  1938   Sun Oct 1 15:59:57 2017 ranaMiscComputersBURTThis is very similar to the BURT
and autoBURT system that we usually run with
EPICS. It does hourly snapshots of all settings
  
  1461   Tue Jul 29 11:40:09 2014 EvanDailyProgressopticBRDF of AlGaAs mirror 143[Tara, Evan]
Yesterday we took a scatter measurement
of AlGaAs mirror #143. Instead of one bright
 143brdf.pdf 
  1462   Wed Jul 30 17:47:56 2014 taraDailyProgressopticBRDF of AlGaAs mirror 143 I
used the setup to measure scattered loss
from an REO mirror (mirror for iLIGO refcav,
  
  1466   Tue Aug 5 08:14:14 2014 EvanDailyProgressopticBRDF of AlGaAs mirror 141 after cleaningIncident power: 20.0(1) mW
Exposure times used: 25 ms, 50 ms,
200 ms, 500 ms, 1000 ms
 141brdf.pdf 
  1460   Sun Jul 27 19:46:16 2014 EvanDailyProgressopticBRDF of AlGaAs mirror 137B1[Tara, Evan]
We replaced the Lambertian diffuser
with AlGaAs mirror 137B1. We intentionally
 ccdImage.pdf137brdf.pdf 
  1467   Tue Aug 5 14:54:36 2014 EvanDailyProgressopticBRDF of AlGaAs mirror 132 after cleaning

    

       
            
 132brdf.pdf 
  1465   Mon Aug 4 15:23:06 2014 EvanDailyProgressopticBRDF of AlGaAs mirror 114 after cleaning[Tara, Evan]
Tara also took a BRDF measurement
of #114 after cleaning it.
 114_cleaned_brdf.pdf 
  1463   Thu Jul 31 09:40:24 2014 EvanDailyProgressopticBRDF of AlGaAs mirror 114[Tara, Evan]
Tara took a BRDF measurement yesterday
of AlGaAs mirror #114.
 114brdf.pdf 
  2085   Fri Feb 9 18:50:06 2018 awade, CraigDailyProgressBEATBN spectrum Feb 09, 2018These measurments followed some dumping
work around the refcav relfection photodiodes.
See, PSL:2084.
 PLLOLTF_09-02-2018_182645_TF.pdf20180209_190340_CalibratedSpectrum_Spectrum.pdf20180209_dailyBNSpectrum.tar.gz 
  2080   Thu Feb 8 16:48:07 2018 awade, CraigDailyProgressNoiseBudgetBN spectrum Feb 08, 2018Checking PLL OLG

Measured the
OLG using out1/out2 method.  Did the
G/(1+G) invertion to OLG directly on the
 20180208_172015_PLLOLTF_08-02-2018_171734.pdf20180208_175847_CalibratedSpectrum.pdf20180208_dailyBNSpectrum.tar.gz 
  2532   Thu Feb 13 16:35:32 2020 anchalDailyProgressBEATBN Detector was saturated. Reduced laser powers.I found that the beatnote detector was
actually saturating and the output was not
a good pure sinewave. I've reduced the
  
  1519   Mon Sep 15 18:29:47 2014 EvanDailyProgressBEATAttempts at scatter reductionI went through the table today looking
for ghost beams. Most were already dumped.
For those that weren't, I put down a dump
  
  1521   Tue Sep 16 15:08:57 2014 EvanDailyProgressBEATAttempts at scatter reduction

    

       
            
  
  1361   Tue Oct 8 23:01:56 2013 EvanDailyProgressBEATAttempts at new beat measurement[Tara, Evan]
Having successfully floated the table
yesterday, we attempted a new beat measurement
  
  1272   Thu Aug 1 03:34:35 2013 ChloeDailyProgressECDLAssembling ECDLToday I worked on updating my progress
report and abstract. Posted to the SVN. 
Our machined parts were finished
  
