Entry  Mon Jul 18 14:20:09 2022, Koji, General, General, OMC #002 Plan Portal 
== Initial Preparation ==


[Done] OMC #002 placement 
[Done] OMC #002 locking
Details OMC
ELOG 414


== Measurements ==
    Reply  Tue Jul 19 03:17:56 2022, Koji, General, General, OMC #002 Power Budget before mirror cleaning 
o Power Budget (2022/07/18)
NPRO ADJ -50 (min)
Fiber incident 62.8mW
       Reply  Thu Jul 21 02:55:06 2022, Koji, General, General, OMC #002 Power Budget after mirror cleaning 
o Power Budget after FirstContact cleaning (2022/07/20)
NPRO ADJ -50 (min)
Fiber incident --.-mW
    Reply  Thu Jul 21 14:35:35 2022, Koji, General, General, Bond reinforcement blocks for the invar brackets IMG_1095.JPGIMG_1091.JPG
Bond reinforcement blocks for the invar brackets:


Attachment 1: CLASS A glass prisms (the surplus of the 2016 repair)
Attachment 2: Dirty
reiforcement bars made of Aluminum
There are also many dirty prisms in the kit obtained from Stephen
    Reply  Thu Jul 21 14:55:48 2022, Koji, General, General, Optics bonding for the backscatter measurement IMG_1098.JPG
The backscatter beam is supposed to appear in the backpropagation path. The transmission of the OMC has a couple of optics, it's not easy to access
that beam.
To try to deflect the beam either horizontally or vertically, small optical pieces were made. (Attachment)
    Reply  Thu Jul 21 17:47:00 2022, Koji, General, General, The profile of the beam incident on the fiber input coupler fiber_beam_profile.pdf
The profile of the beam incident on the fiber input

The fiber input was deflected by a 45deg mirror. The beam profile was measured with WincamD. The beam was too strong (~60mW) even at the smallest
pump power (ADJ -50) of the NPRO. So the two ND20 filters were added to the lens right before the 45 deg mirror and the camera.
    Reply  Fri Jul 22 00:31:17 2022, Koji, General, General, OMC #002 backscatter measurement OMC_backscatter.pdf
Measure the power ratio between the forward-propagating and reverse-propagating beams.


Place a small deflecting mirror at the transmission.
Place a flat mirror at the deflected transmission. When the alignment
of this mirror is adjusted to retroreflect this beam, the DC of the cavity reflection PD increases, and also the CCD shows spurious fringes.
This
    Reply  Fri Jul 22 17:47:38 2022, Koji, General, General, C&B request for the reinforcement blocks PXL_20220722_222013127.jpg
OMC Reinforcement blocks

1. P/N D1600316; Version v4; Type 01; Qty 30; Source Chemistry Machine Shop
2. P/N D1600316; Version v4; Type 02; Qty 15; Source Chemistry Machine Shop
    Reply  Tue Jul 26 00:12:58 2022, Koji, General, General, High QE PD: QE measurements IMG_1118.JPG
- Installed the High QE PDs to OMC #002


B1-22@Cage B1 was installed to the transmission DCPD
B1-23@Cage B1 was installed to the reflection
DCPD


Upon the installation, the legs of the PDs were cut by 3mm. Also, the tab of the PD could not be embedded in the DCPD housing.
       Reply  Wed Jul 27 10:34:09 2022, Koji, General, General, High QE PD: QE measurements 2 IMG_1119.JPGIMG_1120.JPG
- DLPCA-200 trans-impedance amplifier was calibrated.
  Keithley source meter 2450 was connected to the amp. Provide current and read the output voltage with the precision digital voltage meter
(Agilent/Keysight).
    Reply  Wed Jul 27 10:09:51 2022, Koji, General, General, 4+4 wire clamp in hand PXL_20220727_072154009.jpg
Regarding: D1200971

- 4 CLASS A wire clamp obtained from the OMC spare
- 4 more DIRTY wire clamp obtained from WB experiments (they no longer use these)
    Reply  Wed Jul 27 10:34:30 2022, Koji, General, General, OMC #002 Protective FirstContact Paint IMG_1125.JPG
The optical surfaces were coated with FirstContact to keep them clean / somewhat protected during the transportation.
The PD aperture was sealed with FirstContact "caps" (made by Kate in 2016?).
    Reply  Wed Jul 27 23:52:18 2022, Koji, General, General, OMC #002 Cable bracket replacement (1) IMG_1126.JPGIMG_1135.JPGIMG_1127.JPGIMG_1129.JPGIMG_1130.JPG
Parts check

