  101   Sun Apr 11 21:04:08 2010 FrankMiscRefCavheating power requirementmeasured the power required to heat the
new chamber to ~40C in order to design the
driver circuit.
  
  102   Mon Apr 12 10:57:33 2010 Tara ChalermsongsakLaserLaserCorrection for higher order mode frequencyLast time, the calculated beam waist I
got was based on two identical mirrors with
no reflecting coating layers on the back
 3.png 
  103   Mon Apr 12 11:04:15 2010 Tara ChalermsongsakLaserLaserPSL layout for new setupThe layout for the new PSL setup
( lenses, and their positions are to be calculated.)
 psl_layout_04_11_10.png 
  104   Tue Apr 13 00:25:52 2010 FrankComputingDAQnew RT frontendhave put everything together. right now
the frontend keeps bitching about one of
the disks used for the frames, even if this
  
  105   Tue Apr 13 14:50:39 2010 FrankComputingDAQnew RT frontend


   
        
            
  
  106   Tue Apr 13 15:06:35 2010 Tara ChalermsongsakLaserRefCavHOM, from carrier and both sidebandsHOM frequency shift for RefCav is plotted
below. The second one has clearer dots.
Y axis is the frequency shift in
 HOM_df_219.32MHz_02.pngHOM_df_219.32MHz_03.png 
  107   Tue Apr 13 18:23:41 2010 Tara ChalermsongsakElectronics TF of PDH BoxI measured TF of PDH box, D0901351, (The
one we have was modified). This box sends
the signal to VCO.
 tf_PDH_04_09.pngtf_PDH_04_09_phi.png 
  108   Thu Apr 15 16:42:32 2010 FrankElectronicsRefCavAD590 readout-box modifiedin order to gain more s/n ratio i modified
the existing AD590 readout-box a little bit.
I assumed that we wanna operate the cavity
  
  109   Fri Apr 16 10:45:04 2010 Tara ChalermsongsakElectronics Control Loop for PSLThis is the control loop for the current
PSL setup.
There are still components to be
 psl5_fig.pnglinpsl5.m 
  110   Wed Apr 21 15:21:52 2010 Tara ChalermsongsakElectronics TF of PDH BoxI calculated the TF of the modified PDH
box and fit it with the measurement. The
comparison does not match perfectly. I'll
 2010_04_20_bode_com.png 
  111   Wed Apr 21 15:39:46 2010 ranaElectronics TF of PDH Box
Use LISO for circuit simulation.
  
  112   Sun May 2 19:18:36 2010 FrankMiscRefCavreference cavity moved to new chamberi finally moved the reference cavity to
the new chamber and pump it since Friday.
The legs are now insulated and it comes with
  
  113   Mon May 3 15:47:58 2010 Tara ChalermsongsakElectronics TF of PDH Box    The values of some r
and c in the circuit are corrected, I used
wrong values last time ( details will be
 TF_5_3.png 
  114   Tue May 4 03:40:00 2010 ranaLaserRC noiseupdated noise budget code is in SVN  rc_sio2_300.pdf 
  115   Thu May 6 00:05:29 2010 Frank, JanComputingRC noisecomsol/matlab modelWe finished
the first comsol model which where we can
modify the geometry automatically. The problem
  
  116   Thu May 6 11:01:03 2010 FrankMiscRC noisemodel now in the svni created
a folder "frank" in the 40m-svn.
It currently contains a subfolder "comsol"
  
  117   Fri May 7 15:51:43 2010 FrankMiscRefCavupdated schematic for new setup   refcav-setup_v1.png 
  118   Mon May 10 00:29:04 2010 FrankMiscRefCavion pump current still too highi checked the current of the ion pump.
It's still at 75uA, much too high. So i think
i have a tiny leak somewhere but i can't
  
  119   Tue May 11 22:26:34 2010 Tara ChalermsongsakLaserLaserBeam waist measurement 
I measured the beam waist of Lightwave
NPRO 1064nm 100mW with WinCamD.
 beamwaist.png 
  120   Wed May 12 22:10:13 2010 Tara ChalermsongsakLaserLaserBeam waist measurementI measured the beam waist again. The laser
was operated at full power ~100mW. A mirror
attenuated the beam to 60 uW and ND 
 fit.png 
  121   Thu May 13 13:41:32 2010 Tara ChalermsongsakLaserLasermode matching from laser to PMC


  
  122   Thu May 13 20:56:57 2010 FrankLaserLaser100mW NPRO problemswe still have serious problems with the
100mW laser head. I traced it down to the
connection between the PCB and the hermetically
  
  123   Mon May 17 21:32:35 2010 Tara ChalermsongsakLaserLaserPMC alignmentI'm trying to align the PMC.  The
transducer is connected to the PMC servo
card's HV out.
  
