  448   Mon Jan 10 14:27:11 2011 JanSummaryPEMWeekly plots; starting date 01/01/2011 So I don't know what's going on,
but the table is doing something really terrible.
Maybe it vibrates as a response to ventilation,
 Plot7.jpgPlot9.jpg 
  2041   Thu Jan 11 12:33:06 2018 awadeSummaryScheduleWeekly todo list W2:2018Updated todo list is up on the labdata
git ctn_labdata/issue/10.

Priority over the next week is
  
  2401   Tue Aug 27 18:56:58 2019 anchalDailyProgressNoiseBudgetWhat values of Loss Angles are good?The new noisebudget code follows Hong
et al . PRD 87, 082001 (2013) calculations
to calculate Coating Brownian noise. This
 ComparisonOfUsingDifferentLossAngles.pdf 
  1848   Thu Aug 3 01:24:05 2017 awadeDailyProgressFSSWiring up FSS boxes into acromag cardsTo date we have been manually engaging the
TTFSS boxes for the PDH locking of the lasers
to reference cavities.  There is a sub-D
  
  1229   Tue Jul 9 14:47:44 2013 EricaNotesBEATWriting progress reportJuly 7, 2013
Took pictures of the setups for mode matching
and recombining the beams.  I added beam
 MMsetup1.pngbeamRecomb.pngbeat_frequency.jpgP1020680.JPG 
  1252   Tue Jul 23 11:43:00 2013 EvanDailyProgressElectronics EquipmentZach's op-amp recommendationsZach wrote up his thoughts on how to choose
the right op-amp in [URL=http://nodus.ligo.caltech.edu:8080/AdhikariLab/1752]ATF:1752[/URL].
  
  368   Mon Sep 20 20:57:40 2010 taraDailyProgressPMCa part of PMC servo is verified 

I
measured PMC's TF between MIXER OUT and PCMON,
 TFcompare.pngTFcompare.png 
  65   Fri Feb 12 12:46:38 2010 Tara ChalermsongsakLaserLasera picture of beam path on the optic benchI took a picture of the setup in
PSL lab, and drew a line for laser path.
I omit the mode cleaning part since it's
 psl_full_beam.jpg 
  1428   Tue Jun 10 17:00:18 2014 taraNotesNoiseBudgetaLIGO Noise budget with uncertainties in material parameters I'm working on estimating aLIGO sensitivity
when material uncertainties are taken into
account. I have a result for a reference
 BRnoise_YLYH.pngBRnoise_YH.pngBRnoise_YL.pngBR_YH_correlate.pngYoungs_dep.m.zip 
  1432   Mon Jun 23 17:13:06 2014 taraNotesNoiseBudgetaLIGO Noise budget with uncertainties in material parametersI'm estimating the BNS range
of aLIGO. Here is a quick note about the
calculation.
  
  1433   Mon Jun 23 19:23:57 2014 ranaNotesNoiseBudgetaLIGO Noise budget with uncertainties in material parameters 
 That GWINC link is more than
a year old. You're best off just updating
  
  1436   Thu Jun 26 03:41:31 2014 taraNotesNoiseBudgetaLIGO Noise budget with uncertainties in material parameters

    

       
            
 BNS.pngstrain.pngstrain.png 
  1444   Wed Jul 2 20:05:32 2014 taraNotesNoiseBudgetaLIGO Noise budget with uncertainties in material parametersThe calculation for LIGO
astronomical reach with uncertainties are
updated. See the details below.
 6x 
  79   Fri Feb 26 11:40:47 2010 FrankComputingDAQacav VME crate stopped workinglast night one of the DAQ cards failed
and the acav crate stopped working, so also
the temp stabilization of the analyzer cavity
  
