40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  OMC elog  Not logged in ELOG logo
Entry  Fri Aug 9 10:09:56 2013, Koji, General, General, PZT Assembly #3/#4 PZT_assembly.pdf
    Reply  Mon Aug 12 20:22:19 2013, Koji, General, General, PZT Assembly #5/#6 
Message ID: 150     Entry time: Mon Aug 12 20:22:19 2013     In reply to: 149
Author: Koji 
Type: General 
Category: General 
Subject: PZT Assembly #5/#6 

PZT Assembly #5/#6 were glued on Fri Aug 9th

They are removed from the fixture on Mon Aug 12th.

All of the four PZT assemblies were moved to the OMC lab.

ELOG V3.1.3-