- D1300052-V3 SN001 is going to be used (Attachment 1)

- This is the PEEK version of the cable bracket (Attachment 2). The side thread holes have no Helicoils inserted. This
    Reply  Thu Jul 28 00:28:15 2022, Koji, General, General, OMC #002 Cable bracket replacement (2)  IMG_1132.JPGIMG_1133.JPGIMG_1136.JPG
Connector unmounting

- (Attachment 1) The connector nut rings were removed using an angled needle nose plier. The connector shell has a tight dimension
relative to the hole on the bracket. But of course, they could be extracted.
    Reply  Thu Jul 28 00:46:47 2022, Koji, General, General, Subject: OMC #002 Cable bracket replacement (3) IMG_1137.JPGIMG_1148.JPGIMG_1138.JPG
Checking the spare parts 

- Conclusion for OMC#2: need PEEK cable ties
- for more OMCs: need more BHCS / PEEK cable ties / Helicoils
    Reply  Wed Aug 10 18:42:27 2022, Koji, General, General, OMC #002 Cable bracket replacement (4) PXL_20220809_235457354.jpgPXL_20220811_011910569.jpgPXL_20220811_013746139.jpg
[Stephen Koji]

Now we got the C&Bed parts to continue to work on the cable bracket replacement.

1) Helicoil insertion
       Reply  Thu Aug 11 15:24:57 2022, Koji, General, General, OMC #002 Cable bracket replacement (5) 
- The hole size extension is going forwared now.

- Madeline and Chub are cleaning (sonicating) a drill (29/64=0.4531")
    Reply  Mon Aug 15 21:31:56 2022, Koji, General, General, OMC #002 Cable bracket replacement (6)  IMG_1155.JPGIMG_1149.JPGIMG_1150.JPG
The cable bracket was successfully replaced.


Looking from the QPD side (North side in Attachment 1), the connectors for the DCPDs and PZT are sticking out, and the
ones for QPDs are sticking to the other side. So only two rectangular holes (for QPDs) are facing north.


Top left is DCPDT
Top
    Reply  Mon Aug 15 22:06:18 2022, Koji, General, General, OMC #002 new cable tie installed IMG_1929.JPGIMG_1930.JPG
[Stephen Koji]

New cable ties were installed on the cable pegs attached to the long sides of the cable bracket.

 
    Reply  Mon Aug 15 22:43:35 2022, Koji, General, General, OMC #002 Delamination repair Part1 (1) IMG_1926.JPGPXL_20220816_011346581.jpg
[Stephen Koji]

Checked the delamination status:


The Invar bar on the cable bracket (DCPD side): Almost all delaminated (Attachment 1 left)
The invar bar on the cable bracket
       Reply  Mon Aug 15 22:49:03 2022, Koji, General, General, OMC #002 Delamination repair Part1 (2) 7x
EP30-2 preparation


Two Al foil cups + A sheet of Al foil (for test cure)
Set a tube on the glue gun
Attach an applicator tube
Push
a couple of times, and dispense the glue for a single stroke on a waste Al cup
Pour the 6g of glue to the other cup.
Add 0.3g of
Entry  Fri Jul 15 22:14:14 2022, Koji, General, General, OMC Lab recovery for the OMC #002 test PXL_20220716_035922673.jpgPXL_20220716_025319391.MP.jpgPXL_20220716_025334324.jpgPXL_20220716_035309066.jpgPXL_20220716_035411435.NIGHT.jpg
- The lab is chilly (18degC)

- Cleaned the lab and the optical table a bit so that the delicate work can be done. The diode test rig (borrowed from Downs - see OMC
ELOG 408 and OMC ELOG 409) was removed from the table and brought to the office (to return
    Reply  Tue Jul 26 00:01:59 2022, Koji, General, General, OMC #002 delamination check 2 IMG_1106.JPGIMG_1107.JPGIMG_1110.JPG
More epoxy delamination check:

DCPD R (Attachment 1): Found half delaminated

DCPD T (Attachment 2): Found half delaminated
Entry  Mon Jul 25 18:25:04 2022, Koji, General, General, A/C Filter was replaced 

New filter PN
Grainger
TK70457312T Mini-Pleat Air Filter, Style - Air Filters Box, Performance Rating MERV 14, Nominal Filter Size 12x24x2

 