  124   Tue May 18 15:21:12 2010 Tara ChalermsongsakLaserLaserPMC alignment


   
        
            
  
  125   Wed May 19 00:18:45 2010 Tara ChalermsongsakLaserLaserPMC alignmentAfter checking the PMC servo card,
ramp signal goes to ext DC 
HV in is applied properly,
 D980352-B.pdf 
  126   Thu May 20 21:50:35 2010 taracLaserLaserPMC is almost ready to be locked We still need two SMA cables. One
connects between 21.5Mhz EOM and PMC servo
card, another one connects between PMC PD
  
  127   Mon May 24 09:56:19 2010 ranaLaserPMCPMC is almost ready to be lockedYou should make sure not to blow up
the PMC PD: i.e. the total power on the
PD out of lock should be less than 100
  
  128   Mon May 24 19:30:15 2010 ranaLaserPMCPMC is almost ready to be locked


   
        
            
  
  129   Mon May 24 19:40:12 2010 taracLaserLaserRef Cav prealignment 
Dear elog
  I don't know why I can't lock
  
  130   Tue May 25 17:01:57 2010 taracLaserLaserPMC cavity is locked      After adding
another 1/2 plate to have P wave into
the cavity, I can lock the PMC cavity. It's
  
  131   Wed May 26 21:11:00 2010 taracLaserLaserprogress on PSL setup  
I add the broad band EOM in the beam
path. After adjusting the periscope, I can
  
  132   Thu May 27 11:18:51 2010 taracLaserLaserSchematic for FSS servo and Lightwave 126 1064 100mWThis is the schematic of PSL fss servo.
I have to make sure that the modulation
voltage will not exceed the controller's
 D980536-D.pdfnpro125126_ds_cl_ae_020606-1.pdf 
  133   Thu May 27 18:20:42 2010 taracLaserLaserAligning RefCavI switched the cable from the 10W controller
to the original controller for 100 mW laser.
It is working well now, the cables are tied
  
  134   Fri May 28 20:46:14 2010 taracLaserLaserProgress on PSL: Aligning RefCav Since the frequency of the laser
going into RefCav is determined by PMC ,I
decided to temporarily remove the PMC for
  
  135   Sat May 29 12:01:17 2010 FrankLaserLaserProgress on PSL: Aligning RefCav


   
        
            
  
  136   Sun May 30 22:49:28 2010 taracLaserLaserRefCav is lockedI see TEM00 transmitted beam out of RefCav.
I think I have to fine tune the FSS gain
a bit more becasue the spot still oscillates
 Photo_36.jpg 
  137   Tue Jun 1 07:39:47 2010 FrankLaserLaserRefCav is locked


   
        
            
  
  138   Tue Jun 1 14:16:00 2010 taracLaserLaserPSL setup: next stepThis is the schematic for PSL setup.
http://131.215.115.52:8080/PSL_Lab/117
At this point, Pre Mode Cleaner (PMC)
  
  139   Tue Jun 1 19:26:41 2010 taracLaserLaserA mirror gets into the insulation's borderI'm aligning the AOM. The R=0.5m mirror's
position crosses the insulation border by
1.5" (see attached picture.) The black
 Photo_37.jpg 
  140   Thu Jun 3 00:52:37 2010 taracLaserLaserAligning AOM I'm aligning the AOM and maximizing
the diffracted beam's power by positioning
the AOM and adjusting the beam size by moving
 97-02848-01r0.pdf 
  141   Thu Jun 3 08:42:44 2010 FrankLaserLaserAligning AOM


   
        
            
 AOM3080-194.JPG 
  142   Thu Jun 3 14:47:58 2010 FrankLaserLaserAligning AOM


   
        
            
  
  143   Thu Jun 3 15:45:39 2010 FrankLaserLaserAligning AOM


   
        
            
  
  144   Thu Jun 3 22:00:21 2010 FrankLaserLaserAligning AOM


   
        
            
  
  145   Thu Jun 3 23:55:38 2010 taracLaserLaserAligning AOM 2: the Return of the BeamI'm aligning
double pass AOM. After maximizing the power
of the 1st order of the transmitted beam,
 Photo_38.jpg 
  146   Fri Jun 4 00:03:17 2010 JenneComputingEnvironmentSpam


   
        
            
  
  147   Fri Jun 4 22:10:24 2010 taracLaserLaserprogress on PSL setupThe maximum
power after AOM double pass is 37%, worse
  
  148   Fri Jun 4 22:48:24 2010 ranaLaserLaserprogress on PSL setup

    
        
  
  149   Sat Jun 5 16:17:05 2010 KojiComputingEnvironmentSpamThere is a trick to put a message on top.

1. Change "Encoding" below
  
  150   Sun Jun 6 23:01:58 2010 taracLaserLaserRefCav is almost lockedWhen I
try to lock the cavity, it's not very stable
yet. The transmitted power fluctuates alot.
  