The bottom-side templates were removed.
The last beam dump was removed
TODO
ICS entry
Bring the OMC to the bake lab
Vacuum baking
Bring it back to the OMC lab
Cabling / Wiring
VIbratin test
Optical tests
Backscattering test
Packing / Shipping