Previous
Entry  Thu May 20 17:03:50 2021, Koji, General, General, SRS LCR meter SRS720 borrowed from Downs P_20210520_154841.jpg
Item loan: SRS LCR meter SRS720 borrowed from Downs. The unit is at the 40m right now for testing with an excelitas PD. Once it is done, the setup will
be moved to the OMC lab for testing the high QE PDs
    Reply  Sun May 30 15:17:16 2021, Koji, General, General, DCPD AF capacitance measirement PD_cap_meas.pdf20210529013015_IMG_0577.jpeg20210529013114_IMG_0580_2.jpeg20210529013200_IMG_0584.jpeg20210529013229_IMG_0586.jpeg
Attachment 1: System diagram. The reverse bias voltage is controlled by DS335. This can produce a voltage offset up to 10V. A G=+2 opamp
circuit was inserted so that a bias of up to +15V can be produced. The capacitances of the photodiodes were measured with SR720 LCR meter with a probe.
DS335 and SR720 were controlled from PC/Mac via serial connections.
       Reply  Sun May 30 15:32:56 2021, Koji, General, General, DCPD AF capacitance measirement highQEPD_capacitance.pdfC30665_capacitance.pdf
Measurement result:

The capacitance at no bias was 460~500pF. This goes down to below 300pF at 1.0~1.5V reverse bias. At maximum +15V, the capacitance goes down
to 200~220pF.
    Reply  Fri Jul 22 17:41:01 2022, Koji, General, General, SRS LCR meter SRS720 returned to Downs PXL_20220723_002330805.jpg
SRS LCR meter SRS720 was returned to Downs as before.

 
Entry  Thu Jul 21 13:21:27 2022, Koji, General, Configuration, Windows laptop for WincamD Beam'R2 recovery IMG_1102.JPG
The Windows laptop for WincamD/Beam'R2 (DELL Vostro3300) was not functional. 
- Windows 7 got stuck in the starting up process (Google "startup repair loop")
- The battery can't charge and the adapter connection is flaky
Entry  Tue Jun 28 16:13:34 2022, Koji, General, General, The small optical table not small enough to get out IMG-5203.jpg
The table width was an inch too large compared to the door width. We need to tilt the table and it seemed too much for us. Let's ask the transportation
for handling.

Photo courtesy by Juan
Entry  Thu Jun 23 21:03:33 2022, Koji, Facility, General, Moving the small optical table to CAML (TCS Lab) PXL_20220624_035628602.jpg
I've cleared the small optical table and wondered how to move it out of the room. Fortunately, the north side of the big table had wide enough clearance
and let the 36" wide table go through. This was easy without moving other heavy stuff.

From here to the door, a bit of work is required. A possibility is to roll the laser blocking wall to the south side of the big table. This will
Entry  Fri Feb 5 07:40:37 2021, Stephen, Supply, General, OMC Unit 4 Build Machined Parts IMG_8117.JPG
OMC Unit 4 Build Machined Parts are currently located in Stephen's office. See image of large blue box from office, below.

Loaned item D1100855-V1-00-OMC08Q004
to Don Griffith for work in semi-clean HDS assy.
    Reply  Wed Jul 7 14:21:50 2021, Stephen, Supply, General, OMC Unit 4 Build Machined Parts IMG_9238.JPGIMG_9236.JPG
More explicit insights into the inventory for the Unit 4 build. Image of inventory included below.

Machined Parts:


New fabrication = Contents of Storage-11112 are consistent with
Entry  Sat Nov 21 13:58:30 2020, Koji, Electronics, Characterization, Dark Current Measurement for InGaAs QPDs Q3000_dark_current.pdf
Dark current measurement for InGaAs QPDs (OSI FCI-InGaAs-Q3000) has been done using Keithley 2450 and Frank's diode test kit. Frank's setup uses
various custom instruments which are no longer exist, therefore the kit was used only for switching between the segments.

The diodes were serialized as 81, 82, 83, 84, continuing the numbering for the OMC QPDs. The numbers are engraved at the side and the back of
    Reply  Sun Nov 22 13:49:12 2020, Koji, Electronics, Characterization, Impedance Measurement for InGaAs QPDs impedance_measurement.pdfP_20201121_183830.jpgimpedance_test.pdfQ3000_impedance_test.pdf
To know any anomaly to the junction capacitance of the QPD segments, the RF impedances were tested with a hand-made impedance measurement.
All segments look almost identical in terms of capacitance.

Measurement setup:
       Reply  Mon Nov 23 23:17:19 2020, Koji, Electronics, Characterization, The dark noise of the Q3000 QPDs Q3000_dark_noise_81.pdfQ3000_dark_noise_82.pdfQ3000_dark_noise_83.pdfQ3000_dark_noise_84.pdf
The dark noise levels of the four Q3000 QPDs were measured with FEMTO DLPCA200 low noise transimpedance amp.

