40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  Mariner elog, Page 2 of 2  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Authorup Type Category Subject Text Attachments
  18   Wed Jul 7 16:32:27 2021 StephenGeneralEquipmentOverall Dimensions for Mariner Suspension Test Chamber ConceptWIP - Stephen to check on new suspension
dimensions and fit into 40m chamber
  
  23   Thu Aug 26 17:40:41 2021 StephenGeneralSuspensionSelecting MOS-style frame[Koji, Stephen]

Kind of a silly post, and not very
scientific, but we are sticking to it. During
 no_sos_cad_screenshot.pngvault_check_in_of_mariner_suspension_cad.png 
  38   Mon Oct 11 15:22:18 2021 YehonathanGeneralGeneralMicrocomb alternativesFollowing our discussion at the Friday
JC meeting, I gathered several resources
and made a small simulation to show how frequency
 ELMO_specs.pngHNLF_specs.pngSimulationResults1.pngSimulationResults3.png 
  7   Wed Mar 17 21:24:27 2021 gautamGeneralDesign specsSilicon TM dichroic coatings for phase II guess you have tried it already - but
does enforcing the stacks to be repeating
bilayer pairs of the same thickness fail
  
  31   Mon Sep 27 17:01:53 2021 ranaGeneralHeat LoadMariner cooldown model status + next stepsHow
about a diagram so that we can understand
  
  52   Tue May 10 18:29:11 2022 ranaGeneralSuspensionMariner Suspension Cryo shield Install / Removal steps    
ELOG V3.1.3-