40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  OMC elog, Page 1 of 13  Not logged in ELOG logo
ID Datedown Author Type Category Subject Text Attachments
  624   Mon Sep 18 15:09:55 2023 Thejas OpticsCAvity BondingPiezo inertial micromatersNew piezo actuated micrometers from thorlabs
arrived last week. 

4 x MPIA10
  
  623   Mon Sep 18 15:08:26 2023 Thejas OpticsGeneralOMC HEPA enclosure filter fan speedI went in lab today and turned the HEPA
filter (clsoe to the entrance) to high since
we are not doing any measurements at the
  
  622   Thu Sep 14 14:26:51 2023 Camille MakaremElectronicsCharacterizationRemaining PZT testsPZTs 31, 32, 35, 40 and 45 have had their
DC responses measured (pre-reliability test)
and have been through the reliability test
  
  621   Wed Aug 30 12:38:52 2023 Thejas OpticsGeneralA+ OMC #1: HOM spectrumExamination into bonding template confimred
the limitation of space available to
change cavity length by at least 10 mm to
  
  620   Tue Aug 29 16:54:46 2023 KojiFacilityGeneralLED Strip installed[JC, Koji]

We've installed the LED strips
on the HEPA frame. We tried not to touch
 PXL_20230829_232310007.jpgPXL_20230829_232345702.MP.jpgPXL_20230829_232317162.jpg 
  619   Fri Aug 25 22:01:29 2023 KojiFacilityGeneralLED Strip installation planHere are the dimensions of the LED strips
and their gaps.
 LED_Strip.pdf 
  618   Thu Aug 24 16:09:46 2023 Camille MakaremOpticsGeneralPZT length-to-angle coupling[Camille, Thejas]

We checked the length-to-angle coupling
 PZT2.jpgPZT1.jpg 
  617   Thu Aug 24 12:30:58 2023 Camille Makarem, Thejas OpticsCharacterizationFSR and TMS analysisAttached are the analysis results from
the measurements in 616.
FSR: 264.657354 +/- 0.003444 MHz
 TMS.PNGHOM_scan.pdfFSR_Scan_FitFSR_TF_22-08-2023_160812.pdf 
  616   Wed Aug 23 07:48:14 2023 Camille Makarem, TejasOpticsCharacterizationFSR and TMS measuarement of A+ build[Camille, Thejas]
22 August 2023
 test_22-08-2023_165728.pdftest_22-08-2023_170543.pdfFSR_CavityLength.PNG 
  615   Tue Aug 22 15:51:15 2023 KojiGeneralGeneralInventory: C30655 PDsDuring the OMC(004) assembly, the stock
situation for Excelitas C30655 PDs was checked.

PD Cage H
  
  614   Tue Aug 22 10:25:10 2023 ThejasOpticsCharacterizationcavity realignment and new power measurementsThanks Koji, we did observe this discrepency
and thought that the code normalizes the
power/voltage readings to the reference power
  
  613   Mon Aug 21 16:15:09 2023 KojiOpticsCharacterizationcavity realignment and new power measurementsYou should proceed to the next steps. You'll
need to repeat the power measurements before
the bonding. Next time, the measurement procedure
  
  612   Mon Aug 21 16:05:07 2023 Camille MakaremOpticsCharacterizationcavity realignment and new power measurementsThanks for clarifying that. We will repeat
some power measurements and check the output
offset voltage to the laser.
  
  611   Mon Aug 21 15:02:32 2023 KojiOpticsGeneralcavity realignment and new power measurementsThis is WOW!

Excellent mode matching work.

