40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  PSL, Page 46 of 52  Not logged in ELOG logo
ID Date Author Type Category Subjectup Text Attachments
  56   Sun Feb 7 18:29:06 2010 FrankLaserLasernew channels + changesadded the following channels:
C3:PSL-RCAV_DIFFPWR : diffracted
power (single pass) measured behind curved
  
  749   Wed Dec 7 23:13:37 2011 FrankNotesDAQnew channels for EOM temp stabHave added 8 new 16bit channels. Terminal
block is tied to the frame of the table enclosure
right next to the BNC breakout panel near
  
  843   Sun Feb 26 02:18:38 2012 FrankNotesDAQnew channels for in-vac sensorsthe new AD590 sensors are physically connected
to

    VME3123, C0 S3 (RCAV)
  
  166   Wed Jun 16 00:10:36 2010 FrankComputingDAQnew channels for temp ctrl of both cavitiessome new channels for the temp ctrl of
the two cavities, most of them for debugging
purposes only
  
  761   Fri Dec 9 11:55:21 2011 FrankNotesDAQnew channels from second VME crateAdded the following channels. Data is valid
from now on.
# RF-AM monitor channels (not used
  
  2604   Wed Dec 9 18:13:12 2020 PacoMiscEquipment loannew focus 1811Borrowed two broadband PDs (new focus 1811)
and one power supply unit (new focus 0901)
from CTN into Crackle.
  
  61   Mon Feb 8 22:03:32 2010 FrankLaserRC noisenew resultseverything is back, pointing is much much
less, power modulation too, ugf of the other
loop is much higher - but nevertheless the
 refcav-noise_2010-02-08.png 
  37   Sun Jan 24 18:35:47 2010 FrankLaserRefCavnew slow actuator values- more insulation to the refcav chamber
added
actual slow actuator values for both
  
  665   Fri Sep 2 20:19:31 2011 Frank, TaraDailyProgressRefCavnew stack partschecked if the cavities fit on the new
support, they do  . We've put the assembled new stack
  
  1360   Mon Oct 7 19:53:53 2013 taraDailyProgressSeismicnew table legs installedNew legs were installed.  The table
is floated. The cables for signals/ power
supplies will be reconnected later
 newleg.jpg 
  1370   Tue Oct 22 04:34:12 2013 taraDailyProgressSeismicnew table legs installedAfter installing the table legs, I have
been trying to measure the beat. However,
there is an unknown scattered light noise
  
  236   Mon Jul 26 20:43:30 2010 FrankSummaryComputersnew workstationi got an old workstation and have converted
it into a new linux workstation for the PSL
lab.
  
  300   Fri Aug 20 00:00:42 2010 FrankSummaryDAQnew/old channels for transmitted light of refcavas we moved the channels from the 16bit
card to the 12bit card we also changed the
channel name for the transmitted light of
  
  704   Thu Oct 13 00:24:35 2011 FrankDailyProgressRefCavnext iteration of refcav stackwe got the stainless compression springs
and i cleaned them together with the all
the other parts for the radiation shield/heater
  
  2354   Tue Jun 4 20:44:21 2019 ranaSummaryOthernext steps
Fix the temperature control so
that the fluctuation over hours time scale
is low as Tara/Evan had it. This will allow
  
  701   Mon Oct 10 11:17:46 2011 FrankNotesPurchasesnitrogen bottle replacedwe got the new nitrogen bottle this morning.
We could check the price for nitrogen and
compressed air bottles to see if it's worth
  
