  462   Mon Nov 21 19:13:35 2022 KojiGeneralGeneralTransmission measurement (2nd deep cleaning of OMC #1)OMC Transmission measurement after
the 2nd deep cleaning

The 2nd deep cleaning didn't
 PXL_20221122_030736513.jpgOMC_loss.pdf 
  461   Fri Nov 18 18:41:05 2022 Camille MakaremGeneralGeneral2nd deep cleaning of OMC #1The four cavity mirrors in OMC #1 were
each scrubbed using acetone and a cotton
swab.
 PXL_20221118_213955948.jpg 
  460   Thu Nov 17 19:50:00 2022 KojiOpticsCharacterizationConclusion on the cleaning of OMC #001Conclusion on the cleaning of OMC
#001

- After a couple of first contact
 OMC_loss.pdf 
  459   Thu Nov 17 18:56:22 2022 KojiOpticsGeneral Transmission measurements of OMC #1 after deep cleaning[Camille, Koji]

- Removed the first contact we
left on Monday.
 PXL_20221117_232145418.jpgScreen_Shot_2022-11-17_at_19.02.31.png 
  458   Tue Nov 15 11:12:24 2022 KojiOpticsGeneralOMC #1 fogging on the AR side of BS1 cleaned[Camille, Koji]

Photo of the BS1 AR cleaning process

Attachment 1: Before cleaning.
 PXL_20221114_225338114.jpgPXL_20221114_232824245.jpgPXL_20221114_233714774.jpgPXL_20221114_233748631.jpg 
  457   Tue Nov 15 10:58:53 2022 KojiOpticsGeneralOMC #1 damaged black glass removal[Camille, Koji]

The damaged black glass was removed
from the OMC breadboard leaving the glass
 PXL_20221114_222641455.jpgPXL_20221114_222544330.jpgPXL_20221114_222555849.jpgPXL_20221114_233748631.jpg 
  456   Tue Nov 15 07:46:58 2022 Camille MakaremOpticsGeneralcleaning OMC #1Monday, November 14, 2022

Camille and Koji did a "deep
cleaning" of OMC#1:
  
  455   Mon Nov 14 09:27:13 2022 KojiOpticsCharacterizationtransmission measurements through OMC #1 (before cleaning)The measured total optical loss of the
OMC was

1st:   0.015 +/- 0.003
 OMC_Powerbudget.xlsx 
  454   Mon Nov 14 08:34:45 2022 CamilleOpticsCharacterizationtransmission measurements through OMC #1 (before cleaning)[Camille, Koji]

Friday, Nov 11th, 2022

Setting up OMC #1 for transmission
 PXL_20221111_200942943.jpgPXL_20221111_200957951.jpg 
  453   Fri Nov 11 19:07:48 2022 KojiSupplyGeneralSupply OrderClean Supply Ordered


TexWipe TX8410 AlphaSat
Vectra Alpha 10 50 sheets x 12 pk  (VWR
  
  452   Mon Nov 7 22:00:33 2022 KojiOpticsConfigurationSetting up the fiber couplersFiber matching: 43.2/56.7 = 76%
S/P-pol ratio 0.7/43.2 = 1.6%

 
  
  451   Mon Nov 7 21:16:16 2022 CamilleOpticsConfigurationSetting up the fiber couplers[Camille, Koji]

Began setting up fiber assembly
for OMC testing:
 PXL_20221108_003849213.jpgPXL_20221108_003909265.jpgPXL_20221108_003929309.jpg 
  450   Mon Sep 26 14:27:49 2022 KojiGeneralGeneralLLO OMC ICS workOMC
#001


ICS Link: https://ics.ligo-la.caltech.edu/JIRA/browse/ASSY-D1201439-1
Already
  
  449   Tue Sep 20 08:54:33 2022 KojiGeneralGeneralPD cage arrangementUpon the LLO work, the current PD arrangement
in the cages are:
CAGE B
  
  448   Fri Aug 26 22:29:02 2022 KojiGeneralGeneralTool Shipping PrepShipping preparation for the LLO
trip

Started
July 15, 2022 and finished Aug 30. So it
 PXL_20220831_025623318.jpgPXL_20220831_024518032.jpgPXL_20220831_030234581.jpg 
  447   Thu Aug 25 20:05:00 2022 KojiGeneralGeneralLLO OMC #001 Ballast Mass investigationHere is the balance mass info for the LLO
OMC#001 analyzed from the photographs


Added masses are: 50+10g,
 balance_mass_config_LLO.pdf 
  446   Thu Aug 25 14:22:08 2022 KojiGeneralGeneralLLO OMC #001 Ballast Mass investigationInspected the past LLO add-on mass configuration.

