40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  PSL, Page 47 of 52  Not logged in ELOG logo
ID Date Author Type Category Subjectup Text Attachments
  1111   Wed Mar 6 21:56:12 2013 taraDailyProgressVacuumnote on feedthroughFeedthrough channel (as seen from the connector
outside of the chamber)
1-6: heater on cavity#98 : 85.4 Ohm
  
  1822   Sat Mar 4 17:01:00 2017 yinziDailyProgressTempCtrlnpn transistor buffer and metal piece measurementsSo I put together a little test circuit
to test out a NPN BJT buffer circuit with
a TIP122 transistor and an OP27 op amp. Power
 6x 
  1824   Thu Mar 9 15:02:46 2017 awadeDailyProgressTempCtrlnpn transistor buffer and metal piece measurementsWhat exactly is the offset? Is there some
threshold voltage the BJT requires before
it starts conducting, maybe one should expect
  
  438   Mon Dec 20 22:52:55 2010 ranaHowToPMCnuts The RefCav pole is 37 kHz, not
37 MHz.
To minimize the RFAM, you just look
  
  439   Thu Dec 23 22:26:14 2010 ranaHowToPMCnutsAh right, that's embarassing. I'll try
that.

  
  67   Wed Feb 17 15:40:04 2010 FrankLaserLaserold 100mW NPROdoes anyone know the typical operating
current for the 100mW lightwave laser model
? (M126N-1064-100) It's typically ~1.1A for
  
  18   Sat Nov 21 17:27:32 2009 FrankMiscRefCavold Minco heatersfound
four old Minco heaters (model HR5494-106)
(from 1995) .  This type with 106 Ohms
  
  241   Wed Jul 28 22:11:11 2010 FrankNotesDAQold channel connections - blocks TB2 and TB4- personal notes -
current cross-connect connections
PMC_RFPDDC:
  
  242   Wed Jul 28 22:12:41 2010 FrankNotesDAQold connections - J4 / J5- personal notes -
VMIC3123 (16bit)
J-4:
  
  90   Tue Mar 23 00:26:43 2010 Frank, TaraMiscRefCavongoing workover the weekend we baked the two AR-coated
windows for the new chamber.  Bob doesn't
need the oven the next couple of days so
  
  1106   Wed Feb 27 10:16:09 2013 koji, taraDailyProgressVacuumopening vac chamberWe opened the vacuum chamber and brought
the stack with the 8" cavities out to
the clean bench. New 1.45" cavities
  
  1108   Sun Mar 3 22:08:26 2013 taraDailyProgressVacuumopening vac chamber I found all necessary parts for the
heater (crimp connectors, heating wire).
I'll bake all parts once all the wiring is
 IMG_2255.JPGIMG_2258.JPGheater.pngdownload.jpg 
  602   Wed May 18 20:51:35 2011 taraDailyProgressopticoptic layout for new fss setupI planned the layout for new fss setup.

The new setup has 1) both cavities
 fss_layout_2011_05_18.png 
  603   Thu May 19 11:32:46 2011 taraDailyProgressopticoptic layout for new fss setupI added more details on the layout, and
necessary half wave plates in the beam path.
 fss_2011_05_18.png 
  614   Tue Jun 14 23:07:03 2011 taraDailyProgressopticoptic layout for new fss setupThe mode matching for new FSS is calculated.
The plan is shown below.
 
 2aom_fss.png 
  628   Mon Jul 18 02:20:01 2011 taraDailyProgressopticoptic layout for new fss setup  The
new mode matching for optics in front of
the cavities is done.  The rest (for
 2aom_fss_2011-07-15.png 
  629   Mon Jul 18 11:41:22 2011 ranaDailyProgressopticoptic layout for new fss setupThere's no need to use such a large
spot size on either the AOM or the EOM. 
When using high power this could
  
  631   Wed Jul 20 15:54:21 2011 taraDailyProgressopticoptic layout for new fss setup  I edited the layout so that the
spots in both AOMs are 200 um. I'll list
what optics we might have to buy.
 2011_07_20_layout.png 
  632   Wed Jul 20 23:00:30 2011 FrankDailyProgressopticoptic layout for new fss setupthe lens and mirror are in the ATF, a second
VCO is in the left cabinet.
 
