40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  PSL, Page 50 of 53  Not logged in ELOG logo
ID Date Author Type Categoryup Subject Text Attachments
  631   Wed Jul 20 15:54:21 2011 taraDailyProgressopticoptic layout for new fss setup  I edited the layout so that the
spots in both AOMs are 200 um. I'll list
what optics we might have to buy.
 2011_07_20_layout.png 
  632   Wed Jul 20 23:00:30 2011 FrankDailyProgressopticoptic layout for new fss setupthe lens and mirror are in the ATF, a second
VCO is in the left cabinet.
 
  
  636   Fri Jul 22 20:51:13 2011 frank, taraDailyProgressopticcleaning opto mechanical partsAs we removed some optics on the table,
we use pressurized air to blow away dust/dirt
on the mechanical parts (mount/ post/ lens
 IMG_1862.JPGIMG_1863.JPG 
  640   Tue Jul 26 18:42:16 2011 raphael, taraDailyProgressopticcleaning opto mechanical partsToday we removed the optics behind the
PMC, ACAV, and cleaned the table.

      Optic mounts and
 IMG_1866.JPGIMG_1867.JPG 
  644   Thu Jul 28 01:54:21 2011 frank, taraDailyProgressopticcleaning opto mechanical parts  Today we started working on the
layout. There is one mistake in the layout,
the mirror behind AOM for REFCAV is too close
 2011_07_28.pngIMG_1869.JPGIMG_1874.JPGIMG_1875.JPG 
  647   Fri Jul 29 00:42:19 2011 frank, taraDailyProgressopticcleaning opto mechanical parts We preparing optics for the new layout.
To reduce scattering noise, most of the Y1-1064
mirrors we have been using will be replaced
 IMG_1880.JPGIMG_1883.JPGIMG_1889.JPGIMG_1886.JPGIMG_1878.JPG 
  648   Tue Aug 2 23:58:40 2011 taraDailyProgressopticNew RCAV setup is locked  RCAV is locked, I have not
optimized the mode matching yet, the coupling
efficiency is ~ 67%.
 IMG_1911.JPGrcav_2011_08_02.jpg 
  653   Tue Aug 9 00:39:30 2011 taraDailyProgressopticRCAV modematching optimized I optimized mode matching for RCAV.
The coupling is ~75%.  I also minimized
RFAM from the 35.5MHz EOM.
  
  658   Mon Aug 15 23:13:53 2011 taraDailyProgressopticRCAV modematching optimized I recalculated the mode matching
so that the spot radius in AOMs is 100 um.
Now the visibility of RCAV is 90%.
 2011_08_15.png 
  659   Wed Aug 17 20:41:13 2011 taraDailyProgressopticACAV path is upI put most optics on ACAV path. I have
not tried to lock the cavity yet. I'll install
ACAV RFPD next.
 layout_2011_08_17.jpg 
  676   Tue Sep 13 01:11:51 2011 FrankNotesoptic50:50 beamsplitter data - scanned spec sheets from ATFfound the box with the beam splitters Dmass
bought almost 2 years ago but never unpacked
or used. They are super-polished 50:50 beam
 scan0008.jpgscan0011.jpgscan0012.jpg 
  719   Tue Nov 1 16:11:48 2011 taraNotesopticV-block for faraday isolatorI made a drawing for faraday isolator's
base. I'll submit the drawing tomorrow.
 isolator_vblock.PDF 
  726   Tue Nov 8 18:51:38 2011 taraDailyProgressopticoptics for RFAMI added mirrors to pick up stray beams
just before the cavities. These beams will
be used for monitoring RFAM.
 IMG_2186_ACAV.jpgIMG_2187_RCAV.jpg 
  739   Tue Nov 29 01:50:40 2011 taraDailyProgressopticoptics for RFAMI made some minor adjustment to the optics
layout so that the reflected beam at the
PBS before the cavity can be used to measure
 RFPD_setup.jpg 
  746   Sat Dec 3 01:12:00 2011 taraNotesopticV-block for faraday isolator     I replaced the
isolator mount with the V block I drew. The
height is a bit to high. I'll send it back
  
