40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  Cryo Lab eLog  Not logged in ELOG logo
Entry  Tue Jun 22 14:35:40 2021, aaron, shruti, DailyProgress, Control System, slow temperature control 7x
    Reply  Wed Jun 23 17:53:21 2021, aaron, DailyProgress, Control System, slow temperature control 
       Reply  Thu Jun 24 12:26:56 2021, shruti, DailyProgress, Control System, slow temperature control 
          Reply  Thu Jun 24 14:37:12 2021, aaron, DailyProgress, Control System, slow temperature control, more transfer functions 
             Reply  Mon Jun 28 10:12:28 2021, shruti, DailyProgress, Control System, glitches, transfer function glitches.pngOLTF.pdfSetup.pdfData.zip
                Reply  Mon Jun 28 13:16:07 2021, aaron, DailyProgress, Control System, glitches 
                   Reply  Tue Jun 29 08:53:02 2021, Chris, HowTo, Control System, acquiring slow channels 
Message ID: 2769     Entry time: Tue Jun 29 08:53:02 2021     In reply to: 2767
Author: Chris 
Type: HowTo 
Category: Control System 
Subject: acquiring slow channels 

Here's how to add slow channels to the framebuilder DAQ:

  1. Edit /etc/advligorts/edc.ini to add the channels to the list
  2. Restart epics data collector: sudo systemctl restart rts-edc
  3. Restart framebuilder: sudo systemctl restart rts-daqd
ELOG V3.1.3-