  815   Wed Feb 8 22:10:56 2012 frank, taraDailyProgressBEATnoise budget and beatThe noise budget is updated and plotted
with today's beat measurement.
 beat_2012_02_08.png 
  816   Thu Feb 9 22:31:03 2012 frank, taraDailyProgressBEATnoise budget and beatNoise calculation from PD in PLL: ( I actually
asked Koji once and did this already, see
psl:730 .
 TF_gain.pngnb_2012_02_09.pngnb_2012_02_09.png 
  411   Mon Nov 29 14:34:35 2010 taraNotesNoiseBudgetnoise budget updateI
updated the noise budget, see the plot below.
LO phase noise and RIN are updated in this
 nb_2010_11_29.pngbeat_and_RIN_2010_11_29.matpsl_nb_2010_11_29.m.zipPhase_Noise_160MHz_100HzRange_1.txt.zip 
  1286   Wed Aug 7 18:53:20 2013 EricaDailyProgressfiber opticnoise budget, Matlab notes.[IMG]elog:1286/1[/IMG]

 noise_budget.PNGP1030427.JPG 
  1423   Wed May 7 12:27:25 2014 taraNotesNoiseBudgetnoise comparisonI plotted our measurement together with
other experiments. The source file and fig
files are attached below.
 df_compare.pngdx_compare.pngdf_compare.figdx_compare.figExp_compare.zip 
  1424   Fri May 9 17:10:25 2014 taraNotesNoiseBudgetnoise comparisonAdd the measurement from
AlGaAs coating, and Silicon refcav (see CRYO:1045
 df_compare2.pngdx_compare2.pngEXP_compare2.zip 
  947   Mon Apr 30 01:41:18 2012 taraDailyProgressBEATnoise due to air leaking from legsI suspected that the air leaking from the
legs might cause  noise in acoustic
bandwidth, so I measured the beat signal
 beat_inputrange.pngbeat_2012_04_29_compare.png 
  1266   Tue Jul 30 15:48:47 2013 EricaDailyProgressfiber opticnoise for GYRO[quote]

  
  555   Mon Mar 28 22:47:48 2011 taraNotesBEATnoise huntingI noticed that when the power to both cavities
increases (6 mW to 12 mW), the beat noise
get smaller at high frequency, broadband
 ampTF.pngRFPDnoise.png 
  1290   Fri Aug 9 16:00:14 2013 taraNotesNoiseBudgetnoise huntingI measured the slope of the error signal
for ACAV path to be 200 kHz/V. This will
  
  1305   Fri Aug 16 22:05:27 2013 taraDailyProgressBEATnoise hunting Noise hunting is in progress, I checked
the error noise from ACAV and RCAV loops
and compared them to the beat. The beat is
 nb_short_cav.pngnb_short_cav.figbeat_psd.jpg 
  1307   Tue Aug 20 20:10:01 2013 taraDailyProgressBEATnoise huntingNoise hunting is in progress. Today I identified
that scattered light from the window is one
of the problem.
 beat_2013_08_20.png 
  496   Mon Feb 14 21:38:10 2011 taraNotesElectronics Equipmentnoise level from cable delay setup, SR560, The noise floor for cable delay
method, and SR560 noise level are measured.
The result is plotted below. We are not sure
 cable_delay_noise.pngcable_delay_noise.figsr560corner.pdfdata_2011_02_14.matcode_2011_02_14.m 
  289   Wed Aug 18 00:07:37 2010 FrankDailyProgress noise level of beat signali tried a couple of things today to figure
out what determines the low frequency noise
level of the beat measurement. 
  
  500   Wed Feb 16 00:02:51 2011 FrankDailyProgressElectronics Equipmentnoise of SR560to have real data for comparison i measured
the noise of the SR560 for different (high)
gain settings.
 7x 
  1193   Tue Jun 11 00:45:48 2013 taraNotesNoiseBudgetnoisebudget for 8" SiO2/Ta2O5 cavity

    

       
            
 sk2009nb.pngsk2009nb.fig 
  1194   Tue Jun 11 16:46:52 2013 taraNotesNoiseBudgetnoisebudget for 8" SiO2/Ta2O5 cavitynote about the calculation for coating
Brownian noise in a finite size mirror .
==Coatings Parameters==
 getCoatBrownian2.m.zip 
  1195   Wed Jun 12 01:34:27 2013 KojiNotesNoiseBudgetnoisebudget for 8" SiO2/Ta2O5 cavityWait. Do you mean that you found the
last push to match the experiment and the
calcualtion?
  