  770   Tue Dec 27 19:49:27 2011 FrankNotesopticLens Kit missing!The entire lens kit (Newport wooden box,
v-coating for 1064nm) is missing . Checked other labs but can't find
  
  784   Fri Jan 13 16:51:29 2012 TaraNotesopticIsolator base, EOM base's height Note: new EOM base
This one will have total height of
1.31" . THe height of the EOM (base
 eom_base_2011_01_13.PDFdual_periscope_base.PDF 
  785   Tue Jan 17 21:59:47 2012 taraDailyProgressoptic14.75MHz EOMAs we decided to use lower sideband frequency
(14.75MHz, instead of 35.5MHz), I replaced
the Broadband EOM with 14.75MHz EOM.
  
  787   Thu Jan 19 01:19:31 2012 taraDailyProgressoptic14.75MHz EOMThe 14.75 MHz EOM we have is for visible
light, so we went to TNI and borrowed a 14.75
MHz EOM for IR and an 14.75 Mhz resonant
  
  789   Thu Jan 19 23:43:43 2012 taraDailyProgressopticRCAV is lockedRCAV is locked using TTFSS.
It took awhile before I could lock
the cavity because the 14.75 MHz EOM tilts
 2012_01_19.jpg2012_01_19b.jpg 
  790   Fri Jan 20 15:31:08 2012 FrankDailyProgressopticRCAV is lockedDon't change the way the EOM is wired !!
If you do so the case is not connected to
GND/protective earth anymore and your high
  
  797   Wed Jan 25 02:51:44 2012 frank, taraDailyProgressopticFaraday Isolator is backWith the new EOM bases, we can place 2
EOMs and the Faraday Isolator back in to
the setup.
 2012_01_24_1.jpg 
  799   Wed Jan 25 23:41:38 2012 frank, taraDailyProgressopticnot much improvement on mode matching We tried to redo the mode matching to RCAV
by adjusting the lense position using translational
stages. However the result does not improve
 2012_01_25_3.jpg2012_01_25_1.jpg 
  801   Thu Jan 26 12:40:21 2012 TaraNotesopticDual periscope base I fixed the drawing for periscope
base. Will submit to the machine shop soon.
 dual_periscope_base.PDF 
  805   Sat Jan 28 02:41:45 2012 FrankPhotosopticphotos of cavity input optics just for reference which part is/was where
for later...
 IMG009.jpgIMG010.jpgIMG011.jpgIMG012.jpg 
  844   Sun Feb 26 17:40:43 2012 taraDailyProgressopticbeam realignment after new seismic stack installation I'm trying to re-align the beams to the
cavities. Due to the new RTV springs for
the seismic stack, the cavities' natural
 IMG_0373.JPGIMG_0374.jpg 
  845   Mon Feb 27 10:56:43 2012 taraDailyProgressopticbeam realignment after new seismic stack installation I realigned ACAV and found TEM00, but now
the transmitted beam is completely missed
the opening on the insulation, it is off
  
  905   Tue Apr 10 00:50:56 2012 frank, taraDailyProgressopticbad PBSWe noticed wide angle scattered light behind
the PBS in front of RCAV. The scattering
source is probably the curved mirror behind
  
  906   Wed Apr 11 02:44:29 2012 frank, taraDailyProgressopticbad PBSUpdate, beat measurement after several
optics replacement. Peaks around 10 Hz, 35
Hz show up this time. 
 beat_2012_04_10.png 
  912   Fri Apr 13 03:15:12 2012 koji,frank,taraDailyProgressopticvibration damping on opticsWe tried to damp mechanical peaks from
each optics. For now, by putting a rubber
piece on a mirror mount can suppress mechanical
 IMG_0731.jpgdamped.png 
  915   Sat Apr 14 06:03:23 2012 frank,taraDailyProgressopticvibration damping on optics We are damping most of the optics
with rubber cones. There are a few peaks
that we still could not find their origins. 
 IMG_0744.jpgIMG_0742.jpg 
  916   Mon Apr 16 02:20:58 2012 taraDailyProgressopticvibration damping on opticsI measured beat signal, after damping most
of the optics, realigning the beams to the
cavities, measured the slope of error signals
 beat_2012_04_15.pngbeat_2012_04_15.png 
  919   Mon Apr 16 16:21:01 2012 taraNotesopticwindows for vacuum chamberI'm checking the properties/prices/availability
of window for the vacuum chamber.
 