  
  1050   Tue Sep 18 02:35:56 2012 taraDailyProgressRefCavoptical contact practicingI got the mirror blanks for optical contact
practicing. I tried to contact them together,
but I have not succeeded yet.
 IMG_1764.jpg 
  388   Wed Nov 10 20:04:13 2010 taraSummaryPMCoptical gain vs Vrf for side bands I checked that the optical
gain in PMC loop increases as the power in
the sideband increases. The result is 10.7
 dBvsV.png 
  726   Tue Nov 8 18:51:38 2011 taraDailyProgressopticoptics for RFAMI added mirrors to pick up stray beams
just before the cavities. These beams will
be used for monitoring RFAM.
 IMG_2186_ACAV.jpgIMG_2187_RCAV.jpg 
  739   Tue Nov 29 01:50:40 2011 taraDailyProgressopticoptics for RFAMI made some minor adjustment to the optics
layout so that the reflected beam at the
PBS before the cavity can be used to measure
 RFPD_setup.jpg 
  1484   Mon Aug 25 03:56:17 2014 taraHowToNoiseBudgetoptimization for ETM with a-Si/SiO2 coatings  I used optimization codes for ETM.
The optimization reduce the PSD of Brownian
noise by ~ 3/4 (in units of [m^2/Hz]) from
 opt2_aSi.pngopt2_RT.png 
  1486   Wed Aug 27 03:21:53 2014 ranaSummaryopticoptimization for ETM with a-Si/SiO2 coatings  I filled in more values for a-Si
at 120 K into the wiki
that Matt Abernathy set up. Then I ran
 aSi_120_Layers_60000.pdfaSi_R_60000.pdfaSi_120_TOnoise_60000.pdf 
  832   Thu Feb 16 23:27:50 2012 Frank, TaraNotesBEAToptimized cable-delay setup sensitivityStarted characterizing the cable-delay
setup with the right length of cable (134ft
of RG58 for 160MHZ). After checking the change
 cable-delay_v5.pngmixer_termination-01.pngLO_power.pngLO_power2.png 
  826   Tue Feb 14 21:21:19 2012 FrankDailyProgressBEAToptimum cable length for delay line & comparison with LP-filternow as we know that the optimum loss of
the delay line is 8.68dB we can calculate
the optimum cable length.
 optimum_cable_length.png 
  1586   Thu Oct 8 22:48:36 2015 ranaSummaryNoiseBudgetorder the heat shieldsIf you can't install python, you can
run it all in the Sage Math Cloud for free.

Also, please post the final design
  
  48   Thu Feb 4 20:13:53 2010 FrankLaserLaseroutput coupler to acav changedexchanged the old mirror (T330-HR, T331-AR)
by a simple Y1-1025-45P to get more power.
measured laser power : 7.17W
  
  1403   Mon Feb 3 23:56:07 2014 taraPhotosopticpacking mirror I"m packing the mirrors so that
they are ready to be shipped to G. Cole.
The mirrors are packed properly, see 
  
  892   Thu Mar 29 18:50:51 2012 taraNotesNoiseBudgetparameters for coating brownian noise calculationI make a list of parameters found in literature.
This will be used for estimate the coating
Brownian noise level and its error.
  