There are unknown masses at the
DCPD side. It looks like a small SS mass
 DSCN0917.JPGDSCN0922.JPGP6108705.JPGP6108707.JPGP6108706.JPG 
  445   Wed Aug 24 11:29:47 2022 KojiGeneralGeneralOMC #002 ready for shipment[Stephen Koji]

The OMC #002 is ready for
shipment.
 IMG_1207.JPGPXL_20220825_004259850.jpgPXL_20220825_004307204.jpgPXL_20220825_005423342.jpgPXL_20220825_005549985.jpg 
  444   Wed Aug 24 03:26:43 2022 KojiGeneralGeneralOMC #002 Delamination repair Part2 (3)Inspection

 
 8x 
  443   Wed Aug 24 03:20:59 2022 KojiGeneralGeneralOMC #002 Delamination repair Part2 (2)Bonding  11x 
  442   Wed Aug 24 02:57:43 2022 KojiGeneralGeneralEP30-2 bonding setupEP30-2 bonding setup  IMG_1178.JPGIMG_1179.JPGIMG_1180.JPG 
  441   Wed Aug 24 02:53:46 2022 KojiGeneralGeneralOMC #002 Delamination repair Part2 (1)Inspection of the delaminations in the
optics side
 IMG_1168.JPGIMG_1169.JPGIMG_1170.JPGIMG_1171.JPGIMG_1175.JPG 
  440   Wed Aug 24 02:51:23 2022 KojiGeneralGeneralOMC #002 Delamination repair Part1 (3)Inspection of the bonding on the
suspension interface side. All look good.
 8x 
  439   Mon Aug 15 22:49:03 2022 KojiGeneralGeneralOMC #002 Delamination repair Part1 (2)EP30-2
preparation


Two Al foil cups + A sheet
 7x 
  438   Mon Aug 15 22:43:35 2022 KojiGeneralGeneralOMC #002 Delamination repair Part1 (1)[Stephen Koji]

Checked the delamination
status:
 IMG_1926.JPGPXL_20220816_011346581.jpg 
  437   Mon Aug 15 22:06:18 2022 KojiGeneralGeneralOMC #002 new cable tie installed[Stephen Koji]

New cable ties were installed on
the cable pegs attached to the long sides
 IMG_1929.JPGIMG_1930.JPG 
  436   Mon Aug 15 21:31:56 2022 KojiGeneralGeneralOMC #002 Cable bracket replacement (6) The cable bracket was successfully
replaced.


Looking from the QPD side
 IMG_1155.JPGIMG_1149.JPGIMG_1150.JPG 
  435   Thu Aug 11 15:24:57 2022 KojiGeneralGeneralOMC #002 Cable bracket replacement (5)- The hole size extension
is going forwared now.
  
  434   Wed Aug 10 18:42:27 2022 KojiGeneralGeneralOMC #002 Cable bracket replacement (4)[Stephen Koji]

Now we got the C&Bed parts
to continue to work on the cable bracket
 PXL_20220809_235457354.jpgPXL_20220811_011910569.jpgPXL_20220811_013746139.jpg 
  433   Thu Jul 28 00:46:47 2022 KojiGeneralGeneral Subject: OMC #002 Cable bracket replacement (3)Checking the spare parts 

- Conclusion for OMC#2:
need PEEK cable
 IMG_1137.JPGIMG_1148.JPGIMG_1138.JPG 
  432   Thu Jul 28 00:28:15 2022 KojiGeneralGeneral OMC #002 Cable bracket replacement (2) Connector
unmounting

- (Attachment 1)
 IMG_1132.JPGIMG_1133.JPGIMG_1136.JPG 
  431   Wed Jul 27 23:52:18 2022 KojiGeneralGeneralOMC #002 Cable bracket replacement (1)Parts
check

- D1300052-V3 SN001 is going to
 IMG_1126.JPGIMG_1135.JPGIMG_1127.JPGIMG_1129.JPGIMG_1130.JPG 
  430   Wed Jul 27 10:34:30 2022 KojiGeneralGeneralOMC #002 Protective FirstContact PaintThe optical surfaces were coated with FirstContact
to keep them clean / somewhat protected during
the transportation.
 IMG_1125.JPG 
  429   Wed Jul 27 10:34:09 2022 KojiGeneralGeneralHigh QE PD: QE measurements 2- DLPCA-200 trans-impedance amplifier was
calibrated.
  Keithley source meter 2450
 IMG_1119.JPGIMG_1120.JPG 
  428   Wed Jul 27 10:09:51 2022 KojiGeneralGeneral4+4 wire clamp in handRegarding: D1200971

