Entry  Tue Nov 10 09:29:10 2015, Antonio, DailyProgress, BEAT, PLL and EAOM noise generated 
The intensity noise that I have noticed after the EAOM installation disappeard with the use of a PBS before it.

Has to be mentioned that the light coming from the EAOM becomes eliptical with following power ratios at the PBS after theEAOM:

Pinc = 1.59mW (p-polarized);
    Reply  Tue Nov 10 12:00:59 2015, Antonio, DailyProgress, BEAT, PLL and EAOM noise generated 
The north cavity is now in place with 48% visibility! 




Quote:



The intensity
Entry  Tue Jan 12 11:51:31 2016, Antonio, Summary, Environment, Table legs table&legs.pdftable&legs_small.pdf
Table height

Currently the height of the optical table is 27.5" (see attached PDF). We would like to increase its height.

 
Entry  Wed Feb 24 19:20:16 2016, Antonio, Summary, Environment, Enclosure legs 
Enclosure legs cleaning

 

Before we install the enclosure with new legs some cleaning is required.

Entry  Tue Mar 8 18:34:06 2016, Antonio, Summary, PMC, PMC preparation 
This morning I sent an email to Evan in order to obtain PMC documentation. 

For now the only documents found is a mechanical
drawing E1400332. I am aware of additional 2 documents that he wrote for this design. I also asked for the electronic/servo
    Reply  Wed Mar 9 16:18:42 2016, Antonio, Summary, PMC, PMC preparation 
O rings and screws have been ordered!!!




Quote:



This morning I sent an
Entry  Tue Apr 5 16:09:54 2016, Antonio, Notes, PMC, Short time plan 
This is my short time plan rough proposal for the period left of Tara's stay.

1. PMC number 1

- Locking
Entry  Tue Apr 5 16:16:14 2016, Antonio, DailyProgress, Environment, Sprinkler WP_20160405_11_42_02_Pro.jpgWP_20160405_11_42_41_Pro.jpg
One of the last few steps left was to put back the sprinkler. Much more complicated and longer than I thought, but

It is Done!!!

Entry  Thu Apr 7 02:00:08 2016, Antonio, DailyProgress, PMC, PMC locking 
Following the previous elog entry today we succeeded in locking the PMC. 

 

As a reminder this is only a temporary setup. The optical path need to be re-design in order to allow
Entry  Sun Apr 10 20:13:14 2016, Antonio, DailyProgress, PMC, PMC glass PZT  
The PZT of the glass PMC does not seem broken (at least looking at the FSR).

I have implemented the PMC glass again, in order to verify if the PZT has enough range and or if it was functional.

We thought that it may have been broken and we were in the process of removing it from
Entry  Fri May 27 21:10:54 2016, Antonio, Summary, FSS, FSS frequency modulation 6x
Summary

Analysis of the frequency modulation for the FSS loop has been done (may be I have repeated it )

as we want to increase the frequency modulation from the current 21.5MHz to something
Entry  Sat Jun 25 18:12:56 2016, Antonio, DailyProgress, optic, North path construction progress North_layout_progress.graffleNorth_layout_progress.graffleNorth_layout_progress.pdfbeam_profile_after_lambda_2.pdfbeam_profile_before_AEOM.pdf
North Path

SUMMARY


The north path is going to be redesign because we want to be able to implement the PMC once we have all the electronics ready.
Entry  Sat Jun 25 19:25:38 2016, Antonio, DailyProgress, Environment, Enclosure sealed  
I have ultimated the work started few months ago about sealing the enclosure with the tape to avoid air air flowing from the top.

The work has been completed.
Entry  Sun Jun 26 21:08:17 2016, Antonio, DailyProgress, optic, North path construction progress: PMC MM lenses  North_layout_progress_V2.pdfbeam_profile_to_PMC.pdf
Summary

I have added two lenses in order to create a waist of 330um for when the PMC will be implemented.