The measurement has been done in the audio frequency band. The amp gain was 10^7 V/A. The reverse bias was set to be 5V and the DC output of
the amplifier was ~40mV which corresponds to the dark current of 4nA. It is consistent with the dark current measurement.
          Reply  Tue Nov 24 10:45:07 2020, gautam, Electronics, Characterization, The dark noise of the Q3000 QPDs 
I see that these measurements are done out to 100 kHz - I guess there is no reason to suspect anything at 55 MHz which is where this QPD will be reading
out photocurrent given the low frequency behavior looks fine? The broad feature at ~80 kHz is the usual SR785 feature I guess, IIRC it's got to do
with the display scanning rate.
             Reply  Tue Nov 24 12:27:18 2020, Koji, Electronics, Characterization, The dark noise of the Q3000 QPDs 
The amplifier BW was 400kHz at the gain of 1e7 V/A. And the max BW is 500kHz even at a lower gain. I have to setup something special to see the RF band
dark noise.
With this situation, I stated "the RF dark noise should be characterized by the actual WFS head circuit." in the 40m ELOG.
Entry  Fri Nov 20 18:51:23 2020, Koji, General, General, Instrument loan 
FEMTO DLPCA200 low noise preamp (brand new)

Keithley Source Meter 2450 (brand new) => Returned 11/23/2020

were brought to the OMC lab for temporary use.
Entry  Mon Nov 9 22:06:18 2020, Koji, Mechanics, General, 5th OMC Transport Fixture IMG_0211.jpgIMG_0221.jpg
I helped to complete the 5th OMC Transport Fixture. It was built at the 40m clean room and brought to the OMC lab. The fixture hardware (~screws) were
also brought there.
Entry  Fri Nov 6 18:38:00 2020, Koji, General, General, Powermeter lent from OMC Lab to 2um ECDL 
Thorlabs' powermeter controler + S401C head was lent from OMC Lab. Returned to OMC Jul 15, 2022 KA

https://nodus.ligo.caltech.edu:8081/SUS_Lab/1856
Entry  Fri Oct 23 19:09:54 2020, Koji, General, General, Particle counter transfered to Radhika 
See this entry: https://nodus.ligo.caltech.edu:8081/40m/15642
Entry  Fri Oct 9 01:01:01 2020, Koji, General, General, TFT Monitor mounting 20201008214515_IMG_0152.jpg20201008214519_IMG_0153.jpg20201008214536_IMG_0154.jpg20201008220955_IMG_0155.jpg20201008221019_IMG_0156_2.jpg
To spare some room on the optical table, I wanted to mount the two TFT monitor units on the HEPA enclosure frame.
I found some Bosch Rexroth parts (# 3842539840) in the lab, so the bracket was taken for the mount. This swivel head works very well. It's rigid
and still the angle is adjustable.
    Reply  Fri Oct 16 00:53:29 2020, Koji, General, General, TFT Monitor mounting 
The image flipping of the display unit was fixed. The vendor told me how to fix it.

- Open the chassis by the four screws at the side.
- Look at the pass-through PCB board between the mother and display boards.
Entry  Thu Oct 8 19:55:22 2020, Koji, General, Characterization, Power Measurement of Mephisto 800NE 1166A Mephisto800NE_1166A.pdf
The output of Mephisto 800NE (former TNI laser) was measured.
The output power was measured with Thorlabs sensors (S401C and S144C). The reference output record on the chassis says the output was 837mW at 2.1A
injection.
Entry  Fri Dec 13 14:59:18 2019, Stephen, General, General, OMC Beam Dump Production Cure Bake IMG_6080.JPGIMG_6079.JPG
[Koji, Jordan, Stephen]

The beam dumps, bonded on Fri 06 Dec 2019, were placed in the newly tuned and configured small dirty ABO at the Bake Lab on Fri 13 Dec 2019.

Images are shared and references are linked below
    Reply  Wed Dec 18 21:54:53 2019, Koji, General, General, OMC Beam Dump Production Cure Bake P_20191218_160650_vHDR_On.jpegP_20191218_160705_vHDR_On.jpegP_20191218_160733_003.jpeg
The beamdumps were taken out from the oven and packed in bags.

The bottom of the V are completely "wet" for 17 BDs among 20 (Attachment 1/2).