- 4 CLASS A wire clamp obtained
 PXL_20220727_072154009.jpg 
  427   Tue Jul 26 00:12:58 2022 KojiGeneralGeneralHigh QE PD: QE measurements- Installed the High QE PDs to OMC #002


B1-22@Cage B1 was
installed to the transmission DCPD
B1-23@Cage
 IMG_1118.JPG 
  426   Tue Jul 26 00:01:59 2022 KojiGeneralGeneralOMC #002 delamination check 2More epoxy delamination check:

DCPD R (Attachment 1):
Found half delaminated
 IMG_1106.JPGIMG_1107.JPGIMG_1110.JPG 
  425   Mon Jul 25 18:25:04 2022 KojiGeneralGeneralA/C Filter was replaced
New filter PN
Grainger
TK70457312T Mini-Pleat Air Filter,
  
  424   Fri Jul 22 17:47:38 2022 KojiGeneralGeneralC&B request for the reinforcement blocksOMC Reinforcement blocks

1. P/N D1600316; Version v4; Type
01; Qty 30; Source Chemistry Machine Shop
 PXL_20220722_222013127.jpg 
  423   Fri Jul 22 17:41:01 2022 KojiGeneralGeneralSRS LCR meter SRS720 returned to DownsSRS LCR meter SRS720 was returned to Downs
as before.

 
 PXL_20220723_002330805.jpg 
  422   Fri Jul 22 00:31:17 2022 KojiGeneralGeneralOMC #002 backscatter measurementMeasure the power ratio between the forward-propagating
and reverse-propagating beams.


Place a small deflecting
 OMC_backscatter.pdf 
  421   Thu Jul 21 17:47:00 2022 KojiGeneralGeneralThe profile of the beam incident on the fiber input couplerThe profile of the beam incident on the
fiber input

The fiber input was deflected by
 fiber_beam_profile.pdf 
  420   Thu Jul 21 14:55:48 2022 KojiGeneralGeneralOptics bonding for the backscatter measurementThe backscatter beam is supposed to appear
in the backpropagation path. The transmission
of the OMC has a couple of optics, it's
 IMG_1098.JPG 
  419   Thu Jul 21 14:35:35 2022 KojiGeneralGeneralBond reinforcement blocks for the invar bracketsBond reinforcement blocks for the
invar brackets:


Attachment 1:
 IMG_1095.JPGIMG_1091.JPG 
  418   Thu Jul 21 13:21:27 2022 KojiGeneralConfigurationWindows laptop for WincamD Beam'R2 recoveryThe Windows laptop for WincamD/Beam'R2
(DELL Vostro3300) was not functional. 
- Windows 7 got stuck in the starting
 IMG_1102.JPG 
  417   Thu Jul 21 02:55:06 2022 KojiGeneralGeneralOMC #002 Power Budget after mirror cleaningo Power Budget after FirstContact
cleaning (2022/07/20)
NPRO ADJ -50 (min)
  
  416   Tue Jul 19 03:17:56 2022 KojiGeneralGeneralOMC #002 Power Budget before mirror cleaningo Power Budget (2022/07/18)
NPRO ADJ -50 (min)
Fiber incident 62.8mW
  
  415   Mon Jul 18 14:20:09 2022 KojiGeneralGeneralOMC #002 Plan Portal==
Initial Preparation ==


[Done] OMC #002
  
  414   Fri Jul 15 22:14:14 2022 KojiGeneralGeneralOMC Lab recovery for the OMC #002 test- The lab is chilly (18degC)

- Cleaned the lab and the optical
table a bit so that the delicate work can
 PXL_20220716_035922673.jpgPXL_20220716_025319391.MP.jpgPXL_20220716_025334324.jpgPXL_20220716_035309066.jpgPXL_20220716_035411435.NIGHT.jpg 
  413   Tue Jun 28 16:13:34 2022 KojiGeneralGeneralThe small optical table not small enough to get outThe table width was an inch too large compared
to the door width. We need to tilt the table
and it seemed too much for us. Let's
 IMG-5203.jpg 
ELOG V3.1.3-