All of the INVAR blocks have been glued.
I found thinner shims in the stock.
On Monday, the template will be removed.
EP30-2 7g mixed with 0.35g of 75-90um sphere
TODO
EP30-2 gluing of the INVAR blocks for the PDs
PDs/QPDs need to be slightly lower -> order more shims
Remove the templates
Glue the last beam dump
Vibration test?
Bring the OMC to the bake lab
Vacuum baking
Bring it back to the OMC lab
Cabling / Wiring
Optical tests
Backscattering test
Packing / Shipping |