The measurement is still
  
  610   Mon Aug 21 07:59:40 2023 Camille MakaremOpticsGeneralcavity realignment and new power measurements[Camille, Thejas]
18 August 2023
 6x 
  609   Thu Aug 17 09:06:51 2023 Camille MakaremOpticsGeneralrealignment of beam path through mode-matching lenses[Camille, Thejas]
16 August 2023
 irises.PNG 
  608   Thu Aug 17 07:57:12 2023 Camille MakaremOpticsGeneralmode-matching in the cavity[Camille, Thejas, Koji]
16 August 2023
  
  607   Tue Aug 15 16:15:13 2023 Camille MakaremOpticsGeneralnew power measurements (after cleaning)[Camille, Thejas, Masayuki]

This afternoon we finished the realignment
 REFL_CCD.PNGPowerBudgetAnalysis.PNGipad_notes.PNGSpotPositions.PNG 
  606   Mon Aug 14 14:13:34 2023 Camille MakaremOpticsGeneralmode-mismatch in the cavityFor Set 1 of the data in https://nodus.ligo.caltech.edu:8081/OMC_Lab/604,

VREFL(unlocked) = 3.226V
VREFL(locked) = 0.13V
  
  605   Mon Aug 14 07:52:11 2023 Camille MakaremOpticsGeneral2nd cleaning of the cavity optics[Camille, Thejas]
11 August 2023
  
  604   Fri Aug 11 10:42:05 2023 Camille MakaremOpticsCharacterizationpower budget measurements[Camille, Thejas]
10 August 2023
 1000006624.jpgPowerMeasurments_10Aug2023.PNG 
  603   Thu Aug 10 12:33:42 2023 Camille MakaremOpticsGeneraloptimizing the cavity post-cleaning[Camille, Thejas]

This morning, we continued the efforts
 REFL_CCD.PNGCM1_Ap16.pngCM2_Ap8.pngFM1_Ap16.pngFM2_Ap8.png 
  602   Wed Aug 9 17:00:52 2023 Camille MakaremOpticsGeneralcleaning the cavity optics[Camille, Thejas]

We inspected surfaces of the cavity
  
  601   Wed Aug 9 07:47:21 2023 Camille, ThejasOpticsGeneralsteering the beam spot on the curved mirrors[Camille, Thejas, Masayuki]
8 August 2023
 7x 
  600   Tue Aug 8 10:42:11 2023 ThejasOpticsGeneralsteering the beam spot on the curved mirrorsThe spots look quite bright on the CMs,
we need to move the spots towards the center
of the mirorrs to avoid scatter points.
  
  599   Tue Aug 8 09:38:14 2023 KojiOpticsGeneralREFL CCD imageIt has a higher-order mode, but you can
still extract TEM00 from this beam.
e.g., See a past reflection image
  
  598   Tue Aug 8 07:39:17 2023 Camille MakaremOpticsGeneralsteering the beam spot on the curved mirrors[Camille, Thejas]
7 August 2023
 CM1_initial.jpgCM2_initial.jpgCM1_AfterAdjustment.jpgCM2_AfterAdjustment.jpg 
  597   Tue Aug 8 07:30:49 2023 Camille MakaremOpticsGeneralREFL CCD image[Camille, Thejas]
7 August 2023
 IMG_0301(1).jpg 
  596   Mon Aug 7 16:01:05 2023 KojiGeneralGeneralOMC (004): Production completedOMC (004) Production completed. The OMC
together with the transport fixture is still
placed at the 40m clean room.
 PXL_20230807_210716110.jpgPXL_20230807_210724685.jpg 
  595   Mon Aug 7 16:00:30 2023 KojiGeneralGeneralOMC (004): Cable installation The writing of this elog is still on going

[Dean, Stephen, Koji]

4th
 IMG_3546.jpgIMG_3547.jpgIMG_3564.jpgIMG_3571.jpg 
  594   Mon Aug 7 08:51:56 2023 Camille MakaremOpticsGeneraloptimizing reflected signalWe will plan to look at the reflection
CCD image this afternoon.

  
  593   Mon Aug 7 08:37:59 2023 KojiOpticsGeneraloptimizing reflected signalWith the current level of the mode
matching, the spot positions can be optimized.
I'd work on it first as the mirror RoC
  
  592   Mon Aug 7 07:40:33 2023 Camille MakaremOpticsGeneraloptimizing reflected signal[Camille, Thejas] 4 August 2023

-REFL PD signal (unlocked): 3.5V
  
  591   Mon Aug 7 07:36:09 2023 Camille MakaremGeneralGeneralparticle count[Camille, Thejas]

We lowered the setting to MEDIUM on
  
  590   Thu Aug 3 15:24:28 2023 KojiOpticsGeneralA+OMC mode-matching efficiencyThe amount of the reflected beam is a function
of the mode matching and the cavity loss.
  
