Completed work of the previous months: [Jul] [Aug] [Sep] [Oct] [Nov] [Dec]
- Work in progress
- R&T measurement
- Wedge measurement
- Work to be done
- QPD/PD pre-selections (QE/noise)
-
-
-
- Misc. / Beaurocracy?
- Continuous monitoring of the particle level
- Replacing a file cabinet next to the south wall by a lockable cabinet
- Ion gun safety issues: https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=88631
- Laser SOP / HV use? / UV?
- Things delivered
- Things ordered
- Power strips Tripp Lite PS3612 (Ordered Nov. 8, Delivered Nov. 12)
- Kapton tapes (1in x 6, 1/2in x 12 Delivered Nov. 15)
- Sticky Mats (VWR 18888-216 Delivered Nov. 12 and 21992-042)
- Duck tape (PK3) (Delivered Nov. 12)
- Wipers 12"x12" 2ply x 119 pairs x case15 (Delivered Nov. 12)
- Syringes (1mL&2mL) & Needles (20G x dozen)
- Stainless trays with cover (Steve Delivered Nov. 12)
- Gold Plated allen keys (Steve Delivered Nov. 12)
- Forceps (Delivered Nov. 12) / Tweezers / Scissors (Delivered Nov. 12)
- Things to buy / get
- OMC testing optics / opto-mechanics
- Black Glass / Black Glass holder / AR ==> Some at the 40m, some from LLO
- Ionized air blow
- N2 or Air cylinder: 4N - UHP or 5N - Research Grade. (... steal from Downs)
- Clean tools, tray, storage
- Supply
- Additional clean supplies ~ glove 8.5,9,9.5
- Stainless bats / Pure solvents (Metha / Aceton / Iso) / Syringes / Lint free cloth / Paper lens tissue
- Lab coats
- ATF
- Tefron tape
- Thorlabs 8-32 screw kit / Thorlabs HW-KIT1
- Pedestal Shims - Newport
- Things to be done
- Cavity ref/trans/finesse
- PD Q.E. & Reflectivity measurement vs incident angle
- Functionality test of QPD/PD (PeterK) /PZT
- Procedures to be decided
- PZT alignment
- UV glue? (heat) / gluing test
- Balance
- N2 cylinder/lines/filter
- Shipping procedure: New shipping cage design on going (Jeff) => Plastic box similar to COC
- Design
- Solidworks raytracing model
- Mode design for HAM6 layout
- Things to be decided / confirmed
- How to handle optics / assemblies (Talk to the prev people)
- First contact? (Margot: applicable to a short Rc of ~2.5m)
- Gluing templates to be designed (how to handle it?)
- Jitter noise?
- How to align the cavity mirrors, input mirrors, QPDs, PDs, beam dumps.
Electronics ==> Rich |