3 BDs showed insufficient glue or delamination although there is no sign of lack of rigidity. They were separated from the others in the pack.
       Reply  Mon Sep 28 16:03:13 2020, rana, General, General, OMC Beam Dump Production Cure Bake 

are there any measurements of the BRDF of these things? I'm curious how much light is backscattered into the incoming beam and how much goes
out into the world.

Maybe we can take some camera images of the cleaned ones or send 1-2 samples to Josh. No urgency, just curiosity.
          Reply  Mon Sep 28 16:13:08 2020, Koji, General, General, OMC Beam Dump Production Cure Bake 
According to the past backscatter test of the OMC (and the black glass beamdump: not V type but triangular type on a hexagonal-mount), the upper limit
of the back reflection was 0.13ppm. https://nodus.ligo.caltech.edu:8081/OMC_Lab/209

I don't have a BRDF measurement. We can send a few black glass pieces to Josh.
Entry  Mon Aug 10 15:53:46 2020, Koji, General, General, Lab status check 
Check-in to the OMC lab to see the status. Nothing seemed changed. No bug. The HEPA is running normal. The particle level was 0.

Went into the HEPA enclosure and put a cover on the OMC. Because of the gluing template, the lid could not be close completely (that's expected
and fine).
Entry  Mon Aug 10 15:34:04 2020, Koji, Facility, Loan / Lending, Glue bake oven 
Black and Decker Glue Baking Oven came back to the OMC lab on Aug 10, 2020, Georgia had lent the unit for the SAMS assembly/testing.
Entry  Thu Jul 31 15:07:53 2014, Koji, General, General, Item lending 
Tara: Laser Safety goggle -> Returned

Evan:
HP signal generator (990MHz) (prev. setting 32.7MHz / +3dBm)
    Reply  Fri Jan 30 19:31:08 2015, Koji, General, General, Item lending 
Gabriele:

PZT HV Amp

Evan:
       Reply  Tue Feb 3 18:23:49 2015, Koji, General, General, Item lending 
- The laser was removed and shipped to LHO today.

- UV illuminator / fused silica fiber light guide / UV power meter / UV face shield (Qty 2) will be shipped to MIT.
They are CIT properties except for the illuminator.
          Reply  Wed Feb 4 20:07:24 2015, Koji, General, General, Item lending C30140_1.JPGC30140_2.JPGC30141.JPGC30142.JPGC30143.JPG
Shipment to MIT (L. Barsotti, J. Miller)

1. UV Illuminator (LESCO Super Spot MK III)

2. UV Power meter (American Ultraviolet AIB1001) Caltech property C30140
             Reply  Tue Jul 21 20:20:12 2015, Koji, General, General, Item lending 
Kate (ATF)

- 4ch color oscilloscope (Tektronix)

- Chopper controller
                Reply  Fri Sep 9 14:34:31 2016, Koji, General, General, Item lending 
To 40m

First Contact Kit by Calum

Class A Kapton sheets
                   Reply  Thu Feb 27 14:31:13 2020, Koji, General, General, Item lending P_20200227_134755_vHDR_On.jpg
Item lending as per Ian's request: Particle Counter from OMC Lab to QIL

 
                      Reply  Mon Aug 10 15:29:54 2020, Koji, General, General, Item lending 
The particle counter came back to the OMC lab on Aug 10, 2020

 
Entry  Fri Dec 6 00:55:25 2019, Koji, Optics, General, Beamdump gluing 6x
[Stephen, Koji]

20 glass beamdumps were bonded at the 40m cleanroom.


Attachment 1: We had 20 fused silica disks with a V-groove and 40 black glass pieces
Entry  Tue Oct 22 15:54:59 2019, Koji, Electronics, Loan / Lending, Borrowed LB1005 from Cryo Cav 
From Cryo Cav setup

Borrowed LB1005 Servo box -> OMC

 
Entry  Tue Oct 22 11:56:09 2019, Stephen, Supply, General, Epoxy Status update as of 22 October 2019 image_ep30-2_epoxy_kit_pcs_item_1582_location_downs_3303.JPG
The following is the current status of the epoxies used in assembly of the OMC (excerpt from C1900052)

Re-purchasing efforts are underway and/or complete


DONE

Masterbond EP30-2 currently located in Downs 303, Modal Lab (see image)

( WILL EXPIRE JANUARY 2020
Entry  Tue Oct 22 11:52:53 2019, Stephen, General, General, Epoxy Curing Timeline of OMC PZT Assy #9 and #10 omc_elog_383_Epoxy_Curing_Timeline_of_OMC_PZT_Assy_20191022.pngomc_elog_383_Epoxy_Curing_Timeline_of_OMC_PZT_Assy.pptx
This post captures the curing timeline followed by OMC PZT Assys #9 and #10.

