40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  OMC elog  Not logged in ELOG logo
Message ID: 170     Entry time: Mon Oct 14 15:50:55 2013
Author: Koji 
Type: Optics 
Category: Characterization 
Subject: H1 OMC Power budget 

LHO OMC power budget

Date 2013/9/17 2013/9/17 2013/10/16 2013/10/22
Condition  Before the cleaning  After the cleaning  Confirmation  Confirmation
Input Power [mW]  35.2  35.4  34.54  34.9
REFLPD dark offset [V]  -0.00763  -0.00763  -0.00772  -0.000759
REFLPD unlocked [V]  0.0749 +/- 0.0005  0.067+/- 0.0005  0.0640+/-0.0005  0.0530+/-0.0001
REFLPD locked [V]  5.49 +/- 0.01  5.55+/-0.01  5.28+/-0.01  5.26+/-0.01
         
 Transmitted Power to DCPD1 (T) [mW]  16.5  16.4  16.1  16.0
 Transmitted Power to DCPD2 (R) [mW]  15.9  16.2  15.55  15.55
 FM2 transmission [mW]  32.4  32.9+/-0.1  -  -
 CM1 transmission [mW]  0.166  0.169  0.164  0.165
 CM2 transmission [mW]  0.165  0.169  0.158  0.162
 Input BS transmission [mW]  0.234  0.218  0.230  0.227
         
 Cavity Finesse  373.114  373.114  373.114  373.114
         
 Junk Light Power (Pjunk) [mW]  0.489  0.434  0.422  0.332
 Coupled beam power (Pcouple) [mW]  34.71  34.97  34.12  34.57
 Mode Matching (Pcouple/Pin) [mW]  0.986  0.988  0.988  0.990
 Cavity reflectivity in power  0.00115  0.00119  0.00136  0.00199
 Loss per mirror [ppm]  122  124  134  167
 Cavity transmission for TEM00 carrier
 0.933  0.932  0.927  0.913

 

Attachment 1: OMC_power_budget.pdf  68 kB  Uploaded Thu Aug 28 00:06:49 2014  | Show | Show all
ELOG V3.1.3-