40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  PSL, Page 4 of 52  Not logged in ELOG logo
ID Date Authorup Type Category Subject Text Attachments
  1236   Thu Jul 11 17:51:12 2013 ChloeDailyProgressECDLSolidworks Design Tara got me the information about
the adjustable collimator tube he ordered
(http://www.thorlabs.us/thorproduct.cfm?partnumber=SM1L30C).
 lid.PNGsketch_without_lid.PNG 
  1238   Fri Jul 12 15:25:56 2013 ChloeDailyProgressECDLSolidworks Design 
 
 
  
  1244   Thu Jul 18 16:34:22 2013 ChloeDailyProgressECDLSolidworks DesignSorry, I've been out for awhile since I
had an extremely bad reaction to some medication.
Only just starting to recover but I'll work
  
  1246   Mon Jul 22 18:30:20 2013 ChloeDailyProgressECDLSolidworks DesignTara and I received the parts we ordered
from Thorlabs. I will be working in the ATF
lab on the corner of one of the optical tables.
 final_3d.PNGfinal_top.PNG 
  1253   Tue Jul 23 17:59:47 2013 ChloeDailyProgressECDLSolidworks Design 
Tara heard back from the machine
shop, and they can do 1/4-80 threading. I
  
  1254   Wed Jul 24 18:13:05 2013 ChloeNotesECDLCurrent DriverRana wants for me to build my own low noise
driver, since anything on the market isn't
sufficient or is terribly expensive. Dmass
  
  1255   Thu Jul 25 18:13:11 2013 ChloeNotesECDLCurrent Driver/TECCurrent driver: the plan for the summer
is to use the current driver that Tara found,
the LDX-3412. Dmass has a low noise current
 thermistor_temperature-resistance.xlsx 
  1259   Fri Jul 26 17:51:02 2013 ChloeNotesECDLCurrent Driver/TECI figured out how to calibrate the potentiometers
for the TEC. The three potentiometers (labeled
P, I, and D) control how quickly the TEC
  
  1262   Mon Jul 29 19:06:31 2013 ChloeNotesECDLCurrent Driver/TEC 
I worked on my SURF progress report
and abstract (due Friday, August 2). The
  
  1268   Tue Jul 30 17:55:21 2013 ChloeNotesECDLCurrent Driver/TECI fixed the solder joints on the TEC by
using heat shrink to make sure nothing short
circuits. I figured it would be cautious
 working!.jpg 
  1272   Thu Aug 1 03:34:35 2013 ChloeDailyProgressECDLAssembling ECDLToday I worked on updating my progress
report and abstract. Posted to the SVN. 
Our machined parts were finished
  
  1273   Thu Aug 1 18:33:12 2013 ChloeDailyProgressECDLAssembling ECDLToday I tried to set up the TEC on the
actual assembly. When doing so, Tara pointed
out that I needed to have a separate temperature
 tempsensor.PNG 
  1277   Fri Aug 2 18:15:06 2013 ChloeDailyProgressECDLAssembling ECDLToday I calibrated the PID gain on the
TEC. In order to do this, I used a silicone
heat sink compound to help the thermal conductivity
 possible_tec_mount.PNG 
  1281   Mon Aug 5 18:47:04 2013 ChloeDailyProgressECDLAssembling ECDL I brought in a different USB drive
to get data off of the oscilloscope. It took
awhile to figure out how to capture the data
 heating.PNGcooling.PNGnoise_beginning.JPG 
  1283   Tue Aug 6 19:48:19 2013 ChloeDailyProgressECDLAssembling ECDL I calculated a way to convert our
spectrum measurement of voltage from the
photodiode to the frequency noise of the
 100_0079.JPG 
  1285   Wed Aug 7 18:13:21 2013 ChloeDailyProgressECDLAssembling ECDL

    

       
            
  
  1289   Thu Aug 8 18:43:44 2013 ChloeDailyProgressECDLAssembling ECDL Today I designed a better circuit
to measure the TEC's response with the oscilloscope.
It is called a bridge circuit, and allows
 100_0081.JPGcool_bridge.PNGheat_bridge.PNG 
  1292   Fri Aug 9 18:01:47 2013 ChloeDailyProgressECDLAssembling ECDL I spent awhile reading about PID
controllers in order to understand how to
tune the TEC. P represents proportional gains,
 cool_bridge2.PNGheat_bridge2.PNG 
  1294   Mon Aug 12 18:21:03 2013 ChloeDailyProgressECDLSURF Presentation Tara would like me to present at
the SURF Seminar Day in August (either on
the LIGO field trip to the Livingston Observatory
  
  1297   Tue Aug 13 18:13:35 2013 ChloeDailyProgressECDLAssembling ECDLMade some modifications to the Solidworks
design. All of these have been changed on
the SVN. 
  
