40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  OMC elog  Not logged in ELOG logo
Entry  Sun Apr 14 23:58:49 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection 
    Reply  Mon Apr 15 00:08:32 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #7) 6x
    Reply  Mon Apr 15 00:39:04 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #8) 8x
    Reply  Mon Apr 15 01:07:30 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #9) 7x
    Reply  Mon Apr 15 01:23:45 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #10)  IMG_7589.jpgIMG_7590.jpgIMG_7591.jpgIMG_7592.jpg
Message ID: 335     Entry time: Mon Apr 15 01:23:45 2019     In reply to: 331
Author: Koji 
Type: General 
Category: General 
Subject: OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #10)  

Sub-ASSY #10

Attachment #1: Mounting Block SN021

Attachment #2: PZT-Mounting Block bonding looks just excellent.

Attachment #3: The other side of the PZT-Mounting Block bonding is also excellent.

Attachment #4: The mirror-PZT bonding also look excellent. Some barrel fracture is visible at the lower left of the mirror.

Attachment 1: IMG_7589.jpg  692 kB  Uploaded Mon Apr 15 02:25:08 2019  | Show | Hide all | Show all
Attachment 2: IMG_7590.jpg  757 kB  Uploaded Mon Apr 15 02:25:08 2019  | Hide | Hide all | Show all
IMG_7590.jpg
Attachment 3: IMG_7591.jpg  792 kB  Uploaded Mon Apr 15 02:25:08 2019  | Hide | Hide all | Show all
IMG_7591.jpg
Attachment 4: IMG_7592.jpg  376 kB  Uploaded Mon Apr 15 02:25:08 2019  | Hide | Hide all | Show all
IMG_7592.jpg
ELOG V3.1.3-