40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  PSL, Page 50 of 52  Not logged in ELOG logo
Entry  Thu Feb 8 16:48:07 2018, awade, Craig, DailyProgress, NoiseBudget, BN spectrum Feb 08, 2018 20180208_172015_PLLOLTF_08-02-2018_171734.pdf20180208_175847_CalibratedSpectrum.pdf20180208_dailyBNSpectrum.tar.gz
Entry  Thu Feb 13 16:35:32 2020, anchal, DailyProgress, BEAT, BN Detector was saturated. Reduced laser powers. 
Entry  Mon Sep 15 18:29:47 2014, Evan, DailyProgress, BEAT, Attempts at scatter reduction 
    Reply  Tue Sep 16 15:08:57 2014, Evan, DailyProgress, BEAT, Attempts at scatter reduction 
Entry  Tue Oct 8 23:01:56 2013, Evan, DailyProgress, BEAT, Attempts at new beat measurement 
Entry  Thu Aug 1 03:34:35 2013, Chloe, DailyProgress, ECDL, Assembling ECDL 
    Reply  Thu Aug 1 18:33:12 2013, Chloe, DailyProgress, ECDL, Assembling ECDL tempsensor.PNG
    Reply  Fri Aug 2 18:15:06 2013, Chloe, DailyProgress, ECDL, Assembling ECDL possible_tec_mount.PNG
    Reply  Mon Aug 5 18:47:04 2013, Chloe, DailyProgress, ECDL, Assembling ECDL heating.PNGcooling.PNGnoise_beginning.JPG
    Reply  Tue Aug 6 19:48:19 2013, Chloe, DailyProgress, ECDL, Assembling ECDL 100_0079.JPG
    Reply  Wed Aug 7 18:13:21 2013, Chloe, DailyProgress, ECDL, Assembling ECDL 
    Reply  Thu Aug 8 18:43:44 2013, Chloe, DailyProgress, ECDL, Assembling ECDL 100_0081.JPGcool_bridge.PNGheat_bridge.PNG
    Reply  Fri Aug 9 18:01:47 2013, Chloe, DailyProgress, ECDL, Assembling ECDL cool_bridge2.PNGheat_bridge2.PNG
    Reply  Tue Aug 13 18:13:35 2013, Chloe, DailyProgress, ECDL, Assembling ECDL 
    Reply  Thu Aug 15 18:53:45 2013, Chloe, DailyProgress, ECDL, Assembling ECDL 100_0104.JPG
Entry  Thu Jan 11 13:31:36 2018, awade, Misc, Lab Infrastructure, Ants nesting in PSL lab 20180111_antnestforming.jpg
Entry  Tue May 15 16:53:36 2018, anchal, Notes, BEAT, Analysis for idea of sending beam at Brewster angle to Photo diode InGaAsIncidenceAngleAnalysis.pdfInGaAsIncidenceAngleAnalysis.zip
    Reply  Tue May 15 18:19:05 2018, Koji, Notes, BEAT, Analysis for idea of sending beam at Brewster angle to Photo diode 
Entry  Thu Jul 29 13:08:40 2010, tara, Notes, RefCav, Alignment is Off 
Entry  Thu May 16 13:46:46 2019, anchal, DailyProgress, TempCtrl, Alignment disturbing due to lab temp changes 
Entry  Thu May 27 18:20:42 2010, tarac, Laser, Laser, Aligning RefCav 
Entry  Thu Jun 3 23:55:38 2010, tarac, Laser, Laser, Aligning AOM 2: the Return of the Beam Photo_38.jpg
Entry  Thu Jun 3 00:52:37 2010, tarac, Laser, Laser, Aligning AOM 97-02848-01r0.pdf
    Reply  Thu Jun 3 08:42:44 2010, Frank, Laser, Laser, Aligning AOM AOM3080-194.JPG
    Reply  Thu Jun 3 14:47:58 2010, Frank, Laser, Laser, Aligning AOM 
    Reply  Thu Jun 3 15:45:39 2010, Frank, Laser, Laser, Aligning AOM 