  808   Wed Feb 1 15:46:51 2012 taraDailyProgressElectronics Equipmentacav characterizationI'm working on characterizing ACAV loop
to check if the loop is good enough for the
coating noise measurement. The results show
 inloop.pngnb_2012_02_01.pnginputrange.pngACAVOLGTF.png 
  809   Thu Feb 2 23:51:32 2012 frank, taraDailyProgressElectronics Equipmentacav characterizationWe measured the TF of marconi using PLL
loop. Marconi has flat response up to around
200kHz. This is quite good and we can certainly
 2012_02_02_block.png2012_02_02_pll.pngmarconi_TF.png 
  810   Sat Feb 4 03:18:08 2012 taraDailyProgressElectronics Equipmentacav characterizationI checked the TF of the amplifier used
in the ACAV loop because I did not measure
that yesterday.  The amplifier's TF
 2012_02_03_pll.pngPLL_TF.png 
  811   Mon Feb 6 22:35:49 2012 frank, taraDailyProgressElectronics Equipmentacav characterizationTF from all components except the sevo
is measured (collectively). This will help
us to determine what kind of servo(UPDH)
 TF.png 
  49   Thu Feb 4 22:01:27 2010 FrankLaserRefCavacav re-alignedacav is now re-aligned. As Tara stopped
aligning the AOM i will use the NPRO pzt
to lock it (instead of the VCO). Then i will
  
  873   Wed Mar 7 11:39:37 2012 Tara, FrankNotesTempCtrlacav temp tuning - 2nd tryprevious measurement is invalid - due to
changing in the alignment from floated table
to unfloated table over night we don't know
  
  559   Thu Mar 31 20:47:32 2011 taraDailyProgressSeismicaccelerometer installed on the tableToday we installed two accelerometers
on the table, for vertical and horizontal(beamline)
positions.
 accTF.png000_0004.jpg000_0006.jpgnb_2011_03_31.png 
  945   Fri Apr 27 10:30:57 2012 FrankNotesAcousticsacoustic damping from plexiglas and sandwich structuressandwich structures using plexiglas : "Damped
Windows for Aircraft Interior Noise Control"
http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.79.9176
  
  948   Tue May 1 03:12:58 2012 frank, taraDailyProgressAcousticsacoustic enclosure for input beamWe started making the acoustic enclosure
around the input beam area (second half of
the table, before the chamber). The frame
 IMG_0849.jpg 
  950   Tue May 1 23:58:21 2012 frank, taraDailyProgressAcousticsacoustic enclosure for input beamWe added the lid on top of the enclosure.
More work is needed to complete the box.
    We made the closing
 IMG_0851.jpg 
  951   Wed May 2 19:48:32 2012 frank, taraDailyProgressAcousticsacoustic enclosure for input beam      We measured
the frequency response(microphone out/signal
to speaker) to see how well we can shield
 IMG_0853.jpgIMG_0854.JPGIMG_0852.jpgresult.png 
  952   Thu May 3 22:26:14 2012 frank, taraDailyProgressAcousticsacoustic enclosure for input beamWe are still working on the acoustic shielding
panels. The work should be done by tomorrow.
 IMG_0855.JPGIMG_0856.jpg 
  953   Fri May 4 20:19:58 2012 frank, taraDailyProgressAcousticsacoustic enclosure for input beamThe enclosure box for input optics are
done. We still need to order more of the
nuts for one panel, but the box should provide
 IMG_0863.JPGIMG_0864.jpg 
  955   Wed May 9 03:11:33 2012 frank, taraDailyProgressAcousticsacoustic enclosure for input beamI check the performance of the enclosure
box for input optics. It neither improves
the beat signal that much.
 IO_lid_compare.pngIO_lid_compare.pngcomputer_compare.png 
  972   Wed May 30 23:39:15 2012 frank, taraDailyProgressAcousticsacoustic enclosure for input beamWe started installing the new acoustic
enclosure box for the beat path. It covers
the whole beat setup and the part for power
 IMG_1300.jpg 
  973   Wed May 30 23:39:41 2012 frank, taraDailyProgressAcousticsacoustic enclosure for input beamWe started installing the new acoustic
enclosure box for the beat path. It covers
the whole beat setup and the part for power
 IMG_1300.jpg 
  975   Fri Jun 1 01:00:30 2012 frank, taraDailyProgressAcousticsacoustic enclosure for input beamThe beat signal is measured with an adhoc
lid covering the enclosure on the beat part.
There are no significant improvement in the
 beat_2012_05_31.pngbeat_2012_05_31_b.png 
  917   Mon Apr 16 03:42:39 2012 FrankNotesPurchasesacoustic insulationordered thin (1in) t-channel aluminum frame
parts from mcmaster (similar to bosch framing,
but cheaper, link)
  
  1929   Mon Sep 18 19:45:04 2017 awade, CraigDailyProgressElectronics Equipmentacromag1 rebootAcromag1 and ws3 have both been reconnected
to the network and booted. 

