Entry  Tue Sep 28 15:47:39 2021, aaron, Lab Infrastructure, PSOMA, PSOMA table enclosure 
    Reply  Wed Sep 29 09:57:50 2021, aaron, Lab Infrastructure, PSOMA, PSOMA table enclosure assembly 
       Reply  Thu Oct 14 09:02:57 2021, aaron, Lab Infrastructure, PSOMA, PSOMA table enclosure assembly 
          Reply  Tue Oct 19 10:45:08 2021, aaron, Lab Infrastructure, PSOMA, PSOMA table enclosure assembly 
             Reply  Tue Mar 1 17:08:47 2022, shruti, Lab Infrastructure, PSOMA, PSOMA table enclosure assembly WorkNB_Y3Q2.pdf
                Reply  Tue Apr 19 12:07:46 2022, shruti, Lab Infrastructure, PSOMA, PSOMA table enclosure assembly 
Message ID: 2820     Entry time: Wed Sep 29 09:57:50 2021     In reply to: 2819     Reply to this: 2822
Author: aaron 
Type: Lab Infrastructure 
Category: PSOMA 
Subject: PSOMA table enclosure assembly 

[shruti, aaron, raj, chris, ian]

  1. Prepping
    1. Powered off lasers and other electronics around the table, disconnected power cords, and separated the PSOMA rack several inches from the table
    2. Wrapped the table in plastic in preparation for assembly
  2. Assembling the frame
    1. Brought in the 80-20 bars, and set the long 2x1 bars along the sides of the table ('x' is 95" long, 'y' is 50", 'z' is 90.25")
    2. Identified the enclosure's feet, which are PN #65-2191 (bolt with a flat hex head). We're pretty sure from the enclosure diagram that these feet mate with the rectangular block PN #2130. Unfortunately, the bolt is M10 while the threaded block is 3/8-16... happily, we found some other rubberized feet with a 3/8-16 bolt in the EE shop, and were able to mount those on the vertical bars.
    3. Next up, we noticed that none of the 45 degree cut cross bars have arrived. As far as I can tell, we have all other parts, but I have

I've asked F&L for a parts list so we can do a proper inventory before starting assembly. Also requested a quote on purple panels, update on shipment for the cross bars, and imperial threaded feet.