  53   Thu Jun 16 14:04:30 2022 JuanGeneralSuspensionTable for Mariner Suspension CryoToday we looked at possible locations for
where we will be setting up Mariner Suspension
and Cryo chamber. The first option was the
  
  54   Thu Jun 16 19:43:36 2022 KojiGeneralSuspensionTable for Mariner Suspension Cryo- B246/QIL Skyhook


Find the base of Skyhook.
It should be in the storage room (B246).
  
  55   Thu Jun 23 21:11:03 2022 KojiGeneralSuspensionTable for Mariner Suspension CryoTable moving effort in the OMC lab: See
https://nodus.ligo.caltech.edu:8081/OMC_Lab/412

 
  
  16   Tue Jun 22 22:28:09 2021 KojiGeneralDesign specsTest Mass wedge designThe
ETM wedge of 0.5deg will allow us to separate
the AR reflections. We will be OK with the
 wedge.pdfLayout.pdfETM.pdfITM.pdf 
  20   Fri Aug 6 04:34:43 2021 KojiGeneralGeneralTheoretical Cooling Time LimitI was thinking about how fast we can cool
the test mass. No matter how we improve the
emissivity of the test mass and the cryostat,
 cooling_curves.pdf 