  45   Wed Nov 3 02:52:49 2021 KojiGeneralSuspensionMariner Sus Design

All parameters are temporary:

Test mass size: D150mm x L140mm
Intermediate mass size W152.4mm x D152.4mm x H101.6mm
TM Magnets: 70mm from the center

Height from the bottom of the base plate
- Test mass: 5.0" (127mm) ==> 0.5" margin for the thermal insulation etc (for optical height of 5.5")
- Suspension Top: 488.95mm
- Top suspension block bottom: 17.75" (450.85mm)
- Intermediate Mass: 287.0mm (Upper pendulum length 163.85mm / Lower pendulum length 160mm)

OSEMs
- IM OSEMs: Top x2 (V/P)<-This is a mistake (Nov 3 fixed), Face x3 (L/Y/P), Side x 1 (S)
- TM OSEMs: Face x4
- OSEM insertion can be adjusted with 4-40 screws

To Do:
- EQ Stops / Cradle
(Nov 3 50% done)
- Space Consideration: Is it too tight?
- Top Clamp: We are supposed to have just two wires
(Nov 3 50% done)
- Lower / Middle / Upper Clamps & Consider installation procedure
- Fine alignment adjustment
- Pendulum resonant frequencies & tuning of the parameters
- Utility holes: other sensors / RTDs / Cabling / etc

- Top clamp options: rigid mount vs blade springs
- Top plate utility holes
- IM EQ stops

Discussion with Rana

- Hoe do we decide the clear aperture size for the TM faces?
- OSEM cable stays
- Thread holes for baffles

- Light Machinery can do Si machining
- Thermal conductivity/expansion

- The bottom base should be SUS... maybe others Al except for the clamps

- Suspension eigenmodes separation and temperature dependence

 

# Deleted the images because they are obsolete.

  46   Thu Nov 4 00:42:05 2021 KojiGeneralSuspensionMariner Sus Design

Some more progress:

- Shaved the height of the top clamp blocks. We can extend the suspension height a bit more, but this has not been done.

- The IM OSEM arrangement was fixed.

- Some EQ stops were implemented. Not complete yet.

Attachment 1: Screen_Shot_2021-11-04_at_12.38.46_AM.png
Screen_Shot_2021-11-04_at_12.38.46_AM.png
Attachment 2: Screen_Shot_2021-11-04_at_12.39.53_AM.png
Screen_Shot_2021-11-04_at_12.39.53_AM.png
  51   Thu May 5 19:56:25 2022 KojiGeneralSuspensionMariner Suspension Cryo shield Install / Removal steps

Does this work? Is this insane?

Attachment 1: 40m_Mariner_Suspension-0062.png
40m_Mariner_Suspension-0062.png
Attachment 2: 40m_Mariner_Suspension.mp4
  52   Tue May 10 18:29:11 2022 ranaGeneralSuspensionMariner Suspension Cryo shield Install / Removal steps

Transformers Optimus GIF - Transformers Optimus Prime - Discover & Share  GIFs

cool

 

  53   Thu Jun 16 14:04:30 2022 JuanGeneralSuspensionTable for Mariner Suspension Cryo

Today we looked at possible locations for where we will be setting up Mariner Suspension and Cryo chamber. The first option was the far left table in the CAML lab but it seems that there is going to be an issue with height clearance, so we have come up with another solution which takes a table from Koji's lab which is 3'x4' ft and moving it into CAML lab in the back right of the lab. To move the table we may need to call facilities to help us because we will most likely need to take the table apart to get it out of the lab. The aisle space in Koji's lab is about 43 inches, but the doorway, which is the tightest space, is 35 inches.

After we have set up the table in CAML we are planning on moving the Chamber in DOPO-lab to CAML. We plan to use skyhook with has a load limit of 500lbs/227kg this should be more than enough to move the chamber. We still need to get the wheeled base for skyhook we are in the works in doing so. 

Also, We want to remove the previous setup from the chamber and leave it at DOPO-lab. Stephen is going to figure out how to keep it clean (sort of). Besides these transportation logistics, I am also working on the electronics as an immediate task and the electrical arrangement in the chamber.

to do list
        - Check the table height
        - Check the chamber height (base/cap)
        - Check how much the chamber cap needs to be lifted (so that we can remove it)
        - Is the weight capacity sufficient?

 

  54   Thu Jun 16 19:43:36 2022 KojiGeneralSuspensionTable for Mariner Suspension Cryo

- B246/QIL Skyhook

  • Find the base of Skyhook. It should be in the storage room (B246). Stephen contacted Chub for lab access. Done
  • Assemble Skyhook with the base and check the stability/safety/capacity/height/etc

- DOPO

  • Ask Paco to move the delicate instruments from the table. Done
  • Bring Skyhook to DOPO. The chamber seems already vented.
  • Find the way to place the cap on the floor safely and cleanly. => Stephen
     
  • Open the cap and then remove the crackle interferometer. Wrap it with something and place it somewhere in the room. How? => Stephen
     
  • Move the base to a dolly or something. Then put a cap on the base. => It'd be better to ask Caltech Transp for the chamber transportation.
  • Do we have to temporarily remove the laser safety curtain?

- OMC Lab

  • We probably need to separate the optical table and the base. Ask Caltech Transp to check how the work should be done.
  • Do we have to temporarily move anything on the way?
  • The table can be rolled out to the corridor and then rolled in to the CAML.

- CAML

  • Remove the grey rack and push the desk to the East.
  • Place the optical table.
  • Place the rack close to the table.
  55   Thu Jun 23 21:11:03 2022 KojiGeneralSuspensionTable for Mariner Suspension Cryo

Table moving effort in the OMC lab: See https://nodus.ligo.caltech.edu:8081/OMC_Lab/412

 