Entry  Fri Jun 15 15:45:49 2012, Koji, General, General, OMC Plan 
Entry  Sat Jun 16 08:53:09 2012, Koji, General, General, To Do List 
Entry  Wed Jun 20 00:10:53 2012, Koji, Facility, General, Hole on the wall was patched P6191706.jpg
Entry  Wed Jun 20 20:37:45 2012, Zach, Optics, Configuration, Topology / parameter selection 8x
Entry  Thu Jun 21 03:07:27 2012, Zach, Optics, Configuration, Parameter selection / mode definition geom_bowtie.pnggeom_non-bowtie.png
Entry  Sat Jul 14 02:16:07 2012, Koji, General, General, Plan Update: July P7071878.jpg
Entry  Wed Jul 18 23:20:13 2012, Koji, Optics, Characterization, Mode scan results of ELIGO 
Entry  Fri Jun 29 11:26:04 2012, Zach, Optics, Characterization, RoC measurement setup RoC_measurement_setup.pngRoC_measurement_setup.graffle.zip
    Reply  Sun Jul 22 15:56:53 2012, Zach, Optics, Characterization, RoC measurement setup detailed_RoC_setup.pngdetailed_RoC_setup.graffle.zip
Entry  Tue Jul 24 11:41:29 2012, Koji, General, General, Useful references 
Entry  Tue Jul 31 21:29:43 2012, Koji, General, General, Work completed in July [!] 
Entry  Tue Jul 31 21:33:17 2012, Koji, General, General, Plan Update: August [!] 
Entry  Wed Aug 1 19:35:00 2012, Koji, Facility, General, Floor cleaned / Workbench being built / Table top defect P8011949.JPGP8011947.JPGP8011948.JPG
Entry  Sat Aug 11 00:59:14 2012, Koji, Facility, General, Laser Safety Barrier P8131960.JPG
Entry  Mon Aug 13 16:59:11 2012, Koji, Clean, General, Room Cleaning Log 
Entry  Mon Aug 13 17:01:35 2012, Koji, Clean, General, Particle Counts 
Entry  Tue Aug 14 03:29:06 2012, Koji, Supply, General, Clean supply rack P8131959.JPGP8131961.JPG
Entry  Wed Aug 22 20:16:43 2012, Koji, Facility, General, Workbenches have been installed / Clean room stools P8171968.jpgP8171969.jpg
Entry  Tue Sep 25 14:18:14 2012, Koji, Clean, General, Particle Counts 
    Reply  Mon Oct 1 16:06:55 2012, Koji, Clean, General, Particle Counts 
Entry  Fri Oct 5 03:39:58 2012, Koji, Optics, General, RoC Test setup RoC_test_setup.pdfRoC_test_setup.png
Entry  Mon Oct 8 11:30:47 2012, Koji, Optics, General, EG&G 2mm photodiode angle response 
Entry  Tue Oct 9 04:59:24 2012, Koji, Optics, General, OMC Test Optical Setup OMC_test_setup.pngOMC_test_setup.pdf
Entry  Tue Oct 9 05:03:15 2012, Koji, Electronics, General, OMC Test Electronics Setup electronics_setup.pngelectronics_setup.pdf
Entry  Fri Oct 12 17:15:19 2012, Koji, Optics, General, Loan from the 40m / ATF 
Entry  Tue Oct 16 14:50:54 2012, jamie, jeff, General, General, OMC breadboard/plate measurement dimensions 
Entry  Tue Oct 16 15:50:09 2012, Koji, General, General, Work completed in August/September [!] 
Entry  Tue Oct 16 15:51:01 2012, Koji, General, General, Plan Update: October [!] 
