BS1/FM1/FM2 for I1OMC were glued.
FM1 had to be intentionally rotated.
FM1 had to be intentionally shifted to avoid scattering spot.
Pin: 36.3 / Ptrans: 33.7 = Raw transmission 92.8%
Vunlock = 6.30 / Vlock = 0.120
Mode matching (estim) 0.98
Loss per mirror 84ppm
Cavity transmission 0.947
ummm
Tomorrow:
- Transmission needs to be optimized
- Apply 50V to a PZT
- Cavity FSR/HOM should be optimized
- gluing
Put a cover
Return power meter / DC supply |