40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  Cryo Lab eLog  Not logged in ELOG logo
Message ID: 2609     Entry time: Thu Jan 14 17:16:35 2021
Author: aaron 
Type: DailyProgress 
Category: PSOMA 
Subject: free space setup 

enter about Thu Jan 14 17:17:03 2021

Finished laying out the MZ, one cavity, and PDs. Need a couple more beam dumps, and should get 3/4'' posts with height appropriate for DC monitor PDs and PBS mount (as in D0901749).

Cleaned up to more easily work with two people tomorrow.

exit Thu Jan 14 19:25:15 2021

Attachment 1: 2CCC0C42-017F-45B5-A4DD-E451953DE4E2.jpeg  541 kB  Uploaded Thu Jan 14 20:27:47 2021  | Hide | Hide all
2CCC0C42-017F-45B5-A4DD-E451953DE4E2.jpeg
Attachment 2: DF68EBCD-37F3-4CA2-B6C0-6E96146C49C9.jpeg  4.027 MB  Uploaded Thu Jan 14 20:29:34 2021  | Hide | Hide all
DF68EBCD-37F3-4CA2-B6C0-6E96146C49C9.jpeg
Attachment 3: 517E4CCF-D12F-4C87-888F-516E21D28049.jpeg  3.920 MB  Uploaded Thu Jan 14 20:29:54 2021  | Hide | Hide all
517E4CCF-D12F-4C87-888F-516E21D28049.jpeg
ELOG V3.1.3-