  1273   Thu Aug 1 18:33:12 2013 ChloeDailyProgressECDLAssembling ECDLToday I tried to set up the TEC on the
actual assembly. When doing so, Tara pointed
out that I needed to have a separate temperature
 tempsensor.PNG 
  1277   Fri Aug 2 18:15:06 2013 ChloeDailyProgressECDLAssembling ECDLToday I calibrated the PID gain on the
TEC. In order to do this, I used a silicone
heat sink compound to help the thermal conductivity
 possible_tec_mount.PNG 
  1281   Mon Aug 5 18:47:04 2013 ChloeDailyProgressECDLAssembling ECDL I brought in a different USB drive
to get data off of the oscilloscope. It took
awhile to figure out how to capture the data
 heating.PNGcooling.PNGnoise_beginning.JPG 
  1283   Tue Aug 6 19:48:19 2013 ChloeDailyProgressECDLAssembling ECDL I calculated a way to convert our
spectrum measurement of voltage from the
photodiode to the frequency noise of the
 100_0079.JPG 
  1285   Wed Aug 7 18:13:21 2013 ChloeDailyProgressECDLAssembling ECDL

    

       
            
  
  1289   Thu Aug 8 18:43:44 2013 ChloeDailyProgressECDLAssembling ECDL Today I designed a better circuit
to measure the TEC's response with the oscilloscope.
It is called a bridge circuit, and allows
 100_0081.JPGcool_bridge.PNGheat_bridge.PNG 
  1292   Fri Aug 9 18:01:47 2013 ChloeDailyProgressECDLAssembling ECDL I spent awhile reading about PID
controllers in order to understand how to
tune the TEC. P represents proportional gains,
 cool_bridge2.PNGheat_bridge2.PNG 
  1297   Tue Aug 13 18:13:35 2013 ChloeDailyProgressECDLAssembling ECDLMade some modifications to the Solidworks
design. All of these have been changed on
the SVN. 
  
  1299   Thu Aug 15 18:53:45 2013 ChloeDailyProgressECDLAssembling ECDL

    

       
            
 100_0104.JPG 
  2042   Thu Jan 11 13:31:36 2018 awadeMiscLab InfrastructureAnts nesting in PSL labThere are a large number of ants making
a trail from the ATF lab to the PSL lab. 
They seem to be heading into a hole next
 20180111_antnestforming.jpg 
  2187   Tue May 15 16:53:36 2018 anchalNotesBEATAnalysis for idea of sending beam at Brewster angle to Photo diodeRecently we were given the idea of sending
the beam to the photodiode at Brewster angle.
If we do so, ideally one particular polarization
 InGaAsIncidenceAngleAnalysis.pdfInGaAsIncidenceAngleAnalysis.zip 
  2188   Tue May 15 18:19:05 2018 KojiNotesBEATAnalysis for idea of sending beam at Brewster angle to Photo diodeSee https://dcc.ligo.org/LIGO-T1100564/public

See also: https://arxiv.org/abs/1710.07399
or https://doi.org/10.1364/AO.57.003372
  
  246   Thu Jul 29 13:08:40 2010 taraNotesRefCavAlignment is OffThis morning Megan tried to lock RefCav,
but the alignment was off. I realigned it,
and now it's locked.
  
  2347   Thu May 16 13:46:46 2019 anchalDailyProgressTempCtrlAlignment disturbing due to lab temp changesAs suspected in CTN: 2346, the
mode matching of the cavities is deteriorating
and eventually alignment is getting screwed
  
  133   Thu May 27 18:20:42 2010 taracLaserLaserAligning RefCavI switched the cable from the 10W controller
to the original controller for 100 mW laser.
It is working well now, the cables are tied
  
  145   Thu Jun 3 23:55:38 2010 taracLaserLaserAligning AOM 2: the Return of the BeamI'm aligning
double pass AOM. After maximizing the power
of the 1st order of the transmitted beam,
 Photo_38.jpg 
  140   Thu Jun 3 00:52:37 2010 taracLaserLaserAligning AOM I'm aligning the AOM and maximizing
the diffracted beam's power by positioning
the AOM and adjusting the beam size by moving
 97-02848-01r0.pdf 
  141   Thu Jun 3 08:42:44 2010 FrankLaserLaserAligning AOM


