40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  OMC elog, Page 2 of 13  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Type Category Subjectdown Text Attachments
  418   Thu Jul 21 13:21:27 2022 KojiGeneralConfigurationWindows laptop for WincamD Beam'R2 recoveryThe Windows laptop for WincamD/Beam'R2
(DELL Vostro3300) was not functional. 
- Windows 7 got stuck in the starting
 IMG_1102.JPG 
  463   Tue Nov 29 15:54:47 2022 KojiGeneralConfigurationWindows laptop for WincamD Beam'R2 recoveryAaron took the set to Cryo lab

 
  
  361   Wed May 15 19:07:53 2019 KojiCleanGeneralWhat is this???Suddenly something dirty emerged in the
lab. What is this? It looks like an insulation
foam or similar, but is quite degraded and
 P_20190515_185602.jpgP_20190515_185844.jpg 
  371   Thu Aug 22 12:35:53 2019 StephenOpticsCharacterizationWedging of the debonded PZTs 2019 AugustWedge and thickness measurements of PZTs
12 and 13 took place after debonding and
cleaning - results are shown in the first
 IMG_4775.JPGIMG_4770.JPG 
  373   Thu Aug 29 11:51:49 2019 shrutiOpticsCharacterizationWedging of the debonded PZTs - CalculationUsing the measurements of PZTs 12,13 taken
by Stephen, I estimated the wedging angle
and orientation following Section 2.3.1 of
 PZT_Wedging_Results.pdfPZT_Wedging_Calc.pdf 
  53   Thu Jan 10 18:37:50 2013 KojiOpticsCharacterizationWedging of the PZTsYesterday I measured the thickness of the
PZTs in order to get an idea how much the
PZTs are wedged.
 PZT_wedging.pdf 
  59   Mon Feb 4 00:39:08 2013 KojiOpticsCharacterizationWedge measurement with the autocollimator and the rotation stageMethod:

    Mount the tombstone prism
on the prism mount. The mount is fixed on
 autocollimator_wedge_measurement.pdf 
  60   Wed Feb 6 02:34:10 2013 KojiOpticsCharacterizationWedge measurement with the autocollimator and the rotation stageMeasurement:

    A6:   α
= 0.665 deg, β = +3.0 arcmin (1.5 div
  
  66   Fri Mar 1 23:52:18 2013 KojiOpticsCharacterizationWedge measurement with the autocollimator and the rotation stageMeasurement:

    E1:   α = 
0.672 deg, β = +0.0  arcmin (0 div up)
  
  56   Sat Jan 19 20:47:41 2013 KojiOpticsCharacterizationWedge measurement with the autocollimatorThe wedge angle of the prism "A1"
was measured with the autocollimator (AC).
The range of the AC is 40 arcmin.
 autocollimator_wedge_measurement.pdf 
  32   Wed Nov 7 01:28:20 2012 KojiOpticsCharacterizationWedge angle test (A1)Wedge
angle test
Result: Wedge angle of Prism A1:
 wedge_measurement.pngwedge_measurement_setup.png 
  11   Tue Jul 24 11:41:29 2012 KojiGeneralGeneralUseful referencesNicolas Smith,
LIGO Document T0900383-v1
  
  239   Sun Sep 6 16:50:51 2015 KojiElectronicsGeneralUnit test of the EOM/AOM Driver S1500118TEST
Result: S1500118

Additional
 P9037810.JPGRF_AM_spectra.pdf 
  89   Mon Apr 1 03:23:48 2013 KojiOpticsGeneralUV power calibration[Koji Lisa Jeff Zach]
Eric G bought a UV power meter from
American Ultraviolet.
  
  62   Thu Feb 7 23:01:45 2013 KojiOpticsCharacterizationUV epoxy gluing test [Jeff, Yuta, Koji]
Gluing test with UV-cure epoxy
Optocast 3553-LV-UTF-HM
  
  265   Mon Aug 22 12:58:16 2016 KojiGeneralGeneralUV bond samples -> Garilynn- FS base + Mounting Prism

- FS or SF2 1/2" piece + FS
or SF2 1/2" piece
  
  134   Fri May 31 14:07:54 2013 KojiOpticsCharacterizationTransverse Mode Spacing measurement afte the baking Measurement for pitch
Free Spectral Range
(FSR): 264.9703 +/− 0.0007 MHz
 Cav_scan_response_130530_Pitch.pdfCav_scan_response_130530_Yaw.pdf 
  462   Mon Nov 21 19:13:35 2022 KojiGeneralGeneralTransmission measurement (2nd deep cleaning of OMC #1)OMC Transmission measurement after
the 2nd deep cleaning