    Reply  Thu Jun 3 22:00:21 2010, Frank, Laser, Laser, Aligning AOM 
Entry  Sat Aug 30 19:10:11 2014, Evan, DailyProgress, NoiseBudget, AlGaAs python noise budget: seismic coupling added noiseBudget.pdf
Entry  Thu Sep 4 11:47:42 2014, Evan, DailyProgress, NoiseBudget, AlGaAs python noise budget: photothermal TFs added photothermalTF.pdfnoiseBudget.pdf
    Reply  Mon Aug 25 20:54:38 2014, Evan, Notes, NoiseBudget, AlGaAs python noise budget: TO implemented noiseBudget.pdf
Entry  Sat Aug 2 23:07:39 2014, Evan, Notes, NoiseBudget, AlGaAs python noise budget noiseBudget.pdf
    Reply  Wed Aug 20 19:00:03 2014, Evan, Notes, NoiseBudget, AlGaAs python noise budget noiseBudget.pdf
Entry  Tue Aug 5 18:10:31 2014, Evan, DailyProgress, optic, AlGaAs mirror transmissions; optical contacting almost.jpgdone.jpg
Entry  Tue Apr 30 01:15:26 2013, tara, Notes, NoiseBudget, AlAs/GaAs layer structure optimized for TO 
    Reply  Thu May 2 03:03:48 2013, tara, Notes, NoiseBudget, AlAs/GaAs layer structure optimized for TO 
    Reply  Thu May 2 23:40:46 2013, tara, Notes, NoiseBudget, AlAs/GaAs layer structure optimized for TO 6x
    Reply  Mon May 6 03:11:44 2013, tara, Notes, NoiseBudget, AlAs/GaAs layer structure optimized for TO RefCav_AlGaAs_TOnoise.png
    Reply  Mon May 6 17:08:25 2013, Matt A., Notes, NoiseBudget, AlAs/GaAs layer structure optimized for TO 
    Reply  Tue May 14 02:06:15 2013, tara, Notes, NoiseBudget, AlAs/GaAs layer structure optimized for TO 
    Reply  Wed May 15 20:07:12 2013, tara, Notes, NoiseBudget, AlAs/GaAs layer structure optimized for TO TO_compare_cap.pngTO_compare_cap.fig
    Reply  Tue May 21 01:06:43 2013, tara, Notes, NoiseBudget, AlAs/GaAs layer structure optimized for TO 
    Reply  Wed May 22 00:04:48 2013, tara, Notes, NoiseBudget, AlAs/GaAs layer structure optimized for TO 
    Reply  Fri May 24 04:04:58 2013, tara, Notes, NoiseBudget, AlAs/GaAs layer structure optimized for TO 
    Reply  Fri May 24 23:57:27 2013, tara, Notes, NoiseBudget, AlAs/GaAs layer structure optimized for TO 6x
    Reply  Thu Jun 6 22:28:46 2013, tara, Notes, NoiseBudget, AlAs/GaAs layer structure optimized for TO eighth.png
    Reply  Mon Jul 15 10:55:40 2013, tara, Notes, NoiseBudget, AlAs/GaAs layer structure optimized for TO alGaAsnb.pngalGaAsnb.fig
Entry  Fri Mar 15 11:23:45 2013, tara, Notes, optic, AlAs/GaAs edgeloss.pngnoise_compare.png
    Reply  Sun Mar 17 16:09:10 2013, Evan, Notes, optic, AlAs/GaAs 0.5m_ROC_modematch.pdf1m_ROC_modematch.pdf
Entry  Tue May 28 18:23:48 2013, Evan, DailyProgress, Electronics Equipment, Adjusted TTFSS offset; plugged RFPD DC into daq 
Entry  Thu Apr 25 20:24:27 2019, anchal, Summary, Electronics Equipment, Adjustable TTL Trigger Generator Box Adjustable_TTL_Trigger_Generator_Box.pdf
ELOG V3.1.3-