  895   Mon Apr 2 22:33:21 2012 taraNotesNoiseBudgetparameters for coating brownian noise calculationCoating Brownian noise with uncertainty
(worst & best case scenarios)
 
 nb_with_uncertainty.png 
  649   Wed Aug 3 18:06:32 2011 RaphaelDailyProgressElectronics Equipmentpdrf progressHey,
I measured the optical transfer function
with more points (again after the floppy
  
  820   Sun Feb 12 12:21:09 2012 FrankDailyProgressBEATpeak huntingDid a little bit of peak hunting to clear
our frequency span of interest from those
massive mechanical resonances we currently
 peak_reduction.pngmirrordamping.jpg 
  835   Thu Feb 23 13:40:00 2012 Koji, FrankDailyProgressNoiseBudgetperformance of tuned experiment- incoming -
We did optimize the alignment, power
levels etc and tweeked almost every knob
 beat_2012_02_22.pngbeat_zoom.png 
  502   Wed Feb 16 21:29:17 2011 taraNotes perl script for SLOWDC PID control addedA perl script/ an medm screen are
created for SLOWDC PID control. The gain
is not optimized yet. Some debugging might
  
  512   Thu Feb 24 15:47:10 2011 FrankHowToComputersperl script parameters for both loops inconsistentafter rebooting both crates i found that
the perl script parameters for both loops
are inconsistent with what's documented in
  
  515   Thu Feb 24 23:02:30 2011 taraHowToComputersperl script parameters for both loops inconsistentYes, I changed the numbers to see the response
and haven't logged
or changed the  values in the start
  
  871   Wed Mar 7 00:43:05 2012 FrankHowToNoiseBudgetphase noise and other thingsVERY
IMPORTANT ! (HAS
TO BE MEASURED NEXT BEFORE ANYTHING ELSE)
  
  169   Sun Jun 20 02:17:06 2010 ranaElectronicsRefCavphase noise of IFR + Rubidiumsee
this entry
  
  823   Mon Feb 13 13:42:43 2012 FrankNotesBEATphase/group delay for RG58 (and other cables)measured the delay for the old cable (RG58): 
dPhi=180deg, df=600KHz 
  
  1011   Mon Jul 2 19:01:18 2012 SarahDailyProgressPDphotodiodes behind cavities Tara and I put another photodiode
behind ACAV, so that now there are two photodiodes
behind each cavity.This is necessary because
 2012_07_02.JPG 
  1012   Mon Jul 2 23:44:59 2012 taraNotesPDphotodiodes behind cavitiesAfter installing the second pd behind ACVA,
I tried to re-measure RIN behind ACAV and
RCAV again. The measured RIN from ACAV and
 RIN.png 
  805   Sat Jan 28 02:41:45 2012 FrankPhotosopticphotos of cavity input optics just for reference which part is/was where
for later...
 IMG009.jpgIMG010.jpgIMG011.jpgIMG012.jpg 
  1384   Thu Nov 7 05:08:13 2013 taraDailyProgressNoiseBudgetphotothermal noise in SiO2/Ta2O5I add the photo thermal noise effect in
the noise budget. With ISS, photothermal
noise should be sufficiently small.
 beat_2013_11_07.pngbeat_2013_11_07.fig 
  1388   Wed Nov 20 18:19:01 2013 taraDailyProgressNoiseBudgetphotothermal noise in SiO2/Ta2O5I compared our beat measurement with results
from Numata2003 and TNI. They agree well.
I'm quite certain that we reach Brownian
 beat_compare.pngbeat_compare.fig 
  529   Wed Mar 2 23:20:49 2011 FrankDailyProgressSeismicpiezo shaker updated - TF measurement startedKoji and i updated the shaker today. We
replaced the short multilayer piezoelectric
actuator (10mm) by a longer one (20mm) from
 HV-amp_modified_D980352-A.pdf 
  1040   Mon Aug 27 14:24:06 2012 taraNotesScheduleplan for upgraded thermal noise probe experiment 
 The 1.45" cavities have
arrived. So I think it is a good time I layout
 IMG_1579.JPG2_laser_setup.png 
  482   Tue Feb 8 13:50:01 2011 FrankNotesRefCavplz no more temp servo tuning - want to take databy tuning the servo Tara unlocked both
cavities and they are out of range right
now, so plz no more temp servo tuning until
  
  287   Tue Aug 17 15:57:11 2010 FrankNotesBEATpower on beat PD- personal notes -
New Focus PD:
power from ACAV: 0.958mW
  
ELOG V3.1.3-