Source file posted in case any updates or edits need to be made.
Entry  Tue Oct 22 10:25:01 2019, Stephen, General, General, OMC PZT Assy #9 and #10 Production Cure Bake  OMC_ABO_PZT_Curing_Bake_effort_201906_thru_201909.xlsproduction_cure_bake_pzt_assys_9_and_10_20190927.png
OMC PZT Assy Production Cure Bake (ref. OMC elog 381) for PZT Assy #9 and #10 started 27
September 2019 and completed 28 September 2019. Captured in the below figure (purple trace). Raw data has been posted as an attachment as well.

We have monitored the temperature in two ways:
Entry  Mon Sep 23 21:29:51 2019, Koji, Optics, General, OMC(004): PZT sub-assembly gluing (#9/#10) IMG_8933.jpgIMG_8934.jpg
[Stephen, Shruti, Koji]

We worked on the gluing of the PZT sub-assy (#9 and #10) along with the designed arrangement by Shruti (OMC
ELOG 374).
    Reply  Mon Sep 30 23:16:53 2019, Koji, Optics, General, OMC(004): PZT sub-assembly gluing (#9/#10) IMG_8950.jpegIMG_8953.jpegIMG_8954.jpegIMG_8955.jpeg
Friday: [Stephen, Koji]

As the oven setting has qualified, we brought the PZT assys in the air bake oven.

Monday: [Stephen, Shruti, Koji]
Entry  Thu Sep 26 17:33:52 2019, Stephen, General, General, Dirty ABO test run prior to PZT Subassembly Bonding - ABO is Ready! image_showing_20190924_abo_qualifying_bake.png
Follow up on OMC elog 379

I was able to obtain the following (dark blue) bake profile, which I believe is adequate for our needs.

The primary change was a remounting of the thermocouple to sandwich it between two stainless steel masses. The thermocouple bead previously was
Entry  Tue Sep 24 12:19:20 2019, Stephen, General, General, Dirty ABO test run prior to PZT Subassembly Bonding  image_showing_20190923_abo_qualifying_bake.png
The 40m Bake Lab's Dirty ABO's OMEGA PID controller was borrowed for another oven in the Bake Lab (sound familiar? OMC
elog 377), so I have had to play with the tuning and parameters to recover. This bake seemed to inadequately match the intended temperature profile
for some reason (intended profile is shown by plotting prior qualifying bake for comparison). 
Entry  Wed Sep 18 23:38:52 2019, Stephen, General, General, Dirty ABO ready for PZT Subassembly Bonding index.png
The 40m Bake Lab's Dirty ABO's OMEGA PID controller was borrowed for another oven in the Bake Lab, so I have had to play
with the tuning and parameters to recover a suitable bake profile. This bake is pictured below (please excuse the default excel formatting).
Entry  Wed Sep 18 23:16:06 2019, Stephen, Supply, General, Items staged at 40m Bake Lab for PZT Subassembly Bonding IMG_5216.JPGIMG_5215.JPG
The following items are presently staged at the 40m Bake Lab (see photo indicating current location) (noting items broght by Koji as well):


Bonding fixtures, now modified with larger washers to constrain springs, and with modification from OMC
elog 358.
Curved Mirrors and Tombstones as selected by Shruti in OMC elog 374.
PZTs
Entry  Wed Sep 18 22:30:11 2019, Stephen, Supply, General, EP30-2 Location and Status IMG_5217.JPG
Here is a summary of the events of the last week, as they relate to EP30-2.

1) I lost the EP30-2 syringes that had been ordered for the OMC, along with the rest of the kit.


Corrective action: Found in the 40m Bake Lab garbing area.
Preventative action: log material moves and locations in the OMC
Entry  Thu Sep 5 15:40:42 2019, shruti, Optics, Configuration, PZT Sub-Assembly Diagrams_SubAssembly.pdfC10_C13_Combinations.pdfPlots_Config_Tolerance.pdf
Aim: To find the combinations of mounting prism+PZT+curved mirror to build two PZT sub-assemblies that best minimises the total vertical beam
deviation.