  1299   Thu Aug 15 18:53:45 2013 ChloeDailyProgressECDLAssembling ECDL

    

       
            
 100_0104.JPG 
  1304   Fri Aug 16 19:43:01 2013 ChloeDailyProgressECDLFree Running Noise of Bare Laser Diode Today Tara and I worked on getting
a noise measurement for the bare laser diode
using a Michelson interferometer with different
 michelsonsetup.jpg1cm_and_5cm.png 
  1306   Sun Aug 18 15:06:29 2013 ChloeDailyProgressECDLSURF Presentation Newest version on the SVN with the
latest data and Tara's commentary from my
practice presentation. I'll probably end
  
  1357   Mon Sep 30 15:45:09 2013 ChloeDailyProgressECDLTEC Construction Today I tried to calibrate the PID
gain for the TEC controller. I noticed some
connections needed repairing to I resoldered
  
  1358   Wed Oct 2 16:21:11 2013 ChloeDailyProgressECDLTEC Construction Today Tara showed me where to find
isopropanol in order to clean the Peltier
element. After cleaning it carefully, the
  
  1362   Wed Oct 9 16:12:39 2013 ChloeDailyProgressECDLTEC ConstructionTara mentioned that the TEC may not work
as well without some of the silicone thermal
paste so I added some and returned the PID
  
  1364   Thu Oct 10 16:59:59 2013 ChloeDailyProgressECDLFree Running Noise Experiment Today, I met with Tara and discussed
the delay line, which will be used to tune
the wavelength of the bare laser diode and
 Photo_on_10-10-13_at_4.49_PM.jpg 
  1366   Mon Oct 14 17:38:10 2013 ChloeDailyProgressECDLFree Running Noise Experiment 
I got the modified grating design
into the Caltech machine shop; this part
  
  1371   Wed Oct 23 15:16:25 2013 ChloeDailyProgressECDLFree Running Noise Experiment 
Note: last week I picked up the modified
diffraction grating mount. I forgot to bring
  
  1826   Thu Mar 9 18:15:23 2017 CraigDailyProgressFSSNorth vs South Path Spectra, OLGs, and CrossoversEdit (awade, Sun Mar 19 21:42:11 2017)
-- Fixed linking to plots. Under inserted
figure url need to add ?thumb=1 to end to
 6x 
  1843   Mon Jul 24 23:47:52 2017 CraigDailyProgressEOMEE Shop Power Supply RepairThe DC Power Supply in the EE shop had
a broken negative banana plug terminal, so
I replaced it.
 PowerSupplyFix.gif 
  1872   Mon Aug 21 19:33:27 2017 CraigDailyProgressBEATCalibrated Spectrum in Hz/rtHzI tried to calibrate our ASD spectrum into
units Hz/rtHz.

To do this, I retook our demodulated
 20170821_185329_CalibratedSpectrum.pdf20170821_181139_PLL_OLGTFs.pdf20170821_190252_TransBeatnoteSpectrum.pdfCalSpec.tar.gz 
  1885   Tue Aug 29 00:12:44 2017 CraigDailyProgressBEATCalibrated Spectrum in Hz/rtHzI fixed the beatnote calibration script. 
I thought about it more, and figured out
the math was wrong.  Now I have implemented
 20170829_000237_CalibratedSpectrum.pdf 
  1886   Tue Aug 29 22:44:11 2017 CraigHowToComputersGenerating public-private keypairs for ssh sessionsThis was great...
thanks a lot "Andrew".
  
  1891   Sat Sep 2 01:38:27 2017 CraigDailyProgressBEATSept 1st Calibrated SpectrumI took 5 spectra, 4 with the Agilent
at high freq from 1kHz to 5 MHz and
1 with the SR785
 20170902_005925_CalibratedSpectrum.pdf20170902_003309_OLG_from_PLL_EXC_to_OUT2_02-09-2017_000601.pdf20170902_001540_PLL_EXC_to_OUT2_02-09-2017_000601.pdf20170901_235334_TransBeatnote_5MHzStop_01-09-2017_234323.pdf 
  1912   Tue Sep 12 17:40:14 2017 CraigDailyProgressComputersNew Workstation to Acromag Communications RestoredFor some reason the new workstation we
have in the lab was not communication with
our acromag cards, leading to hours of confusion
  
  1919   Fri Sep 15 02:05:46 2017 CraigSummaryNoiseBudgetNoise Budget SummaryThe noise budget posted in the previous
noisebudget elog has been described by experts
as "bunk".  I am here to right
 20170915_012259noiseBudget.pdf 
  1930   Tue Sep 19 01:06:36 2017 CraigDailyProgressElectronics EquipmentRack is PoweredThe rack has been powered.

