40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  Cryo Lab eLog  Not logged in ELOG logo
Entry  Tue Sep 28 15:47:39 2021, aaron, Lab Infrastructure, PSOMA, PSOMA table enclosure 
    Reply  Wed Sep 29 09:57:50 2021, aaron, Lab Infrastructure, PSOMA, PSOMA table enclosure assembly 
       Reply  Thu Oct 14 09:02:57 2021, aaron, Lab Infrastructure, PSOMA, PSOMA table enclosure assembly 
          Reply  Tue Oct 19 10:45:08 2021, aaron, Lab Infrastructure, PSOMA, PSOMA table enclosure assembly 
             Reply  Tue Mar 1 17:08:47 2022, shruti, Lab Infrastructure, PSOMA, PSOMA table enclosure assembly WorkNB_Y3Q2.pdf
                Reply  Tue Apr 19 12:07:46 2022, shruti, Lab Infrastructure, PSOMA, PSOMA table enclosure assembly 
Message ID: 2823     Entry time: Tue Oct 19 10:45:08 2021     In reply to: 2822     Reply to this: 2860
Author: aaron 
Type: Lab Infrastructure 
Category: PSOMA 
Subject: PSOMA table enclosure assembly 

[aaron, shruti, raj]

We added the acrylic framing that supports the HEPA FFU, as well as two of the 3 panels covering the top of the enclosure. Raj and Shruti also unwrapped and added handles to the orange acrylic doors.

However, the last acrylic panel for the roof of the enclosure is too small. Though the part is cut as specified at 23" on the short side, the counterbore holes on the long side of the panel do not span the distance between the two rails where the panel mounts. The counterbore holes are 0.75" from the edge of the panel, which means the two lines of holes are 21.5" apart. However, the distance between the center of the rails is specified at 22.5". The distance between the rails is appropriate for the size of the HEPA FFU, and the 0.75" gap along the edge of the panel is standard across the other roof panels. Therefore, I suspect the overal width of the panel was just specified 1" too short.

I'll alert F&L and have them send another panel ASAP

 