Message ID: 2567     Entry time: Wed Sep 2 16:46:39 2020
Author: aaron 
Type: Things to Buy 
Category: Drawings 
Subject: dimension-full optical layout 

I updated the stage 1/2 optical layout to be more detailed after getting a sense of the sizes of things again last week. Even though this isn't how the table is currently set up, it might be good to accommodate future vacuum chambers in our earlier designs to minimize how much we need to move and realign optics. 

  • just for convenience, I gave all of the vacuum chambers the footprint of the gyroscope vacuum chambers. I chose this footprint rather than the cantilever cavity cryostat footprint to allow 45 deg aoi on the mach zehnder BSs (the cryostat windows are all parallel)
  • The chamber containing the output BS and BHD is cramped. If these all need to be in the same vacuum, we should get a larger vacuum; if the BHD and LO path can be moved to air that works too.
  • If output BS chamber is larger and input MMT allows, the entire MZ can be shifted to the right (north). 
  • Picked off LO from input BS AR surface
  • Need additional mode matching lenses into some of the photodiodes -- certainly into PL_RFPD, but I think also into the other PDs?
  • The beam to TRANS_DCPD is probably geometrically unphysical. 
  • The cavity length is limited by the size of the cryostat.
  • Perhaps want free-space EOM, EOAM, Faraday isolator?
  • Not sure I've dumped all beams properly, for example the reflection from BHD_PD1 and from BHD_BS AR surface.

I will update the PSOMA hardware inventory tomorrow to reflect the additional details in the new drawing. The updated diagram is available on git LFS, and the hardware inventory now reflects the diagram up through stage 1.

Attachment 1: psoma_stage2.pdf  734 kB  Uploaded Wed Sep 2 17:54:02 2020  | Hide | Hide all