40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  PSL, Page 49 of 52  Not logged in ELOG logo
ID Date Author Type Category Subjectup Text Attachments
  791   Sat Jan 21 01:20:28 2012 FrankDailyProgressRefCavrefcav workre-did the RF wiring for both cavities:

    Power splitters are now
located on the table below the TTFSS box.
  
  793   Mon Jan 23 09:16:43 2012 ranaDailyProgressRefCavrefcav work 
 The PD seems certainly good
enough - no need for new pre-amp. With such
  
  794   Mon Jan 23 11:36:18 2012 FrankDailyProgressRefCavrefcav workRight, it's certainly good enough for now
and the next months. However there are better
opamps available which might give us a better
  
  112   Sun May 2 19:18:36 2010 FrankMiscRefCavreference cavity moved to new chamberi finally moved the reference cavity to
the new chamber and pump it since Friday.
The legs are now insulated and it comes with
  
  298   Thu Aug 19 19:17:44 2010 FrankSummaryDAQremoved connecting blocks J21 & J22removed both 9-pin D-SUB blocks (blocks
J21 & J22) which were used for the RF
photodiodes (PMC, RCAV) before (only to power
  
  420   Mon Dec 6 22:09:59 2010 frank, taraDailyProgressBEATreplacing PMC, adding EAOM Today we 1)replaced out PMC with
DMASS' PMC and get better transmission efficiency,
2) added EAOM to modulate the laser intensity
 beat_2010_12_07.png 
  946   Fri Apr 27 22:37:54 2012 taraDailyProgressBEATreplacing one mirror mount in beat pathOne of the mirror mount in beat path was
not properly mounted on the board because
of the limited space. I changed that mirror
 IMG_0841.jpgIMG_0842.jpgbeat_2012_04_27.png 
  956   Wed May 9 19:59:44 2012 taraNotesSeismicreplacing table legsI'm replacing our table legs with the ones
from Jan's lab.  Those should be a little
newer than the one we are using. However,
 IMG_0894_1.jpgIMG_0893.jpg 
  958   Thu May 10 16:04:24 2012 taraNotesPurchasesreplacing table legsThere are no spare leveling valve at 40m,
I'll buy a set of new one from Newport. It
costs ~ $ 800. I asked Eric and he said to
  
  959   Fri May 11 01:00:42 2012 taraNotesPurchasesreplacing table legsFrank told me to get the leveling pressure
from Cryo table. Now I have enough for the
table (a set of three), so I don't need to
  
  962   Tue May 15 21:57:49 2012 frank, taraDailyProgressSeismicreplacing table legsThe leveling valve for table legs are installed.
With the new legs, the beam can maintain
its alignment better than before (from 30
 IMG_0930.JPGIMG_0931.jpg 
  963   Wed May 16 22:25:06 2012 frank, taraDailyProgressSeismicreplacing table legsWe check the leak. There are no obvious
leak on the hose or connectors. It appears
that the current leveling valves are more
  
  2   Sun Nov 8 14:35:25 2009 FrankLaserRefCavresonance frequenciesi checked the resonant frequency of both
cavities in order to see if we can lock both
using the existing frequency actuator (AOM)
  
  4   Mon Nov 9 02:19:45 2009 ranaLaserRefCavresonance frequenciesI don't know if its worth the trouble,
but we do have a ~200 MHz AOM. Sam Waldman
had us buy one of these for doing the OMC
  
  5   Mon Nov 9 18:49:15 2009 FrankLaserRefCavresonance frequencies


   
        
            
  
  1296   Tue Aug 13 12:39:36 2013 EricaDailyProgressfiber opticrewrote calculations for converting from voltage noise to frequency noiseThe equation for voltage is derived here:
[URL=http://nodus.ligo.caltech.edu:8080/PSL_Lab/1241]1241[/URL]
 P1030458.JPGP1030459.JPGP1030460.JPG 
  712   Mon Oct 24 21:20:26 2011 frank, taraDailyProgressFSSrf summing box We check modulation depth of the
PDH signal to see if we have enough modulation
depth or not. The result will be analyzed
 setup.pngIMG_2176.JPG 
  651   Thu Aug 4 22:45:10 2011 RaphaelDailyProgressElectronics Equipmentrfpd progressI measured the shot noise again because
the data I got yesterday was kind of garbage.
I tried to get an error estimate by taking
  
  717   Thu Oct 27 20:45:58 2011 frank, taraNotesSeismicring down measurement for rubber springWe did ring down measurement of the rubber
cone used for supporting the seismic isolation
stacks. The resonant frequency and Q of the
 fit4.pngfit1.pngcomparefit.pnghist.png 
  721   Thu Nov 3 01:55:03 2011 FrankNotesSeismicring down measurement for rubber springThe total mass of the load   
  479   Tue Feb 8 00:26:44 2011 frank, taraDailyProgressRefCavrunning thermal PID perl scriptWe installed ezca library on PLS's Sun
machine. Now, we can run perl script for
Refcav thermalPID control.
 2011_02_07_RCPID.png 
  484   Wed Feb 9 15:41:45 2011 frank, taraDailyProgressRefCavrunning thermal PID perl scriptThe thermal control perl script is added
for ACAV. The file is saved in SUN machine,
all channels are renamed for ACAV and the
  
  153   Tue Jun 8 20:16:21 2010 taracLaserLaserscanning ACavNow I'm
working on aligning the beam into ACav. I
got the reflected light on the PD, and I'll
 aom_eff.png 
  154   Wed Jun 9 03:55:40 2010 FrankLaserLaserscanning ACavThere is no attenuator connected to the
AOM. The device on the AOM (the white attenuator
looking like thing) is a 
  