  589   Thu Aug 3 15:15:29 2023 ThejasOpticsGeneralA+OMC mode-matching efficiencyThe cavity falls out
of lock very often when subjected to slight
movements of objects on the optic table.
 PDrefl_signal.jpeg 
  588   Thu Aug 3 15:04:26 2023 StephenGeneralGeneralaLIGO Unit 4 Build, Cable Routing, Preparation[Dean, Stephen]

Unit #4 aLIGO OMC unit
was transported to the 40m Bake Lab.
 cable_routing_20230803_IMG_3527.jpg 
  587   Thu Aug 3 10:31:55 2023 ThejasOpticsGeneralA+ OMC build: beam spot positions 




 spot_pos_OMC.pdfsubass#37.pdfScreenshot_2023-08-04_at_00.39.11.pngScreenshot_2023-08-04_at_00.39.24.pngsubass#48.pdf 
  586   Thu Aug 3 09:42:36 2023 ThejasOpticsGeneralOMC Lab HEPA air filter noise Koji mentioned that previously sarisfactory
particle count was not acheived with the
Med/Med HEPA filter setting once the enclosure
  
  585   Thu Aug 3 07:22:19 2023 Camille MakaremGeneralGeneralparticle count and cavity optimization/alignmentYesterday, we measured the particle count
in the enclosure to ensure that the lower
setting on one of the HEPAs is still acceptable.
  
  584   Wed Aug 2 07:32:28 2023 Camille Makarem, Thejas OpticsGeneralSetting up electronics and locking the cavity[Camille, Thejas, Masayuki, Koji]

Previously, we were using the function
generator to drive the laser without using
  
  583   Tue Aug 1 11:04:13 2023 Camille MakaremGeneralGeneralreoptimizing cavity alignment before locking[Camille, Thejas]
We rechecked the alignment this morning
and re-optimized the resonance a bit. There
  
  582   Mon Jul 31 13:19:14 2023 Camille MakaremGeneralGeneralplans for this week 31 July 2023Plans for this week:
1) Verify electronics setup for cavity
locking.
 4ae4ed99-007e-4246-85b6-fadccc5ba19d.mp4 
  581   Sat Jul 29 12:05:52 2023 Thejas OpticsGeneralA+ OMC unit 1 build: Resonance achieved [Camille, Thejas]

Steps followed to acheive this
resonance:
  
  580   Wed Jul 26 15:01:26 2023 Madeline LesovskyOpticsGeneralSubassembly Bonding Effort - Oven Bake Profile ResultsThe bonding efforts were conducted on Thursday,
July 13, 2023 (https://nodus.ligo.caltech.edu:8081/OMC_Lab/561)

The duration of the air bake in
 OMC_Bonding_12_07_2023_Rampup.PNGOMC_Bonding_12_07_2023_Soak.PNGOMC_Bonding_12_07_2023_Rampdown.PNGOMC_Bonding_12_07_2023_Truncated.xlsx 
  579   Wed Jul 26 12:14:53 2023 Camille MakaremOpticsConfigurationSwapping Subassemblies While using mirror SN14 and mirror SN30
for CM1 and CM2 respectively, we monitored
the two beam spots on FM2 and continued to
  
  578   Tue Jul 25 23:39:07 2023 ThejasOpticsGeneralA+ OMC unit 1: CM positions swappedWith CM #30 at CM1 position and CM #14
at CM2 postion, when the beam spot on the
CM1 is a little lower than the central line
  
  577   Tue Jul 25 11:03:13 2023 ThejasOpticsGeneralA+ OMC Unit 1 Cavity BuildThis readjustment to the input beam involved
adjusting the persicope mirorrs and sterring
mirror. We estimate that this will have changed
  
  576   Mon Jul 24 17:43:25 2023 KojiOpticsGeneralA+ OMC Unit 1 Cavity BuildThanks Koji




  
  575   Mon Jul 24 17:39:06 2023 ThejasOpticsGeneralA+ OMC Unit 1 Cavity Build7/24/23

The cavity input was re-adjusted
to make sure the beam was parallel to the
  
ELOG V3.1.3-