40m
QIL
Cryo_Lab
CTN
SUS_Lab
CAML
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
PSL, Page 37 of 53
Not logged in
List
|
Find
|
Login
|
Help
Full
|
Summary
| Threaded |
Collapse
|
Expand
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
Summary
HowTo
DailyProgress
Notes
Photos
Misc
2601 Entries
Goto page
Previous
1
,
2
,
3
...
36
, 37,
38
...
51
,
52
,
53
Next
Mon Jan 10 14:27:11 2011, Jan, Summary, PEM, Weekly plots; starting date 01/01/2011
Thu Jan 11 12:33:06 2018, awade, Summary, Schedule, Weekly todo list W2:2018
Tue Aug 27 18:56:58 2019, anchal, DailyProgress, NoiseBudget, What values of Loss Angles are good?
Thu Aug 3 01:24:05 2017, awade, DailyProgress, FSS, Wiring up FSS boxes into acromag cards
Tue Jul 9 14:47:44 2013, Erica, Notes, BEAT, Writing progress report
Tue Jul 23 11:43:00 2013, Evan, DailyProgress, Electronics Equipment, Zach's op-amp recommendations
Mon Sep 20 20:57:40 2010, tara, DailyProgress, PMC, a part of PMC servo is verified
Fri Feb 12 12:46:38 2010, Tara Chalermsongsak, Laser, Laser, a picture of beam path on the optic bench
Tue Jun 10 17:00:18 2014, tara, Notes, NoiseBudget, aLIGO Noise budget with uncertainties in material parameters
Mon Jun 23 17:13:06 2014, tara, Notes, NoiseBudget, aLIGO Noise budget with uncertainties in material parameters
Mon Jun 23 19:23:57 2014, rana, Notes, NoiseBudget, aLIGO Noise budget with uncertainties in material parameters
Thu Jun 26 03:41:31 2014, tara, Notes, NoiseBudget, aLIGO Noise budget with uncertainties in material parameters
Wed Jul 2 20:05:32 2014, tara, Notes, NoiseBudget, aLIGO Noise budget with uncertainties in material parameters
6x
Fri Feb 26 11:40:47 2010, Frank, Computing, DAQ, acav VME crate stopped working
Wed Feb 1 15:46:51 2012, tara, DailyProgress, Electronics Equipment, acav characterization
Thu Feb 2 23:51:32 2012, frank, tara, DailyProgress, Electronics Equipment, acav characterization
Sat Feb 4 03:18:08 2012, tara, DailyProgress, Electronics Equipment, acav characterization
Mon Feb 6 22:35:49 2012, frank, tara, DailyProgress, Electronics Equipment, acav characterization
Thu Feb 4 22:01:27 2010, Frank, Laser, RefCav, acav re-aligned
Wed Mar 7 11:39:37 2012, Tara, Frank, Notes, TempCtrl, acav temp tuning - 2nd try
Thu Mar 31 20:47:32 2011, tara, DailyProgress, Seismic, accelerometer installed on the table
Fri Apr 27 10:30:57 2012, Frank, Notes, Acoustics, acoustic damping from plexiglas and sandwich structures
Tue May 1 03:12:58 2012, frank, tara, DailyProgress, Acoustics, acoustic enclosure for input beam
Tue May 1 23:58:21 2012, frank, tara, DailyProgress, Acoustics, acoustic enclosure for input beam
Wed May 2 19:48:32 2012, frank, tara, DailyProgress, Acoustics, acoustic enclosure for input beam
Thu May 3 22:26:14 2012, frank, tara, DailyProgress, Acoustics, acoustic enclosure for input beam
Fri May 4 20:19:58 2012, frank, tara, DailyProgress, Acoustics, acoustic enclosure for input beam
Wed May 9 03:11:33 2012, frank, tara, DailyProgress, Acoustics, acoustic enclosure for input beam
Wed May 30 23:39:15 2012, frank, tara, DailyProgress, Acoustics, acoustic enclosure for input beam
Wed May 30 23:39:41 2012, frank, tara, DailyProgress, Acoustics, acoustic enclosure for input beam
Fri Jun 1 01:00:30 2012, frank, tara, DailyProgress, Acoustics, acoustic enclosure for input beam
Mon Apr 16 03:42:39 2012, Frank, Notes, Purchases, acoustic insulation
Mon Sep 18 19:45:04 2017, awade, Craig, DailyProgress, Electronics Equipment, acromag1 reboot
Sat Sep 11 02:04:26 2010, tara, DailyProgress, DAQ, added PD for power monitoring
Mon Jul 29 13:30:26 2013, Erica, DailyProgress, BEAT, adding resistor, capacitor, and sockets
Tue Jul 30 12:23:41 2013, Erica, DailyProgress, BEAT, addressed noise problem, DC signal
Mon Dec 20 14:35:23 2010, tara, Notes, Electronics Equipment, adjusting polarization for 35.5 MHz EOM
Mon Mar 5 17:15:03 2012, Frank, Notes, Schedule, air spring isolation
Fri Mar 2 01:02:50 2012, Frank, Notes, Seismic, air spring isolation design
Thu Mar 8 21:48:46 2012, Frank, Koji, DailyProgress, Seismic, air spring isolation installation finished
Thu Mar 8 01:15:50 2012, Frank, DailyProgress, Seismic, air spring isolation installed
Wed Dec 7 11:01:24 2022, aaron, Summary, Safety, airflow monitor installation
Fri Feb 19 18:23:24 2010, Tara Chalermsongsak, Laser, RefCav, alignment for measuring beat between 2 cavities
Thu Mar 25 13:05:59 2010, Frank, Misc, RefCav, all parts baked
Mon Aug 30 23:47:30 2010, tara, Notes, Environment, antack (ants attack)
Tue Aug 31 13:26:32 2010, Frank, Notes, Environment, antack (ants attack)
Mon Mar 29 17:46:41 2010, Frank, Tara, Misc, RefCav, assembled new vacuum chamber
Wed Nov 28 20:37:57 2012, tara, HowTo, RefCav, assembling short ref cav
Tue Apr 10 00:50:56 2012, frank, tara, DailyProgress, optic, bad PBS
Wed Apr 11 02:44:29 2012, frank, tara, DailyProgress, optic, bad PBS
Goto page
Previous
1
,
2
,
3
...
36
, 37,
38
...
51
,
52
,
53
Next
ELOG V3.1.3-