeneralOMC Test Electronics Setup   electronics_setup.pngelectronics_setup.pdf 
  26   Fri Oct 12 17:15:19 2012 KojiOpticsGeneralLoan from the 40m / ATF
    HWP set
         
    
  
  28   Tue Oct 16 15:50:09 2012 KojiGeneralGeneralWork completed in August/September [!]
    Work done
   

        
  
  29   Tue Oct 16 15:51:01 2012 KojiGeneralGeneralPlan Update: October [!]Completed work of the previous months:
[Jul]
[Aug]
  
  30   Wed Oct 17 20:36:04 2012 KojiOpticsGeneralRoC test cavity lockedThe RoC test setup has been built on
the optical table at ATF.
 detailed_RoC_setup.pdfomc_cav_lock_SCRN_SHOT.pngCav_scan_response_20121016.pdf 
  31   Thu Oct 18 20:23:33 2012 KojiOpticsCharacterizationImproved measurementSignificant
improvement has been achieved in the RoC
 Cav_scan_response_zoom_20121017.pdfdetailed_RoC_setup.pdf 
  32   Wed Nov 7 01:28:20 2012 KojiOpticsCharacterizationWedge angle test (A1)Wedge
angle test
Result: Wedge angle of Prism A1:
 wedge_measurement.pngwedge_measurement_setup.png 
  33   Wed Nov 7 20:21:42 2012 KojiGeneralGeneralWork completed in October [!]Completed work of the previous months:
[Jul]
[Aug]
  
  34   Wed Nov 7 20:44:11 2012 KojiGeneralGeneralPlan Update: November [!]Completed work of the previous months:
[Jul]
[Aug]
 OMC_Project_Schedule.pdf 
  35   Thu Nov 8 13:24:53 2012 KojiOpticsCharacterizationMore wedge measurementA1
Horiz Wedge    0.497   
+/-    0.004 deg
 wedge_measurement_overall.pdf 
  36   Thu Nov 8 19:47:55 2012 KojiElectronicsConfigurationSolder for PZTsRich saids:
I
  
  37   Thu Nov 8 19:52:57 2012 KojiOpticsGeneralHow to apply UV epoxyKA's question:
Do
 UVepoxy.jpg 
  38   Thu Nov 8 20:12:10 2012 KojiOpticsConfigurationHow many glass components we need for a plateOptical prisms 50pcs (A14+B12+C6+E18)
Curved Mirrors 25pcs (C13+D12)
  
  39   Fri Nov 9 00:43:32 2012 KojiOpticsCharacterizationFurther more wedge measurementNow it's enough for the first OMC (or even
second one too).
Today's measurements all distributed
 wedge_measurement_overall.pdf121108a_A1.pdf 
  40   Sat Nov 17 02:31:34 2012 KojiOpticsCharacterizationMirror T testMirror T test
The mirror was misaligned to have
~2deg incident (mistakenly...) angle.
  
  41   Mon Nov 19 13:33:14 2012 KojiOpticsCharacterizationResuming testing mirror RoCsIn order to resume testing the curvatures
of the mirrors, the same mirror as the previous
one was tested.
 Cav_scan_response_zoom_20121016.pdf 
  42   Mon Nov 26 01:40:00 2012 KojiOpticsCharacterizationMore RoC measurementC1: RoC: 2.57845 +/− 4.2e−05m
 RoC_measurement.pdf 
  43   Thu Nov 29 21:18:23 2012 KojiOpticsGeneralOMC Mounting Prisms have come   PB293030.JPGPB293032.JPG 
  44   Tue Dec 18 20:04:40 2012 KojiOpticsCharacterizationPrism Thickness MeasurementThe thicknesses of the prism mirrors (A1-A5)
were measured with micrometer thickness gauge.
Since the thickness of the thinner
 prism.png 
  45   Wed Dec 19 18:47:03 2012 KojiCleanGeneralFirst Contact Training with MargotSteve and I visited Margot to have a training
session for application of First Contact
on optics.
  
  46   Wed Dec 26 14:33:33 2012 KojiFacilityGeneralLase Interlock wiredTwo switches are connected in series.  PC263073.jpgPC263074.jpgPC263075.jpg 
  47   Mon Dec 31 01:45:04 2012 KojiGeneralGeneralWork completed in Nov and Dec [!]Completed work of the previous months:
[Jul]
[Aug]
  
  48   Mon Dec 31 03:10:09 2012 KojiOpticsGeneralSolidWorks model of the OMC breadboard   D1201439_aLIGO_Breadboard_layout_assy_121224.pngD1201439_aLIGO_Breadboard_layout_assy_130105.easm 
  49   Mon Dec 31 03:11:45 2012 KojiOpticsCharacterizationFurther more RoC measurementTotal (excluding C2, C7, C8): 2.575 +/-
0.005 [m]
New results
 Cav_scan_response_zoom_20121125_C6_9.pdf 
  50   Wed Jan 2 07:35:55 2013 KojiOpticsCharacterizationThickness of a curved mirrorMeasured the thickness of a curved mirror:
Took three points separated by 120
degree.
  
  51   Wed Jan 2 07:45:39 2013 KojiOpticsCharacterizationFirst Contact testConclusion:
Good. First contact did not damage the coating
surface, and reduced the loss
 Cav_scan_response_zoom_20121125_C2_before.pdfCav_scan_response_zoom_20121125_C2_after.pdf 
  52   Sun Jan 6 23:22:21 2013 KojiMechanicsGeneralSolidWorks model of the OMC suspension    D0900295_AdvLIGO_SUS_Output_Mode_Cleaner_Overall_Assembly.pngD0900295_AdvLIGO_SUS_Output_Mode_Cleaner_Overall_Assembly.easm 
  53   Thu Jan 10 18:37:50 2013 KojiOpticsCharacterizationWedging of the PZTsYesterday I measured the thickness of the
PZTs in order to get an idea how much the
PZTs are wedged.
 PZT_wedging.pdf 
  54   Wed Jan 16 14:10:50 2013 KojiOpticsCharacterizationAutocollimator tests of optics perpendicularity/parallelismThe
items:
- Autocollimator (AC) borrowed from
  
ELOG V3.1.3-