(In short, attachment 1 shows the two chosen sets of components and the configuration according which they must be bonded
to minimize the total vertical angular deviation.)
Entry  Thu Jan 10 18:37:50 2013, Koji, Optics, Characterization, Wedging of the PZTs PZT_wedging.pdf
Yesterday I measured the thickness of the PZTs in order to get an idea how much the PZTs are wedged.
For each PZT, the thickness at six points along the ring was measured with a micrometer gauge. 
The orientation of the PZT was recognized by the wire direction and a black marking to indicate the polarity.
    Reply  Thu Aug 22 12:35:53 2019, Stephen, Optics, Characterization, Wedging of the debonded PZTs 2019 August IMG_4775.JPGIMG_4770.JPG
Wedge and thickness measurements of PZTs 12 and 13 took place after debonding and cleaning - results are shown in the first image (handwritten post-it
format).

These thickness measurements seem to have come back thinner than previous measurements. It is possible that I have removed some PZT material
       Reply  Thu Aug 29 11:51:49 2019, shruti, Optics, Characterization, Wedging of the debonded PZTs - Calculation PZT_Wedging_Results.pdfPZT_Wedging_Calc.pdf
Using the measurements of PZTs 12,13 taken by Stephen, I estimated the wedging angle and orientation following Section 2.3.1 of T1500060. The results
can be found in Attachment1 and is summarised as follows.

For PZT 12, PZT 13 respectively:
Entry  Fri Aug 23 11:11:44 2019, shruti, Optics, Characterization, Finding the curvature bottom CircleFit.pdfSineFit.pdf
I attempted to fit the data taken by Koji of the beam spot precession at the CCD in order to find the location of the curvature bottom in terms
of its distance (d) and angle () from the centre of the mirror. This was done using
the method described in a previous similar measurement  and Section 2.1.3 of 
Entry  Mon Jul 1 12:49:42 2019, Koji, Optics, Characterization, Scattering measurement of A and C mirrors omc_cm_tis_062419.pdfomc_prism_tis_062419.pdf
Liyuan's scattering measurement for the A and C mirrors.
Entry  Mon Jul 1 12:38:49 2019, Koji, Optics, Characterization, A and M prisms perpendicularity measurement 6x
[Stephen, Koji]

The perpendicularity of some of the A and M prisms were tested.

Results
Entry  Mon Jun 24 12:54:58 2019, Koji, Clean, General, HEPA BOOTH 
https://www.airscience.com/purair-flow-laminar-flow-cabinets
Entry  Tue May 28 12:14:20 2019, Stephen, Optics, General, CM PZT Assembly Debonding of EP30-2 in Acetone 8x
[LiyuanZ, StephenA]

Downs B119

Summary: Beginning on 20 May 2019, two CM PZT assemblies were soaked in Acetone in an effort to debond the EP30-2 bonds
Entry  Thu May 23 23:27:38 2019, Koji, Optics, Characterization, IGHQEX3000 high power test HQEPD_high_power_test.pdfpd_images.png
LaserComponents IGHQEX3000 (Cage B2: Serial# B1-23) was exposed to the beam with the optical power from 1.6mW to 332mW. 
After each illumination, the dark current and the dark noise level were measured. Also the photo image of the PD surface was taken each time.

- No significant change of the dark current after each illumination.
Entry  Thu May 23 01:42:46 2019, Koji, Optics, Characterization, C30665 high power test C30665_high_power_test.pdfpd_surface.jpg
An Excelitas C30665 PD with the cap removed (SN07 in Case H slot #2) was exposed to the beam with the optical power of 1.4mW to 334mW. 
After each illumination, the dark current and the dark noise level were tested. Also the photo image of the PD surface was taken each time.

- No significant change of the dark current after each illumination.
Entry  Mon May 20 19:53:17 2019, Koji, Optics, Configuration, DCPD high power test BIAS.pdfP_20190520_204822.jpg
We want to perform a damage test of OMC DCPDs with high power beam. The OMC DCPD is the 3mm InGaAs photodiodes with high quantum efficiency, delivered
by Laser Components.
The sites want to know the allowed input power during the OMC scan for beam mode analysis. The nominal bias voltage of the PDs is +12V. Therefore,
    Reply  Wed May 22 07:31:37 2019, Koji, Optics, Configuration, Camera test (DCPD high power test) 20190521201838_IMG_7939_2.jpg
C30665 (3mm) camera test. The camera was Canon PowerShot G7X MkII. Exposure 1/15s, F 5.6, ISO 125, MF (~the closest), no zoom.
This image was taken before the beam illumination. Will tune the green lighting to have some gradient on the surface so that we can see any deformation
of the surface.
Entry  Thu May 16 12:41:28 2019, Chub, General, General, fire pillow found on optics table 
That is an expanding fire pillow, also known as firebrick.  It is used to create a fire block where holes in fire-rated walls are made and prevents
lab fires from spreading rapidly to adjacent labs.  I had to pull cable from B254 to our labs on either side during a rather narrow window of time. 
Some of the cable holes are partially blocked, making it difficult to reach the cable to them. The cable is then just guided to the hole from a distance. 
Entry  Wed May 15 19:07:53 2019, Koji, Clean, General, What is this??? P_20190515_185602.jpgP_20190515_185844.jpg
Suddenly something dirty emerged in the lab. What is this? It looks like an insulation foam or similar, but is quite degraded and emits a lot of particulates.