New ModbusApp session is started
  
  357   Sat Sep 11 02:04:26 2010 taraDailyProgressDAQadded PD for power monitoring  A photodiode for measuring the laser
power reflecting from the Faraday isolator's
in port is added.
  
  1261   Mon Jul 29 13:30:26 2013 EricaDailyProgressBEATadding resistor, capacitor, and socketsJuly 26, 2013

Was able to place the 24k ohm resistor in
 w_o_capacitor_7_26_13.JPGcapacitor_7_26_13.JPGP1030066.JPGP1030070.JPG 
  1265   Tue Jul 30 12:23:41 2013 EricaDailyProgressBEATaddressed noise problem, DC signaljuly 29, 2913

Worked on progress report due Friday.
  
  436   Mon Dec 20 14:35:23 2010 taraNotesElectronics Equipmentadjusting polarization for 35.5 MHz EOMLast week I accidentally changed the polarization
of the beam to the 35.5 MHz EOM. So I optimize
it again to minimize an RFAM effect.
  
  866   Mon Mar 5 17:15:03 2012 FrankNotesScheduleair spring isolationmachined all steel parts myself this morning
and submitted them for welding to Mike. He
said we can pick it up at the end of the
  
  857   Fri Mar 2 01:02:50 2012 FrankNotesSeismicair spring isolation designafter talking several times to the machine
shop guys and checking stock at central we
came up with the following design for the
 vacuum_chamber_dualcav_with_beam.jpg 
  877   Thu Mar 8 21:48:46 2012 Frank, KojiDailyProgressSeismicair spring isolation installation finishedgot some T-connectors and connected all
four springs to the lab air supply. The pressure
of 32PSI is barely enough to float the chamber.
 IMG068.jpgIMG070.jpgair_spring_vertical_tf.png 
  875   Thu Mar 8 01:15:50 2012 FrankDailyProgressSeismicair spring isolation installed[Tara, Frank, Zach, Jenne]
i've picked up all parts, tapped
a few more holes and assembled the two beams.
 IMG056.jpgIMG058.jpgIMG063.jpgIMG065.jpg 
  2618   Wed Dec 7 11:01:24 2022 aaronSummarySafetyairflow monitor installationRueben from Technical Safety Services installed
and calibrated an Apex 1000 airflow monitor
for the fume hood in CTN. Its power supply
 IMG_3751.jpg 
  70   Fri Feb 19 18:23:24 2010 Tara ChalermsongsakLaserRefCavalignment for measuring beat between 2 cavitiesI finished aligning the beams from Ref
cavity and Acavity, broke a connector on
the PD we were going to used to measure the
  
  92   Thu Mar 25 13:05:59 2010 FrankMiscRefCavall parts bakedby now all parts are baked and ready for
assembly. The only part we couldn't bake
is the chamber itself. But Bob said that
  
  318   Mon Aug 30 23:47:30 2010 taraNotesEnvironmentantack (ants attack) I think ants are now building their
colony in the lab, even though there is no
garbage, they can find some food around here.
 IMG_1235.JPG 
  319   Tue Aug 31 13:26:32 2010 FrankNotesEnvironmentantack (ants attack)any results from the poison from 40m they
tried in the TCS lab? Did it work?If yes
we should get some for the other labs too....
  
  93   Mon Mar 29 17:46:41 2010 Frank, TaraMiscRefCavassembled new vacuum chamberwe cleaned
and assembled the new vaccum chamber. we
installed an electical feedtrough (for sensors
  
  1085   Wed Nov 28 20:37:57 2012 taraHowToRefCavassembling short ref cav[Peter, Tara], we assembled 2 short reference
cavities today. The bonding between the spacers
and mirrors are strong and holding the mirrors
 IMG_2029.jpgIMG_2034.jpg 
  905   Tue Apr 10 00:50:56 2012 frank, taraDailyProgressopticbad PBSWe noticed wide angle scattered light behind
the PBS in front of RCAV. The scattering
source is probably the curved mirror behind
  
  906   Wed Apr 11 02:44:29 2012 frank, taraDailyProgressopticbad PBSUpdate, beat measurement after several
optics replacement. Peaks around 10 Hz, 35
Hz show up this time. 
 beat_2012_04_10.png 