  
  921   Mon Apr 16 22:02:08 2012 taraDailyProgressopticvibration damping on opticsI forgot to change the code to disable
the air springs, now the seismic coupling
makes more sense.
 beat_2012_04_15_fixed.png 
  922   Tue Apr 17 19:51:54 2012 taraNotesopticwindows for vacuum chamberIf we go with plan2,
1)window and flange

    I think the window size
 IMG_0757.jpg 
  923   Wed Apr 18 00:49:07 2012 taraDailyProgressopticvibration damping on opticsI planned to measure the beat at night
with the air springs activated, but the power
went out around 11:45 pm. I think the temperature
  
  926   Thu Apr 19 03:12:23 2012 taraNotesopticwindows for vacuum chamber 
I'm searching DCC for window/viewport
examples. The following drawings give me
  
  931   Sun Apr 22 23:09:38 2012 taraNotesopticwindows for vacuum chamberFor small window option, I can either have
it made from scratch ( based on LIGO's drawing)
or buy the commercial windows from Thorlabs.
  
  932   Mon Apr 23 16:52:16 2012 taraNotesopticwindows for vacuum chamberI asked Steve about the choices, he thought
the Thorlabs window should be ok for us.
      What
  
  938   Wed Apr 25 10:44:29 2012 FrankNotesopticwindows for vacuum chamberI don't know how you gonna make the knife
edge on the 10" flange of centered and
wedged! If you put the small CF flanges on
  
  940   Thu Apr 26 08:35:57 2012 steveNotesopticwindows for vacuum chamber

    

       
            
  
  943   Fri Apr 27 08:46:24 2012 FrankNotesopticwindows for vacuum chambercavity mirrors are parallel to the end
surface of the chamber (not completely, but
pretty close; changes every time we touch
  
  949   Tue May 1 20:37:16 2012 taraNotesopticwindows for vacuum chamberI got the reply from Thorlab the flange
can't accept the thicker optical windows.
So I think we have to make our own custom
  
  960   Fri May 11 17:52:17 2012 taraNotesopticwindows for vacuum chamberNice reference for O-ring + groove design.
I'll put it on CTN wiki as well.
 
 O-Rings.pdf.zip 
  964   Wed May 16 22:27:13 2012 taraNotesopticwindows for vacuum chamberI finished the drawing for new vacuum windows.
The o-ring for the windows will be #223 (1/8"
thickness). I'll consult with Steve one more
 2_small_window.PDFblank_10_wedge.PDF 
  969   Mon May 21 16:53:38 2012 taraNotesopticwindows for vacuum chamber I edited the drawing for 10"
flange. The wedge surfaces for 2" windows
are tilted by 2 degrees sideway.
 edit_blank_10_wedge.PDFwindow_assembly.PDFwindow_assembly2.PDF 
  971   Wed May 23 15:04:53 2012 steveNotesopticwindows for vacuum chamber 
 2"  optics with 2
degrees of wedge will have 0.375" thickness
  
  985   Wed Jun 13 11:12:55 2012 taraNotesopticcavity mirrorsFrank showed me where we keep the spare
cavity mirrors. They are in a cardboard box
labeled REO in the left cabinet. There are
 IMG_1357.jpgIMG_1358.jpgIMG_1359.jpg 
  1119   Thu Mar 14 18:20:04 2013 taraNotesopticfused silica pmcPeter told me that  the fused silica
pmc currently used in the lab is bonded by
Vac-seal epoxy. So we don't need to polish
 IMG_0819.JPGIMG_0820.JPG 
  1121   Fri Mar 15 11:23:45 2013 taraNotesopticAlAs/GaAsI'm thinking about the spec for AlAs/GaAs
coatings. Here is the list of what I have:

    coating on concave side
 edgeloss.pngnoise_compare.png 
ELOG V3.1.3-