Not satisfied about the size of the beam. This has to be improved, but we are close enough. I am thinking
Entry  Wed Jun 29 15:20:40 2016, Antonio, Notes, BEAT, Plan decided on June 28th 2016 timeline.pdf
In line with what we already started we decided:

1. Build the North and South optical paths by July 17th (12:59pm) (Antonio North path for now, Andi South path) 


Both the paths must to be able to host the PMC, bb-EOM, AOM, and 2 resonant EOM in each of them


2. Week of
Entry  Sat Jul 2 11:06:03 2016, Antonio, Summary, FSS, FSS frequency modulation 2 HOMlinear_cav_L3_68cm_R1m_V2.pdfHOMlinear_cav_L3.68cm_R1m_V2_zoom_in.pdfHOMdist_cav_L3.68cm_R1m_V2_zoom_in.pdf
Summary (Entry 1633 revised)

Analysis of the frequency modulation for the FSS loop
has been done 
Entry  Sat Jul 2 16:12:49 2016, Antonio, Notes, FSS, FSS : THINGS TO BE DONE (some notes) 
In order to have a frequency stabilization system (FSS) working with a new frequency modulation (FM)

I collect some notes of things that need to be done;

In vacuum cavities
Entry  Mon Jul 4 16:38:24 2016, Antonio, DailyProgress, Mode matching, Mode matching plan to the North Cavity: few options 12x
Summary

A couple of mode matching solutions for the north cavity that look promising have been found.
I'm thinking the following plan 2c to be implemented.
Entry  Thu Jul 7 10:37:46 2016, Antonio, DailyProgress, Mode matching, Mode matching plan to the North Cavity: CORRECTION MM_beam_Prop_f3c.pdfMM_North_Sensitivity_f3cfinal.pdfNorth_layout_progress_dist_MM_final.pdf
Motivation
I have realized that I made a mistake measuring the distance of the North cavity waist from the PMC (waist).
I have done the same analysis presented in ID 1660 and adjusted the plan.
Entry  Fri Jul 8 22:09:33 2016, Antonio, DailyProgress, optic, North path construction progress 2 IMG_1095.jpgIMG_1205_(2).jpgNorth_layout_progress_dist_MM_final.pdfNorth_layout_progress_dist_MM_final.pdf
North Path

Summary
Following entry ID 1649, additional work along the North Path has been done
    Reply  Wed Jul 13 20:03:07 2016, Antonio, Notes, FSS, FSS : THINGS TO BE DONE (some notes) 
That is perfectly in agreement with my analysis.

 

36MHz and 37MHz are good according with our analysis if 1MHz separation between the two modulation frequencies is good enough;
Entry  Thu Jul 14 20:57:07 2016, Antonio, DailyProgress, optic, South path construction progress North_South_layout_progress_dist_final_copy.pdf
Summary
Following ID 1649 we start the implementation of the South cavity path.
Some optics has been placed along the path.
Entry  Sat Jul 23 20:21:16 2016, Antonio, DailyProgress, Mode matching, South cavity Mode matching 
Summary
Following the previous entry the South path construction was at the point where mode matching was needed for the South Cavity.
We also needed to install a resonant photodiode for the PDH lock and start to prepare the optic in transmission.
Entry  Sun Jul 24 20:03:38 2016, Antonio, DailyProgress, South Cavity, Mode matching and cavities locking 
Summary
Today I have aligned the South cavity with the beam prepared and described in the previous ID entry.

Conclusion
Entry  Sat Jul 30 19:08:08 2016, Antonio and Andrew, DailyProgress, BEAT, beat note work and PLL 
Summary


Today we have worked reying to improve the beat note signal in its amplitude.
We also connected all the parts for the PLL
loop and tryied to lock the PLL but we did not succeded;
We noticed at some pint a noise at the input of the sr560 which pheraps prevents the
Entry  Thu Apr 7 21:52:43 2016, Antonio and Tara, DailyProgress, PMC, PMC number 2 
Today we have tested the second PMC that we have assembled.

 

We have obtained the 00 mode;
Entry  Tue Aug 4 11:28:48 2015, Antonio, Aidan, Summary, Environment, DC transmission channels to Acromag and floor cleaning 
Yesterday the DC transmission (ISS photodiode, North cavity) channel to acromag has been added and the viewer has been set on the Ubuntu
machine. The channel has been also calibrated (against voltage externally injected). We are going to add other channels from the VME crates and work on the
PDH board interface in order to remote control this unit.
Entry  Mon Aug 10 18:44:01 2015, Antonio, Aidan, Summary, FSS, FSS interface board err_sig2.jpgD0902049-v1(front_panel).pdf
We figured out that when we sweep the laser PZT and we want to look at the error-signal, this can be monitored at the "mixer" output of the
FSS interface board while the switch test/off/ramp is on ramp. However we need to understand what this switch does when it is OFF.

