40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  PSL, Page 48 of 52  Not logged in ELOG logo
Entry  Tue Jun 26 16:13:30 2012, Frank, DailyProgress, PD, power still drifting 
Entry  Thu Dec 17 18:13:01 2009, Frank, Electronics, RefCav, power supply remote programming 100_0437.JPG000_0005.jpg
Entry  Thu Aug 6 23:49:10 2015, Antonio, Summary, FSS, power transmitted through the cavities and control signal Windows_Phone_20150806_16_47_21_Pro.jpgWindows_Phone_20150806_18_30_46_Pro.jpgWindows_Phone_20150806_20_03_18_Pro.jpg
Entry  Sat Apr 9 15:53:43 2011, Frank, Notes, Vacuum, pressure OK 
Entry  Thu Apr 7 23:18:49 2011, koji, frank, tara, DailyProgress, Seismic, previous suspension for RCAV restored 000_0014.jpg000_0018.jpg
Entry  Thu Sep 9 02:20:32 2010, tara, Notes, , problem about PBS/QWP  
Entry  Thu Sep 9 02:20:32 2010, tara, Notes, , problem about PBS/QWP  
Entry  Fri Jun 4 22:10:24 2010, tarac, Laser, Laser, progress on PSL setup 
    Reply  Fri Jun 4 22:48:24 2010, rana, Laser, Laser, progress on PSL setup 
Entry  Wed May 26 21:11:00 2010, tarac, Laser, Laser, progress on PSL setup  
Entry  Tue Feb 14 23:35:04 2012, Frank, Notes, BEAT, proposed (new) cable delay setup cable-delay_v4.jpg
Entry  Thu Jan 28 16:07:29 2010, Frank, Computing, DAQ, psl channels moved to C3 + new channels 
    Reply  Sat Aug 24 15:42:54 2013, tara, DailyProgress, Vacuum, pumping down the chamber 
    Reply  Thu Aug 29 13:25:49 2013, tara, DailyProgress, Vacuum, pumping down the chamber 
Entry  Wed May 25 18:29:09 2011, tara, Notes, optic, purchases 
    Reply  Mon May 30 15:23:53 2011, rana, Notes, optic, purchases 
    Reply  Tue May 31 11:31:18 2011, tara, Notes, optic, purchases 
    Reply  Wed Jun 1 01:50:35 2011, Koji, Notes, optic, purchases 
    Reply  Wed Jun 1 21:00:05 2011, Frank, Notes, optic, purchases 
Entry  Tue Sep 14 20:18:35 2010, tara, DailyProgress, Computers, pwr monitor for NPRO is added 
Entry  Fri Feb 26 15:15:56 2010, Tara Chalermsongsak, Laser, RC noise, quarter wave plate added/power from Ref and A Cavs measured 
Entry  Thu May 17 17:35:17 2012, tara, Notes, Purchases, quote from ATF for substrate and spacer 
    Reply  Thu May 31 15:10:57 2012, tara, Notes, Purchases, quote from Coastline 
Entry  Fri Sep 2 21:29:27 2011, Frank, Notes, RefCav, radiation shields & heater 
Entry  Fri Dec 23 18:39:10 2011, Frank, Notes, RefCav, radiative heater 
Entry  Thu Dec 29 17:56:39 2011, Frank, DailyProgress, RefCav, radiative heater 562.jpg
Entry  Thu Dec 29 23:57:28 2011, Frank, Photos, RefCav, radiative heater prototype 564.jpg569.jpg572.jpg574.jpg
    Reply  Mon Oct 3 23:54:19 2011, frank, tara, DailyProgress, , re mode matching 
    Reply  Tue Oct 4 23:20:57 2011, frank, tara, DailyProgress, , re mode matching 
Entry  Tue Oct 25 23:13:57 2011, Tara, Frank, DailyProgress, Seismic, re-measured the spring constant for the RTV springs 
Entry  Thu Dec 22 16:28:10 2011, Frank, DailyProgress, Seismic, re-measuring seismic coupling to cavities P1810521.JPG
Entry  Sun Feb 12 19:40:50 2012, Frank, DailyProgress, Seismic, re-measuring seismic coupling to cavities table2beat_TF.pngtable2f_TF.pngfnoise_RCAV.png
Entry  Thu Dec 8 15:59:21 2011, Frank, Summary, PMC, realignment 
    Reply  Thu Dec 8 20:28:06 2011, tara, Summary, PMC, realignment 
    Reply  Thu Dec 8 21:06:10 2011, Frank, Summary, PMC, realignment 
    Reply  Fri Dec 9 06:32:24 2011, Tara, Summary, PMC, realignment 
Entry  Mon Dec 20 19:55:11 2010, tara, DailyProgress, optic, rearraging optics for beat measurement 
    Reply  Thu Dec 23 22:41:28 2010, tara, DailyProgress, optic, rearraging optics for beat measurement 
    Reply  Sun Dec 26 02:42:47 2010, tara, DailyProgress, optic, rearraging optics for beat measurement 
    Reply  Mon Dec 27 02:51:33 2010, tara, DailyProgress, optic, rearraging optics for beat measurement beat_2010_12_27.png
Entry  Fri Nov 8 03:36:44 2013, tara, DailyProgress, optic, redo- PMC path 
    Reply  Mon Nov 11 19:37:13 2013, tara, DailyProgress, optic, redo- PMC path 
Entry  Wed Feb 15 14:09:34 2012, Frank, DailyProgress, BEAT, reduced RG58 cable length to optimum value RG58_134ft.png
Entry  Thu Sep 9 23:03:40 2010, tara, Summary, RefCav, reduced back reflection  
    Reply  Wed Jul 17 18:29:37 2013, Erica, DailyProgress, fiber optic, reducing drift in the recombined beam 
    Reply  Sat Jul 20 23:39:09 2013, Erica, DailyProgress, fiber optic, reducing drift in the recombined beam 
    Reply  Tue Jul 23 10:29:12 2013, Erica, DailyProgress, fiber optic, reducing drift in the recombined beam shielded_10s_TEK0005.PNGunshielded_10s_TEK0027.PNG
Entry  Sun Feb 24 01:16:26 2013, tara, DailyProgress, RefCav, refcav and mount assembly photo(9).JPGphoto(8).JPG
Entry  Tue Jun 29 15:13:26 2010, Frank, Notes, RefCav, refcav physical properties 
Entry  Fri Jan 15 11:35:17 2010, Frank, Laser, RefCav, refcav update 100_0542.JPG
ELOG V3.1.3-