  1196   Wed Jun 12 14:32:22 2013 not KojiNotesNoiseBudgetnoisebudget for 8" SiO2/Ta2O5 cavity

    

       
            
  
  1197   Wed Jun 12 14:49:47 2013 KojiNotesNoiseBudgetnoisebudget for 8" SiO2/Ta2O5 cavityCareful check is necessary as usual, but
for now let me say congraturation!
  
  1198   Fri Jun 14 02:36:22 2013 taraNotesNoiseBudgetnoisebudget for 8" SiO2/Ta2O5 cavityI'm checking the result for the calculation. 
I think it is too early to celebrate.
  
  1199   Tue Jun 18 11:53:17 2013 taraNotesNoiseBudgetnoisebudget for 8" SiO2/Ta2O5 cavityAfter careful checks, the estimated result
is still below the measurement. For our geometry,
the result from SK2009 is similar to that
 spacer_br_8_edge.png 
  1007   Thu Jun 28 16:52:42 2012 FrankDailyProgressPDnot laser power driftthe funny shape i see for that particular
diode is NOT caused by power fluctuations
- it's real. The diode shows that huge change
 panel5.jpgC30655_15um_PS.png 
  799   Wed Jan 25 23:41:38 2012 frank, taraDailyProgressopticnot much improvement on mode matching We tried to redo the mode matching to RCAV
by adjusting the lense position using translational
stages. However the result does not improve
 2012_01_25_3.jpg2012_01_25_1.jpg 
  315   Mon Aug 30 20:11:51 2010 taraNotesComputersnote for resetting psl crate   C3:PSL-ACAV_TEMPAVG that tells the
average temperature from ACAV is dead. Frank
told me to reboot the PSL crate.
  
  316   Mon Aug 30 22:16:51 2010 FrankNotesComputersnote for resetting psl crate set temp for the ACAV should be 37.3, that
was the value since about a week. see here
: http://131.215.115.52:8080/PSL_Lab/307
  
  1517   Mon Sep 15 04:32:21 2014 taraNotesBEATnote for tonight beat RCAV transPD_DC :0.54 V
ACAV transPD_DC: 0.16 V (loop might
oscillate when DC level was measured, need
  
  1518   Mon Sep 15 07:18:38 2014 EvanNotesBEATnote for tonight beat

    

       
            
 noiseBudget.pdf 
  1111   Wed Mar 6 21:56:12 2013 taraDailyProgressVacuumnote on feedthroughFeedthrough channel (as seen from the connector
outside of the chamber)
1-6: heater on cavity#98 : 85.4 Ohm
  
  1822   Sat Mar 4 17:01:00 2017 yinziDailyProgressTempCtrlnpn transistor buffer and metal piece measurementsSo I put together a little test circuit
to test out a NPN BJT buffer circuit with
a TIP122 transistor and an OP27 op amp. Power
 6x 
  1824   Thu Mar 9 15:02:46 2017 awadeDailyProgressTempCtrlnpn transistor buffer and metal piece measurementsWhat exactly is the offset? Is there some
threshold voltage the BJT requires before
it starts conducting, maybe one should expect
  
  438   Mon Dec 20 22:52:55 2010 ranaHowToPMCnuts The RefCav pole is 37 kHz, not
37 MHz.
To minimize the RFAM, you just look
  
  439   Thu Dec 23 22:26:14 2010 ranaHowToPMCnutsAh right, that's embarassing. I'll try
that.

  
  67   Wed Feb 17 15:40:04 2010 FrankLaserLaserold 100mW NPROdoes anyone know the typical operating
current for the 100mW lightwave laser model
? (M126N-1064-100) It's typically ~1.1A for
  
ELOG V3.1.3-