I made, installed, and powered
the +/- 24V and +/- 18V LIGO DC power rails
 RackIsAlive.pdf 
  1948   Wed Oct 11 20:49:48 2017 CraigDailyProgressLaserCalibration of Slow Volts into Laser Frequency HertzI made a script called SlowVoltageToHertzCalibration.py
in the ctn_labdata/scripts/ Git repo. 
It takes in a cavity scan like those found
 Aug-17-2017_120200_NorthLaserSlowControlVoltageVsTransPower.pdfAug-17-2017_115409_SouthLaserSlowControlVoltageVsTransPower.pdf 
  1955   Mon Oct 23 15:11:50 2017 CraigDailyProgressFSSNorth TTFSS Box Common Path Feedback Resistor RepairedToday I was starting measurements of the
North TTFSS, when I noticed that the 100Ω
metal film feedback resistor on the Common
 NorthCommonPath_FeedbackResistorGone.jpgNorthCommonPath_FeedbackResistorPostRepair.jpg 
  1966   Tue Oct 31 22:56:29 2017 CraigDailyProgressTempCtrlBeatnote FluctuationsWe have to figure out why our beatnote
is flying around if we are going to do science
down here.  It's preventing us from
  
  1967   Wed Nov 1 00:22:08 2017 CraigDailyProgressNoiseBudgetOctober Calibrated Spectrum for the Noise BudgetI have added an October spectrum to the
noise budget, it's the first plot below. 
Click
 20171031_235032noiseBudget.pdfOLG_from_PLL_Suppressed_Gain_TF_30-10-2017_164727_TF.pdfOLG_from_PLL_Suppressed_Gain_TF_30-10-2017_164727.tgz 
  1969   Thu Nov 2 23:54:24 2017 CraigDailyProgressTempCtrlSpooky Results from 2017 Oct 31 Beatnote TrackingTwo days ago I set up the Agilent to keep
taking spectra overnight while I tracked
some relevant channels (elog
 20171102_220215_TrackedBeatnote_Spectrum.pdf20171102_220215_TrackedBeatnote.tgz 
  1970   Fri Nov 3 19:11:54 2017 CraigDailyProgressFSSSouth FSS PZT Spectrum Calibrated and put into the noisebudgetWe are wondering what noise is limiting
our trans beatnote measurements.  We
suspect the FSS is particularly noisy, so
 20171103_182930noiseBudget.pdf 
  1973   Tue Nov 7 20:56:48 2017 CraigDailyProgressPLLPLL Beatnote Tracking through GPIB 




  
  1975   Thu Nov 9 00:20:02 2017 CraigDailyProgressPLLPLL OLGTFs with different Frequency Modulation LevelsWith
the help of the PLL autolocker, I retook
the OLG of the PLL with a frequency modulation
 7x 
  1982   Tue Nov 14 01:31:41 2017 CraigDailyProgressISSLow Pass Dual Voltage Follower for locking the ISSWe need to lock our ISS to the PD output
in real time without worrying about DC fluctuations
in the PD response.
 ISSBox_1.jpgISSBox_2.jpgISSBox_3.jpgISSBox_4.jpg 
  1983   Wed Nov 15 14:53:06 2017 CraigDailyProgressBEATFSS Fast Gain Effect on Beatnote SpectrumI was wondering what is causing our huge
mountain at 10 kHz.  awade said it might
be the PZT EOM crossover with gain peaking. 
  
  1984   Wed Nov 15 14:54:30 2017 CraigDailyProgressBEATFSS Fast Gain Effect on Beatnote SpectrumI was wondering what is causing our huge
mountain at 10 kHz.  awade said it might
be the PZT EOM crossover with gain peaking. 
 TransBeatnote_BothPathsFastGain_0V_15-11-2017_134517_Spectra.pdfTransBeatnote_BothPathsFastGain_0V_15-11-2017_134517.tgz 
  1986   Wed Nov 15 17:33:10 2017 CraigDailyProgressPDPD Dark Noise and Shot Noise calculationCraig response to RXA:  I had forgotten
to take into account the reduced power on
the reflection PDs when the cavity is locked. 
 PSLShotNoiseCalculation.zipStitchedSpectrum_NorthFSSBox_DarkNoise_Span_102p4kHz_15-11-2017_152453_Spectra.pdfStitchedSpectrum_NorthFSSBox_DarkNoise_Span_102p4kHz_15-11-2017_152453.tgzStitchedSpectrum_NorthFSSBox_DarkNoise_Span_102p4kHz_15-11-2017_152453_Spectra.pdfStitchedSpectrum_NorthFSSBox_DarkNoise_Span_102p4kHz_15-11-2017_152453.tgz 
ELOG V3.1.3-