The 2nd deep cleaning didn't
 PXL_20221122_030736513.jpgOMC_loss.pdf 
  278   Fri May 26 21:53:20 2017 KojiGeneralConfigurationTrans RF PD setupRecent work

- DC output of the trans RF PD
was connected to the BNC patch panel. =>
  
  279   Tue Jun 6 00:49:48 2017 KojiGeneralConfigurationTrans RF PD setupLast week, I further worked on the RF system
to install 20dB coupler on the agilent unit
and setup the R channel. This allowed me
  
  280   Tue Jun 6 22:00:36 2017 KojiGeneralConfigurationTrans RF PD setup- Replaced the PZT with the one used from
the beginning. This must be PZT #21. After
the replacement, the spot positions look
  
  4   Wed Jun 20 20:37:45 2012 ZachOpticsConfigurationTopology / parameter selectionEDIT (ZK): All the plots here were generated  8x 
  448   Fri Aug 26 22:29:02 2022 KojiGeneralGeneralTool Shipping PrepShipping preparation for the LLO
trip

Started
July 15, 2022 and finished Aug 30. So it
 PXL_20220831_025623318.jpgPXL_20220831_024518032.jpgPXL_20220831_030234581.jpg 
  2   Sat Jun 16 08:53:09 2012 KojiGeneralGeneralTo Do ListFacility

    Work
    
  
  200   Mon Jul 7 01:36:03 2014 KojiGeneralGeneralTo DoOptical tests

    Cleaning

   Power Budget
  
  204   Thu Jul 10 08:34:57 2014 KojiGeneralGeneralTo DoOptical tests

    Cleaning

   Power Budget
  
  177   Tue Dec 10 16:41:51 2013 KojiGeneralGeneralTo BuyMasks / Wipes => done   
  50   Wed Jan 2 07:35:55 2013 KojiOpticsCharacterizationThickness of a curved mirrorMeasured the thickness of a curved mirror:
Took three points separated by 120
degree.
  
  413   Tue Jun 28 16:13:34 2022 KojiGeneralGeneralThe small optical table not small enough to get outThe table width was an inch too large compared
to the door width. We need to tilt the table
and it seemed too much for us. Let's
 IMG-5203.jpg 
  421   Thu Jul 21 17:47:00 2022 KojiGeneralGeneralThe profile of the beam incident on the fiber input couplerThe profile of the beam incident on the
fiber input

The fiber input was deflected by
 fiber_beam_profile.pdf 
  473   Wed Jan 25 23:51:04 2023 KojiGeneralGeneralThe items packed for DownsQty1 1/2 mounts
Qty2 prism mounts
Qty6 gluing fixures
 PXL_20230127_055920944.jpg 
  404   Mon Nov 23 23:17:19 2020 KojiElectronicsCharacterizationThe dark noise of the Q3000 QPDsThe dark noise levels of the four Q3000
QPDs were measured with FEMTO DLPCA200 low
noise transimpedance amp.
 Q3000_dark_noise_81.pdfQ3000_dark_noise_82.pdfQ3000_dark_noise_83.pdfQ3000_dark_noise_84.pdf 
  405   Tue Nov 24 10:45:07 2020 gautamElectronicsCharacterizationThe dark noise of the Q3000 QPDsI see that these measurements are done
out to 100 kHz - I guess there is no reason
to suspect anything at 55 MHz which is where
  
  406   Tue Nov 24 12:27:18 2020 KojiElectronicsCharacterizationThe dark noise of the Q3000 QPDsThe amplifier BW was 400kHz at the gain
of 1e7 V/A. And the max BW is 500kHz even
at a lower gain. I have to setup something
  
  285   Wed Jul 5 16:59:44 2017 KojiGeneralGeneralThe OMC #002 was packed[Stephen Koji]

The OMC #002 was packed for the
transportation to Downs.
 DSC_0360.JPG 
  212   Sun Jul 20 17:20:39 2014 KojiGeneralGeneralThe 3rd (LIO) OMC was shipped out to LHO The 3rd (LIO) OMC was shipped out to LHO
on Friday (Jul 18) Morning.
At LHO
  