   
        
            
 AOM3080-194.JPG 
  142   Thu Jun 3 14:47:58 2010 FrankLaserLaserAligning AOM


   
        
            
  
  143   Thu Jun 3 15:45:39 2010 FrankLaserLaserAligning AOM


   
        
            
  
  144   Thu Jun 3 22:00:21 2010 FrankLaserLaserAligning AOM


   
        
            
  
  1495   Sat Aug 30 19:10:11 2014 EvanDailyProgressNoiseBudgetAlGaAs python noise budget: seismic coupling addedSame data and same isolation model as for
the silica/tantala noise budget. Since we
have new table legs, we should retake this
 noiseBudget.pdf 
  1501   Thu Sep 4 11:47:42 2014 EvanDailyProgressNoiseBudgetAlGaAs python noise budget: photothermal TFs addedThe first attachment shows the photothermal
TFs which take absorbed power (in watts)
to the mirror displacement (in meters) as
 photothermalTF.pdfnoiseBudget.pdf 
  1485   Mon Aug 25 20:54:38 2014 EvanNotesNoiseBudgetAlGaAs python noise budget: TO implemented

    

       
            
 noiseBudget.pdf 
  1464   Sat Aug 2 23:07:39 2014 EvanNotesNoiseBudgetAlGaAs python noise budgetI have started a python implementation
of the AlGaAs noise budget. All parameters,
functions, etc. are defined in a single notebook,
 noiseBudget.pdf 
  1482   Wed Aug 20 19:00:03 2014 EvanNotesNoiseBudgetAlGaAs python noise budget

    

       
            
 noiseBudget.pdf 
  1468   Tue Aug 5 18:10:31 2014 EvanDailyProgressopticAlGaAs mirror transmissions; optical contactingI used the ThorLabs power meter to get
the transmission coefficients for the five
AlGaAs mirrors.
 almost.jpgdone.jpg 
  1163   Tue Apr 30 01:15:26 2013 taraNotesNoiseBudgetAlAs/GaAs layer structure optimized for TOI'm computing  coating Brownian and
thermo optic noise (TO)  in AlGaAs coatings
using GWINC code to compare it with the result
  
  1168   Thu May 2 03:03:48 2013 taraNotesNoiseBudgetAlAs/GaAs layer structure optimized for TO[matt, tara] Got AlxGa1-xAs
material parameters from Matt Abernathy.
I plug the numbers (all in SI) in GWINC,
  
  1169   Thu May 2 23:40:46 2013 taraNotesNoiseBudgetAlAs/GaAs layer structure optimized for TOI used GWINC code to calculate TO noise
in AlGaAs coatings, with some modifications
to the code I can get the result that is
 6x 
  1170   Mon May 6 03:11:44 2013 taraNotesNoiseBudgetAlAs/GaAs layer structure optimized for TOI checked the calculation for TO noise
in Cole etal people and found a few problems
that I didn't understand.
 RefCav_AlGaAs_TOnoise.png 
  1171   Mon May 6 17:08:25 2013 Matt A.NotesNoiseBudgetAlAs/GaAs layer structure optimized for TOI sent this to Tara in an
email, but I thought I'd include it here
for posterity:
  
  1176   Tue May 14 02:06:15 2013 taraNotesNoiseBudgetAlAs/GaAs layer structure optimized for TO[matt,tara]  We compared the TO result
using GWINC, our results are similar (see
PSL:1170).
  
  1177   Wed May 15 20:07:12 2013 taraNotesNoiseBudgetAlAs/GaAs layer structure optimized for TOWe checked the half wave cap solution for 
minimizing TO noise. WIth a half wave cap
of nl, the TO noise is smaller by ~ a factor
 TO_compare_cap.pngTO_compare_cap.fig 
  1178   Tue May 21 01:06:43 2013 taraNotesNoiseBudgetAlAs/GaAs layer structure optimized for TOI checked all the discrepancies in the
calculations between GWINC and that of Cole.
The issues are almost cleared, only the value
  