Entry  Wed Oct 17 20:36:04 2012, Koji, Optics, General, RoC test cavity locked detailed_RoC_setup.pdfomc_cav_lock_SCRN_SHOT.pngCav_scan_response_20121016.pdf
Entry  Wed Nov 7 01:28:20 2012, Koji, Optics, Characterization, Wedge angle test (A1) wedge_measurement.pngwedge_measurement_setup.png
Entry  Wed Nov 7 20:21:42 2012, Koji, General, General, Work completed in October [!] 
Entry  Wed Nov 7 20:44:11 2012, Koji, General, General, Plan Update: November [!] OMC_Project_Schedule.pdf
Entry  Thu Nov 8 13:24:53 2012, Koji, Optics, Characterization, More wedge measurement wedge_measurement_overall.pdf
Entry  Thu Nov 8 19:47:55 2012, Koji, Electronics, Configuration, Solder for PZTs 
Entry  Thu Nov 8 19:52:57 2012, Koji, Optics, General, How to apply UV epoxy UVepoxy.jpg
Entry  Thu Nov 8 20:12:10 2012, Koji, Optics, Configuration, How many glass components we need for a plate 
Entry  Fri Nov 9 00:43:32 2012, Koji, Optics, Characterization, Further more wedge measurement wedge_measurement_overall.pdf121108a_A1.pdf
Entry  Sat Nov 17 02:31:34 2012, Koji, Optics, Characterization, Mirror T test 
Entry  Thu Oct 18 20:23:33 2012, Koji, Optics, Characterization, Improved measurement Cav_scan_response_zoom_20121017.pdfdetailed_RoC_setup.pdf
    Reply  Mon Nov 19 13:33:14 2012, Koji, Optics, Characterization, Resuming testing mirror RoCs Cav_scan_response_zoom_20121016.pdf
Entry  Mon Nov 26 01:40:00 2012, Koji, Optics, Characterization, More RoC measurement RoC_measurement.pdf
Entry  Thu Nov 29 21:18:23 2012, Koji, Optics, General, OMC Mounting Prisms have come PB293030.JPGPB293032.JPG
Entry  Tue Dec 18 20:04:40 2012, Koji, Optics, Characterization, Prism Thickness Measurement prism.png
Entry  Mon Jul 23 17:15:14 2012, Koji, Clean, General, Talking with Margot 
    Reply  Wed Dec 19 18:47:03 2012, Koji, Clean, General, First Contact Training with Margot 
Entry  Wed Dec 26 14:33:33 2012, Koji, Facility, General, Lase Interlock wired PC263073.jpgPC263074.jpgPC263075.jpg
Entry  Mon Dec 31 01:45:04 2012, Koji, General, General, Work completed in Nov and Dec [!] 
Entry  Mon Dec 31 03:10:09 2012, Koji, Optics, General, SolidWorks model of the OMC breadboard D1201439_aLIGO_Breadboard_layout_assy_121224.pngD1201439_aLIGO_Breadboard_layout_assy_130105.easm
Entry  Mon Dec 31 03:11:45 2012, Koji, Optics, Characterization, Further more RoC measurement Cav_scan_response_zoom_20121125_C6_9.pdf
Entry  Wed Jan 2 07:35:55 2013, Koji, Optics, Characterization, Thickness of a curved mirror 
Entry  Wed Jan 2 07:45:39 2013, Koji, Optics, Characterization, First Contact test Cav_scan_response_zoom_20121125_C2_before.pdfCav_scan_response_zoom_20121125_C2_after.pdf
Entry  Sun Jan 6 23:22:21 2013, Koji, Mechanics, General, SolidWorks model of the OMC suspension  D0900295_AdvLIGO_SUS_Output_Mode_Cleaner_Overall_Assembly.pngD0900295_AdvLIGO_SUS_Output_Mode_Cleaner_Overall_Assembly.easm
Entry  Wed Jan 16 14:10:50 2013, Koji, Optics, Characterization, Autocollimator tests of optics perpendicularity/parallelism 
Entry  Fri Jan 18 13:25:17 2013, Koji, Optics, Configuration, Autocollimator calibration autocollimator_calibration.pdf