40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
Mariner elog, Page 1 of 3
Not logged in
List
|
Find
|
Login
|
Help
Full
|
Summary
| Threaded |
Collapse
|
Expand
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
General
121 Entries
Goto page 1,
2
,
3
Next
Mon Sep 27 17:01:53 2021, rana, General, Heat Load, Mariner cooldown model status + next steps
Tue May 10 18:29:11 2022, rana, General, Suspension, Mariner Suspension Cryo shield Install / Removal steps
Thu Jul 7 15:20:04 2022, rana, General, Optical Contacting, some useful links
Thu Oct 27 22:12:21 2022, rana, General, Optical Contacting, plotting and PID
Wed Mar 17 21:24:27 2021, gautam, General, Design specs, Silicon TM dichroic coatings for phase I
Mon Oct 11 15:22:18 2021, Yehonathan, General, General, Microcomb alternatives
Thu May 21 12:10:03 2020, Stephen, General, Resources, Ongoing Mariner Resources
Fri Mar 5 11:05:13 2021, Stephen, General, Design specs, Feasibility of 6" optic size in CAD
Fri May 7 09:57:18 2021, Stephen, General, Equipment, Overall Dimensions for Mariner Suspension Test Chamber Concept
Wed Jun 30 16:21:53 2021, Stephen, General, Design specs,
Wed Jul 7 16:32:27 2021, Stephen, General, Equipment, Overall Dimensions for Mariner Suspension Test Chamber Concept
Thu Aug 26 17:40:41 2021, Stephen, General, Suspension, Selecting MOS-style frame
Sat Jan 7 17:08:47 2023, Sophia Adams, General, Optical Contacting,
Mon Jan 9 16:18:50 2023, Sophia Adams, General, Optical Contacting,
Fri Jun 5 11:13:50 2020, Raymond, General, Heat Load, Steady state heat load example
Fri Sep 24 13:12:00 2021, Radhika, General, Heat Load, Mariner cooldown model status + next steps
Wed Sep 29 16:15:19 2021, Radhika, General, Heat Load, Mariner cooldown model status + next steps
Tue Oct 5 17:46:14 2021, Radhika, General, Heat Load, Mariner cooldown model status + next steps
Fri Oct 15 13:45:55 2021, Radhika, General, Heat Load, Mariner cooldown model status + next steps
Fri Oct 15 14:31:15 2021, Radhika, General, Heat Load, Mariner cooldown model status + next steps
Fri Aug 26 14:24:57 2022, Radhika, General, Heat Load, Mariner TM Cooldown model
6x
Mon Aug 29 15:44:46 2022, Radhika, General, Heat Load, Mariner TM Cooldown model
Wed Sep 7 10:42:12 2022, Radhika, General, Heat Load, Mariner TM Cooldown model
Thu Mar 4 17:04:52 2021, Paco, General, Design specs, Silicon TM dichroic coatings for phase I
Wed Mar 17 19:51:42 2021, Paco, General, Design specs, Silicon TM dichroic coatings for phase I
Wed Mar 24 17:36:46 2021, Paco, General, Design specs, Least common multiple stacks and varL cost
Wed Mar 24 17:42:50 2021, Paco, General, Design specs, Silicon TM dichroic coatings for phase I
Fri Apr 2 19:59:53 2021, Paco, General, Design specs, Differential evolution strategies
Fri Jun 4 11:09:27 2021, Paco, General, Design specs, HR coating tolerance analysis
Tue Jul 27 11:38:25 2021, Paco, General, Design specs, DOPO single pass PDC efficiency
Thu Sep 9 11:25:30 2021, Paco, General, Design specs, Rerun HR coatings with n,k dispersion
Thu Sep 9 20:42:34 2021, Paco, General, Design specs, Rerun HR coatings with n,k dispersion
Sun Sep 19 18:52:58 2021, Paco, General, Design specs, HR coating emissivity
Fri Oct 1 11:52:06 2021, Paco, General, Design specs, HR coating emissivity
Fri Oct 1 12:01:24 2021, Paco, General, Design specs, TM Barrel coating emissivity
Fri Oct 1 14:11:23 2021, Paco, General, Design specs, TM Barrel coating emissivity
Fri Nov 5 11:51:50 2021, Paco, General, Design specs, Estimate of in-air absorption near 2.05 um
Tue Nov 16 11:47:54 2021, Paco, General, Design specs, Estimate of in-air absorption near 2.05 um
Mon Jul 18 18:34:29 2022, Paco, General, Design specs, HR coating update
Fri Jul 22 13:36:55 2022, Paco, General, Design specs, HR coating update
Tue Aug 16 09:58:23 2022, Paco, General, Design specs, HR coating update
6x
Tue Aug 23 17:10:50 2022, Paco, General, Design specs, New corner plots
Tue Apr 27 12:28:43 2021, Nina Vaidya & Shruti Maliakal, General, Design specs, Arm Cavity Design 2021
Fri May 7 17:50:31 2021, Nina Vaidya & Shruti Maliakal, General, Design specs, Arm Cavity Design 2021 update
Thu May 21 11:51:44 2020, Koji, General, General, Mariner Elog Test
Tue Jun 22 22:28:09 2021, Koji, General, Design specs, Test Mass wedge design
Fri Aug 6 04:34:43 2021, Koji, General, General, Theoretical Cooling Time Limit
Tue Aug 17 17:48:57 2021, Koji, General, Equipment, Crackle SW model
Fri Sep 24 11:02:41 2021, Koji, General, General, Actuation Feedback Model and Noise
Wed Nov 3 02:52:49 2021, Koji, General, Suspension, Mariner Sus Design
Goto page 1,
2
,
3
Next
ELOG V3.1.3-