 
Entry  Wed Jul 13 00:06:17 2016, Antonio, Andrew, DailyProgress, Electronics Equipment, North path construction progress 3 
Summary
Following ID 1649 & 1663 electronics for the FSS of the North path has been hooked up.
The North cavity was ready for locking today.
Entry  Wed Jul 13 20:43:03 2016, Antonio, Andrew, DailyProgress, North Cavity, Cavity locked!!! IMG_1277.JPG
Motivations
We had problems with the error-signal monitor from the TTFSS board. We thought that something 
was wrong with it because the SNR was very small. Before starting the process of nailing down what was
Entry  Thu Jul 28 19:56:08 2016, Antonio, Andrew, DailyProgress, BEAT, Searching for beat note 
Summary
In the last two days we have been searching for beat note, in order to get 
our "first" noise measurement of the PLL. While we monitor the beat note of the lasers
Entry  Tue Aug 25 19:12:36 2015, Antonio, Eric, DailyProgress, Computers, GPIB installed 
Today Eric provided his Python scripts (and installed them) needed to connect the SR785 and the AG4395A devices with our
lab computer through the GPIB interface. With these scripts we are able to download measurement data that we take by using the two above mentioned
devices, plot them and set the measurement settings directly from the computer. Mainly we need to use two of them, i.e. with following commands:
Entry  Tue Oct 20 19:43:05 2015, Antonio/Aidan/Eric, DailyProgress, optic, Optics inventory Screen_Shot_2015-10-20_at_7.41.07_PM.png
The work that we need to do for the TCN experiment is at the state where we cannot easily go further without improving the lab organization.

I have collected the optics (1064nm) and made an inventory which is on dokuwiki: https://nodus.ligo.caltech.edu:30889/ATFWiki/doku.php?id=main:experiments:psl:optics.
At moment is little but I hope we can keep this updated and we can follow the policy that is written there.
Entry  Wed Nov 29 19:19:46 2017, Bono, HowTo, FSS, Stuck in a FSS and You Can't Out of It? 
Oi mate, seems like you've gone and got stuck in the FSS. Get out and start buzzing those mounts!
    Reply  Thu Nov 30 20:51:18 2017, Bono, HowTo, FSS, Stuck in a FSS and You Can't Out of It? awadeSong.mp4
Hey Bono do you like awade's song




Quote:



Oi mate, seems like you've gone and got stuck in the FSS. Get out
Entry  Mon Apr 22 02:25:58 2013, Chloe, DailyProgress, ECDL, ECDL Grating/Current Controller 1200mm_grating.PNG1800mm_grating.PNGErickson08au.pdf
Grating choices:
In the literature, people seem to use 1800/mm spacing. Attached are efficiency graphs found on Thorlabs for 1200/mm and 1800/mm spacing. At 1064nm
(which is where we are interested in tuning to), the efficiency drops off for the 1800/mm spacing grating. This could be fixed if we use an angle close
Entry  Thu Jun 20 17:23:40 2013, Chloe, DailyProgress, ECDL, Noise Calculations saito.pdfpsd_noise.png
 Updates from the past few days...  (sorry I forgot to elog but I've been keeping notes in my notebook)
Monday 6/17
I met with Tara to discuss how to get started. In order to create a useful ECDL, it must be capable of meeting the noise requirements of the experiments
    Reply  Fri Jun 21 16:47:30 2013, Chloe, DailyProgress, ECDL, Noise Calculations Noise.pdf
Today, I wrote up my noise calculations in a nicer way so that I have it on hand in the future. They are attached here. I found a mistake from the
last elog entry, so it turns out that we are looking at a linewidth of about 440 kHz (or a PSD noise of 191 Hz/rtHz). This still meets the requirements
of the experiment, and can be adjusted as necessary, since I can still increase the length of the cavity to decrease the noise. 
    Reply  Mon Jun 24 11:14:04 2013, Chloe, DailyProgress, ECDL, Noise Calculations Noise.pdf


    
        
            Quote:
        
        
            

           Today, I wrote up my noise calculations in a nicer way so that I have it on hand in the future. They are attached here. I found a mistake
    Reply  Mon Jun 24 17:48:30 2013, Chloe, DailyProgress, ECDL, Noise Calculations Noise.pdf