  86   Thu Mar 28 03:37:07 2013 ZachOpticsConfigurationTest setup input optics progress[Lisa, Zach]
Last night (Tuesday), I finished
setting up and aligning most of the input
 OMC_test_setup_IO.jpg2013-03-27_05.48.20.jpg2013-03-28_02.29.36.jpg 
  525   Tue Apr 18 07:59:46 2023 Madeline LesovskyGeneralGeneralTest Cure Bake - Curved Mirror Subassembly BondingThis is a test bake conducted in Air Bake
Oven A (ABO-A) held in the 40m Clean and
Bake facility. The overall objective is to
 6x 
  10   Mon Jul 23 17:15:14 2012 KojiCleanGeneralTalking with MargotI consulted with Margot about the cleaning
of the optics

    Optics are considered
  
  470   Mon Dec 19 18:51:50 2022 KojiOpticsCharacterizationTMS measurement with the PZT voltages altered[Camille, Koji] Log of
the work on Dec 15, 2023

The vertical and horizontal
 Cav_scan_response_PZT1_0_Pitch.pdfCav_scan_response_PZT1_0_Yaw.pdfOMC_20221215.pdfHOM_plot_PZT0_0.pdfHOM_PZTV_PZT1_0V.pdf 
  396   Fri Oct 9 01:01:01 2020 KojiGeneralGeneralTFT Monitor mountingTo spare some room on the optical table,
I wanted to mount the two TFT monitor units
on the HEPA enclosure frame.
 20201008214515_IMG_0152.jpg20201008214519_IMG_0153.jpg20201008214536_IMG_0154.jpg20201008220955_IMG_0155.jpg20201008221019_IMG_0156_2.jpg 
  397   Fri Oct 16 00:53:29 2020 KojiGeneralGeneralTFT Monitor mountingThe image flipping of the display unit
was fixed. The vendor told me how to fix
it.
  
  579   Wed Jul 26 12:14:53 2023 Camille MakaremOpticsConfigurationSwapping Subassemblies While using mirror SN14 and mirror SN30
for CM1 and CM2 respectively, we monitored
the two beam spots on FM2 and continued to
  
  453   Fri Nov 11 19:07:48 2022 KojiSupplyGeneralSupply OrderClean Supply Ordered


TexWipe TX8410 AlphaSat
Vectra Alpha 10 50 sheets x 12 pk  (VWR
  
  192   Fri Jun 27 18:51:33 2014 KojiGeneralGeneralSupplyPTOUCH TAPE (12mm white) x 2
9V batteries
  
  317   Sat Feb 2 20:28:21 2019 KojiOpticsCharacterizationSummary: OMC(003) HOM structure recalculationOMC (003)
History: Measurement date
2014/7/5, Stored for I1, Installed to H1
 OMC_HOM_140705.pdfHOM_PZTV_PZT1_0V.pdfHOM_plot_PZT0_0.pdfCav_scan_response_PZT_HOM.pdf 
  316   Sat Feb 2 20:03:19 2019 KojiOpticsCharacterizationSummary: OMC(002) HOM structure recalculation (before mirror replacement)OMC (002)
History: Measurement date
2013/10/11, Installed to L1 2013/XX
 OMC_HOM_131011.pdfHOM_PZTV.pdfHOM_plot_PZT0_0.pdfCav_scan_response_PZT_HOM.pdf 
  315   Sat Feb 2 16:17:13 2019 KojiOpticsCharacterizationSummary: OMC(001) HOM structure recalculationEach peak of the transfer function measurement
was fitted again with a complex function:

 OMC_HOM_130531.pdfHOM_PZTV.pdfHOM_plot_PZT0_0.pdfCav_scan_response_HOM.pdf 
  552   Fri Jun 30 10:55:45 2023 Camille MakaremElectronicsCharacterizationSummary of PZT reliability test procedure[Camille, Thejas, Stephen]

To test the reliability of the
PZTs, they were driven for 10^7 cycles. (At
  
  551   Fri Jun 30 10:30:57 2023 Camille MakaremElectronics Summary of DC response measurements[Camille, Thejas, Stephen]

The DC response of the PZT was
measured using the following setup (pictures
 PXL_20230627_164124373_crop.MP.jpgPXL_20230627_164108461_crop.jpg 
ELOG V3.1.3-