Entry  Tue Aug 25 13:42:40 2020, aaron, Update, Lab Work, optics setup 
    Reply  Wed Aug 26 12:12:22 2020, aaron, Update, Lab Work, optics setup 
       Reply  Fri Aug 28 16:59:59 2020, aaron, Update, Lab Work, optics setup 
          Reply  Mon Aug 31 10:00:25 2020, aaron, Update, Lab Work, optics setup 200828_layout.jpg
Message ID: 2565     Entry time: Mon Aug 31 10:00:25 2020     In reply to: 2564
Author: aaron 
Type: Update 
Category: Lab Work 
Subject: optics setup 

Here's the layout.

Some easy things that should be changed:

  • Transmission through the cavity end mirror should go to a steering mirror before PDA20CS
  • Should clamp the cables (eg power to PDA255) with something soft so they stay in place and aren't strained
  • Need to dump the reflection from transmon PD. Do we really need to dump transmission through mirrors with frosted backs?
Attachment 1: 200828_layout.jpg  2.619 MB  | Hide | Hide all