  156   Wed Jun 9 03:55:41 2010 FrankLaserLaserscanning ACavThere is no attenuator connected to the
AOM. The device on the AOM (the white attenuator
looking like thing) is a 
  
  155   Wed Jun 9 03:55:41 2010 FrankLaserLaserscanning ACavThere is no attenuator connected to the
AOM. The device on the AOM (the white attenuator
looking like thing) is a 
  
  157   Thu Jun 10 00:21:15 2010 taracLaserLaserscanning ACavI'm
scanning the laser to align ACav. It's a
long day of adjusting 4 knobs and 1 lens
 Photo_42.jpg 
  158   Fri Jun 11 01:04:42 2010 taracLaserLaserscanning Acav2From yesterday,
after getting TEM 00 out of the cavity, I
  
  899   Fri Apr 6 00:34:28 2012 ranaHowToNoiseBudgetscattered light huntingHow
to find parasitic scatterers by
the GEO600 gang.
  
  374   Wed Oct 27 13:12:12 2010 taraNotesEnvironmentschedule for pipes installation  At 8:30 am, tomorrow, a workman will
come in and install two pipes in the lab.
The pipes will be brazed, so no smoke
  
  375   Thu Oct 28 10:49:53 2010 taraNotesEnvironmentschedule for pipes installation The pipes are installed. The insulation
for the pipes will be installed on Nov 2,
Tuesday 8:30am.
  
  377   Tue Nov 2 17:50:33 2010 taraNotesEnvironmentschedule for pipes installation The insulation work is done.  

  
  212   Tue Jul 13 14:46:23 2010 taraNotesFSSschematic for FSS servoThe current FSS servo we are using is labeled
D980536 Rev. C on the PCB, but the schematic
that matches the PCB more is D980536-D (there
 D980536-D.pdf 
  859   Sat Mar 3 14:52:40 2012 FrankNotesTempCtrlscript crashed - restartedthe temp control script crashed with an
epics exception some time ago - the reason
why it took forever to heat the chamber.
  
  1274   Thu Aug 1 21:19:57 2013 taraDailyProgressBEATsearching for beatI locked both cavities and trying to search
for the beat signal, I have not succeeded
yet.
  
  1275   Fri Aug 2 12:18:16 2013 taraDailyProgressBEATsearching for beatFound the beat @ 116 MHz. RCAV SLOW =5.762V,
ACAV SLOW = 1.209 V. 
 beat_2012_08_02.JPGnb_short_cav.png 
  702   Mon Oct 10 21:30:45 2011 Tara, FrankSummarySeismicsecond leg replacedwe have replaced the second leg which was
leaking. It could be that the legs are simply
to old and the rubber got brittle. As far
  
  703   Wed Oct 12 00:53:40 2011 Tara, FrankSummarySeismicsecond leg replacedAs the table was floated, we measured the
noise from error point again.
 
  
  705   Thu Oct 13 02:36:58 2011 Tara, FrankSummarySeismicsecond leg replacedAfter optimized everything, I repeated
the measurement that was done in this entry
 plot_2011_10_12.pngplot_2011_10_12.fig 
  734   Wed Nov 16 19:11:38 2011 taraNotesNoiseBudgetseimic coupling to beat noiseSeismic noise is currently a limiting source
for our setup, here is a list for what we
have to do for figuring out the coupling
  
  687   Tue Sep 20 00:12:46 2011 ranaDailyProgressBEATseismic noise couplingBy taking the passive transfer function
between a vertical seismometer on the table
and the individual cavity signals, we should
  
  688   Tue Sep 20 01:49:44 2011 FrankDailyProgressBEATseismic noise couplingTara showed me a quick plot which showed
the spectrum taken with the new (current)
setup and the one taken when we removed the
  
  690   Wed Sep 21 01:39:11 2011 taraDailyProgressBEATseismic noise couplingThe beat signal I measured today(orange)
has noise level close to what we had before
(blue,purple), so I'll try to check it again
 beat_2011_09_20_m.pngbeat_2011_09_20_m.fig 
  432   Thu Dec 16 12:38:57 2010 Frank, JanDailyProgressEnvironmentseismometer installed on PSL tableJan and I installed one of his seismometers
on the PSL table to get some seismic data
for the noise projection.
  
  550   Wed Mar 23 23:22:28 2011 taraDailyProgressElectronics Equipmentsensing noise checkingOK, so what I did
1) Compare the sensing noise between
ACAV and RcAV loop.
 beat_10kHz.pngenoise.pngTFacav72.pngacav_noise.png 
  551   Thu Mar 24 00:02:57 2011 FrankDailyProgressElectronics Equipmentsensing noise checkingBe very careful comparing the plain numbers!
You have different error signal slopes so
the corresponding frequency noise level for
  
  554   Thu Mar 24 23:46:13 2011 taraDailyProgressElectronics Equipmentsensing noise checkingHere is the noise plot for ACAV electronic
noise. It is basically the same as yesterday
plot,
 acav_enoise.pngbeat_10kHz_sensing.pngRFPDcompare.pngmixernoise.png 
  1449   Tue Jul 15 18:26:20 2014 taraDailyProgressopticsetting up scattered light measurementI'm setting up a scattered
light measurement for AlGaAs samples. The
methods are summarized below.
 photo.JPG 
  1452   Thu Jul 17 18:57:54 2014 taraDailyProgressopticsetting up scattered light measurementI'm testing the setup and
a code for extracting scattered light from
the images. 
 dark1.pnglight.pngresidual.pngscattered_.zip 
  1455   Wed Jul 23 00:28:14 2014 taraDailyProgressopticsetting up scattered light measurementI'm checking
the linearity of power and exposure on the
camera. The ccd counts are quite linear with
 exp_vs_light.pngpower.png 
ELOG V3.1.3-