This does not belong to the lab. I don't see piping above this area which shows broken insulation or anything. All the pipes in the room
are painted white.
Entry  Thu May 9 18:10:24 2019, Koji, Optics, Characterization, OMC(004): Spot position scan / power budget 190508.pngscattering_spots_CM1.png
(Now the CCD image is captured as a movie and the screen capture is easier!)

Various spot positions on CM1 and CM2 were tried to test how the transmission is dependent on the spot positions. CM1 has a
few bright spots while CM2 shows very dark scattering most of the case. Attachment 1 is the example images of one of the best alignment
Entry  Thu May 9 17:35:07 2019, Koji, Optics, General, Alignment strategy T1500060_OMC_Optical_Testing_Procedure.pdf
Notes on the OMC cavity alignment strategy

- x3=1.17 γ + 1.40 δ, x4=1.40 γ + 1.17 δ
- This means that the effect of the two curved mirrors (i.e. gouy phases) are very similar. To move x3 and x4 in common is easy, but to do differentially
Entry  Thu May 9 16:07:18 2019, Stephen, Mechanics, General, Improvements to OMC Bonding Fixture image_of_issue_with_OMC_PZT_bonding_fixture_from_D16003336-v3.pngimage_02_of_issue_with_OMC_PZT_bonding_fixture_from_D16003336-v3.PNG
[Stephen, Koji]

As mentioned in eLOG 331, either increased thermal cycling or apparent improvements
in cured EP30-2 strength led to fracture of curved mirrors at unintended locations of bonding to the PEEK fixture parts.
Entry  Wed May 1 15:40:46 2019, Koji, Optics, Characterization, OMC(004): Spot positions and the scattering misalignment.pdf
Tried a few things.

1. Replaced CM1 (PZT ASSY #10=M21+PZT#22+C12) with PZT ASSY #7 (=M1+PZT#13+C13)

We tried PZT ASSY #7 at the beginning and had the spots at almost at the top edge of the curved mirrors. As we found a particle on the bottom
    Reply  Fri May 3 11:06:28 2019, Koji, Optics, Characterization, OMC(004): Spot positions and the scattering misalignment.pdf
Experiment on 5/1
- CM1 right knob was moved 1div (10um) backward such that the spots were better centered on the mirrors 
FM1 (A5): h=-0.2mm -> 0.4mm made the spot much darker but still it has a few scattering spots.
Entry  Thu Apr 25 15:05:19 2019, Joe, Optics, Characterization, Looking at PZT HOM spacing dependance and thinking about workflow 
[koji, joe]

The template or glass breadboard was wobbling, and we noticed that the caivty alignment became worse/better when it was pressed down. We saw
that it was the glass breadboard, so it was fixed into the transport fixture more securely. Now its alignement didn't change when it was pressed down.
Entry  Wed Apr 24 13:58:51 2019, Joe, Optics, Characterization, OMC power budget and UV Epoxy Bonding of BS1 
[koji,philip,joe,liyuan,stephen]

need to add spot positions.

Mirrors: PZT11,PZT22, A14, A5
Entry  Tue Apr 23 10:21:12 2019, Joe, Optics, Configuration, Moving the spots to the centre of the curved mirrors FSR_detuned_locking.pdfCM1_IMG_7702.JPGCM2_IMG_7704.JPG
[Koji,Philip, Liyuan, Joe]

CM1:

We moved the curved mirrors to these positions:
Entry  Mon Apr 22 09:54:21 2019, Joe, General, , Shortening cavity (A5,A14,PZT11,PZT22) to get closer to design FSR CM1_IMG_7699.jpgCM2_IMG_7697.jpg
[Koji,Joe,Philip,stephen]

in units 20um per div on the micrometer [n.b. we reailised that its 10um per div on the micrometer]

CM1 inner screw pos: 11.5
    Reply  Mon Apr 22 19:54:28 2019, Koji, General, , OMC(004): Spot positions at the end of Apr 22nd misalignment4.pdf
 