    
        
            Quote:
        
        
            

           
            
                
           
    Reply  Tue Jun 25 17:51:34 2013, Chloe, DailyProgress, ECDL, Noise Calculations Noise2.pdf
I spent this morning looking at the mounts and other mechanical parts necessary for the ECDL. This afternoon, I met with Tara to discuss how I should
run some noise calculations for including a servo to reduce frequency noise. I will deal with the mechanical logistics later while we are waiting for the
diode, etc. from Thorlabs. 
    Reply  Wed Jun 26 17:13:21 2013, Chloe, DailyProgress, ECDL, Noise Calculations Noise2.pdf
Today I spent the morning searching the literature on Web of Knowledge to see if anyone had ways to reduce the noise level of an ECDL further by tweaking
the parameters of the Littrow configuration (our current plan, where first order beams coming off the diffraction grating go back into the laser diode).
It may be worth examining configurations with more mirrors to lengthen the cavity, but otherwise my search was not particularly helpful. We may need to
Entry  Fri Jun 28 17:59:15 2013, Chloe, Notes, ECDL, Parts to Order 
Yesterday I spent awhile reading literature, then met with Rana and Tara. Rana wanted us to produce a sketch of the physical layout of our ECDL and generate
some graphs comparing different parameters (diodes, gratings, cavity lengths) so we could determine exactly what parameters we'd need to order parts. Last
night I made the plots in Mathematica (BAD). This morning I did the sketch of the mechanical layout of the ECDL. Will make a nicer sketch with the changes
    Reply  Sun Jun 30 22:58:45 2013, Chloe, DailyProgress, ECDL, Noise Calculations compare_experiments.pngcompare_diodes.pngcompare_gratings.pngcompare_length.png100_0068.JPG
I redid the plots from my meeting on Friday with Rana and Tara in Matlab, comparing different components. They are attached here. I'm still trying to
get the minor gridlines to show up. 
Plot 1: Comparing noise levels of different experiments to determine which we will use as our standard. 
    Reply  Mon Jul 1 17:39:09 2013, Chloe, Notes, ECDL, Parts to Order 
 
Today, I spent the day working on the first progress report for SURF, which Tara would like by Wednesday. I have everything complete except a nice
figure of the planned experimental setup, which I will do tomorrow. 
    Reply  Tue Jul 2 17:40:22 2013, Chloe, Notes, ECDL, Parts to Order 
 
Today, the last of the parts we've decided on were ordered. 
Dmass said they do not have any extra current drivers, nor does Eric Gustafson. Eric said that if we can find a commercial board, I can ask Alex
    Reply  Wed Jul 3 17:05:55 2013, Chloe, Notes, ECDL, Parts to Order 
 
Today I made some edits to my progress report for SURF, mainly with the graphs in Matlab. I tried to make them look better. The updated version
is on the SVN. 
    Reply  Mon Jul 8 18:00:12 2013, Chloe, Notes, ECDL, Parts to Order 
I made more edits to my SURF progress report. I need to remember to make good looking graphs in Matlab without being reminded by Tara. I just submitted
the pdf of the final version. It is also on the SVN in the ECDL documents folder. 
I spent more time trying to understand the difference between heterodyne and homodyne detection, and trying to figure out which method I would
    Reply  Tue Jul 9 17:57:49 2013, Chloe, Notes, ECDL, Preparing for parts to arrive approximate.SLDPRTsketch_of_part.PNG
I spent the morning figuring out how to wire the TEC/thermistor/TEC controller together. After reading through the manual from last time (http://www.thorlabs.com/Thorcat/15900/TED200C-Manual.pdf),
I also have a pretty good idea of how to change the settings of the controller so that it will work. I have some notes of my own but it's mostly self contained
to the manual. When the parts arrive, I should be prepared to make the TEC work. 
Entry  Wed Jul 10 17:54:58 2013, Chloe, DailyProgress, ECDL, Solidworks Design base.SLDPRTdiode_mount.SLDPRTgrating_mount.SLDPRTlid.SLDPRTsketch_with_lid.PNG
I attached the Solidworks parts that I built. I put these together with the parts we are ordering from Thorlabs (they have the Solidworks parts on their
website) and have an image of the assembly attached as well. 
 I spent today building the elements we want machined in Solidworks. We have a few pieces we need to get machined: 
ELOG V3.1.3-