40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  OMC elog  Not logged in ELOG logo
Entry  Mon Jul 18 14:20:09 2022, Koji, General, General, OMC #002 Plan Portal 
    Reply  Tue Jul 19 03:17:56 2022, Koji, General, General, OMC #002 Power Budget before mirror cleaning 
       Reply  Thu Jul 21 02:55:06 2022, Koji, General, General, OMC #002 Power Budget after mirror cleaning 
    Reply  Thu Jul 21 14:35:35 2022, Koji, General, General, Bond reinforcement blocks for the invar brackets IMG_1095.JPGIMG_1091.JPG
    Reply  Thu Jul 21 14:55:48 2022, Koji, General, General, Optics bonding for the backscatter measurement IMG_1098.JPG
    Reply  Thu Jul 21 17:47:00 2022, Koji, General, General, The profile of the beam incident on the fiber input coupler fiber_beam_profile.pdf
    Reply  Fri Jul 22 00:31:17 2022, Koji, General, General, OMC #002 backscatter measurement OMC_backscatter.pdf
    Reply  Fri Jul 22 17:47:38 2022, Koji, General, General, C&B request for the reinforcement blocks PXL_20220722_222013127.jpg
    Reply  Tue Jul 26 00:12:58 2022, Koji, General, General, High QE PD: QE measurements IMG_1118.JPG
       Reply  Wed Jul 27 10:34:09 2022, Koji, General, General, High QE PD: QE measurements 2 IMG_1119.JPGIMG_1120.JPG
    Reply  Wed Jul 27 10:09:51 2022, Koji, General, General, 4+4 wire clamp in hand PXL_20220727_072154009.jpg
    Reply  Wed Jul 27 10:34:30 2022, Koji, General, General, OMC #002 Protective FirstContact Paint IMG_1125.JPG
    Reply  Wed Jul 27 23:52:18 2022, Koji, General, General, OMC #002 Cable bracket replacement (1) IMG_1126.JPGIMG_1135.JPGIMG_1127.JPGIMG_1129.JPGIMG_1130.JPG
    Reply  Thu Jul 28 00:28:15 2022, Koji, General, General, OMC #002 Cable bracket replacement (2)  IMG_1132.JPGIMG_1133.JPGIMG_1136.JPG
    Reply  Thu Jul 28 00:46:47 2022, Koji, General, General, Subject: OMC #002 Cable bracket replacement (3) IMG_1137.JPGIMG_1148.JPGIMG_1138.JPG
    Reply  Wed Aug 10 18:42:27 2022, Koji, General, General, OMC #002 Cable bracket replacement (4) PXL_20220809_235457354.jpgPXL_20220811_011910569.jpgPXL_20220811_013746139.jpg
       Reply  Thu Aug 11 15:24:57 2022, Koji, General, General, OMC #002 Cable bracket replacement (5) 
    Reply  Mon Aug 15 21:31:56 2022, Koji, General, General, OMC #002 Cable bracket replacement (6)  IMG_1155.JPGIMG_1149.JPGIMG_1150.JPG
    Reply  Mon Aug 15 22:06:18 2022, Koji, General, General, OMC #002 new cable tie installed IMG_1929.JPGIMG_1930.JPG
    Reply  Mon Aug 15 22:43:35 2022, Koji, General, General, OMC #002 Delamination repair Part1 (1) IMG_1926.JPGPXL_20220816_011346581.jpg
       Reply  Mon Aug 15 22:49:03 2022, Koji, General, General, OMC #002 Delamination repair Part1 (2) 7x
          Reply  Wed Aug 24 02:51:23 2022, Koji, General, General, OMC #002 Delamination repair Part1 (3) 8x
    Reply  Wed Aug 24 02:53:46 2022, Koji, General, General, OMC #002 Delamination repair Part2 (1) IMG_1168.JPGIMG_1169.JPGIMG_1170.JPGIMG_1171.JPGIMG_1175.JPG
       Reply  Wed Aug 24 03:20:59 2022, Koji, General, General, OMC #002 Delamination repair Part2 (2) 11x
          Reply  Wed Aug 24 03:26:43 2022, Koji, General, General, OMC #002 Delamination repair Part2 (3) 8x
    Reply  Wed Aug 24 02:57:43 2022, Koji, General, General, EP30-2 bonding setup IMG_1178.JPGIMG_1179.JPGIMG_1180.JPG
    Reply  Wed Aug 24 11:29:47 2022, Koji, General, General, OMC #002 ready for shipment IMG_1207.JPGPXL_20220825_004259850.jpgPXL_20220825_004307204.jpgPXL_20220825_005423342.jpgPXL_20220825_005549985.jpg
    Reply  Thu Aug 25 14:22:08 2022, Koji, General, General, LLO OMC #001 Ballast Mass investigation DSCN0917.JPGDSCN0922.JPGP6108705.JPGP6108707.JPGP6108706.JPG
       Reply  Thu Aug 25 20:05:00 2022, Koji, General, General, LLO OMC #001 Ballast Mass investigation balance_mass_config_LLO.pdf
    Reply  Fri Aug 26 22:29:02 2022, Koji, General, General, Tool Shipping Prep PXL_20220831_025623318.jpgPXL_20220831_024518032.jpgPXL_20220831_030234581.jpg
Message ID: 435     Entry time: Thu Aug 11 15:24:57 2022     In reply to: 434
Author: Koji 
Type: General 
Category: General 
Subject: OMC #002 Cable bracket replacement (5) 

- The hole size extension is going forwared now.

- Madeline and Chub are cleaning (sonicating) a drill (29/64=0.4531")
- The parts in a bag were brought to the 40m C&B lab.

- The hole is going to be 11mil=0.28mm larger than the recommendation (0.442").
  It's not a D-hole. The connector has a rounded-rectangular flange that fits into the PEEK parts.
  So I don't think it's an issue.

- Chub has a proper spanner to fasten the nuts. We want to use it here and LLO.

 

ELOG V3.1.3-